Using System Dynamics Simulation To Understand The Feedback Process In A Construction Project
The fast changing, complex, and dynamic environment in the construction project nowadays has led to frequent occurrences of last minute changes and reworks. Such frequent occurrences can influence performance in terms of project completion time, which the completion time will result in delay and hav...
| Main Authors: | Zainab, A. Malik, Cheng, Jack Kie |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Penerbit Universiti Malaysia Pahang
2017
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/18689/ http://umpir.ump.edu.my/id/eprint/18689/1/fim-2017-jackkie-Using%20System%20Dynamics%20Simulation%20To%20Understand.pdf |
Similar Items
Using System Dynamics Simulation to Understand the Feedback Process in a Construction Project
by: Zainab, A. Malik, et al.
Published: (2016)
by: Zainab, A. Malik, et al.
Published: (2016)
A system dynamics model to assess the interrelationship between different knowledge areas of PMBOK in a construction project
by: Zainab, A Malik
Published: (2018)
by: Zainab, A Malik
Published: (2018)
Importance of Project-oriented Organizational Culture in Knowledge Management Processes
by: Alghail, Adnan Ali, et al.
Published: (2017)
by: Alghail, Adnan Ali, et al.
Published: (2017)
Understanding the interrelationship between different knowledge areas in PMBOK through the development of system dynamics model
by: Cheng, Jack Kie, et al.
Published: (2017)
by: Cheng, Jack Kie, et al.
Published: (2017)
The Roles of Knowledge Management in Project Management towards Organizational Performance
by: Alghail, Adnan Ali, et al.
Published: (2017)
by: Alghail, Adnan Ali, et al.
Published: (2017)
Transformasi diri persediaan kehidupan pasca pandemik
by: Cheng, Jack Kie
Published: (2021)
by: Cheng, Jack Kie
Published: (2021)
Logistics-related knowledge process capabilities in Malaysian courier service industries
by: Fazeeda, Mohamad, et al.
Published: (2020)
by: Fazeeda, Mohamad, et al.
Published: (2020)
The Effect of Knowledge Management Capabilities on Project
Management Success
by: Alghail, Adnan Ali, et al.
Published: (2017)
by: Alghail, Adnan Ali, et al.
Published: (2017)
Integrating discrete event simulation and value stream map in improving body shop production performance
by: Azila-Nadiah, Dulli, et al.
Published: (2016)
by: Azila-Nadiah, Dulli, et al.
Published: (2016)
Lean Construction: An Effective Approach for Project Management
by: Ansah, Richard Hannis, et al.
Published: (2016)
by: Ansah, Richard Hannis, et al.
Published: (2016)
The problem of communication among stakeholder in construction project
by: Noramirah, Abdul Rahaman
Published: (2015)
by: Noramirah, Abdul Rahaman
Published: (2015)
The problem of resource planning in construction project in Kuantan
by: Siti Nor, Azahari
Published: (2016)
by: Siti Nor, Azahari
Published: (2016)
Essential Characteristics Of A Successful Construction Project Manager In The Malaysian Construction Industry
by: Chang, Khong Thong
Published: (2019)
by: Chang, Khong Thong
Published: (2019)
A linear programming model for product mix profit maximization in a small medium enterprise company
by: S., Mohd Baki, et al.
Published: (2020)
by: S., Mohd Baki, et al.
Published: (2020)
Modelling the knowledge management processes for planning and scheduling of construction projects based on state-of-the-art technology
by: Bahtiar, Siti Fazreena Idayu
Published: (2012)
by: Bahtiar, Siti Fazreena Idayu
Published: (2012)
Job stress and project performance among construction company in Terengganu
by: Mohammad Ikwan, Abdullah
Published: (2015)
by: Mohammad Ikwan, Abdullah
Published: (2015)
The influence of the big five personality traits in team selection for construction project
by: Chong, Yew Puay
Published: (2015)
by: Chong, Yew Puay
Published: (2015)
A study to identify the factor that causes project delay in construction at Terengganu
by: Nurul Syakirah, Mohd Ali
Published: (2016)
by: Nurul Syakirah, Mohd Ali
Published: (2016)
Business Process Outsourcing Performance Evaluation: A Lean-Agile Framework and Its Empirical Validation
by: Oluyinka, Oludapo Samson, et al.
Published: (2016)
by: Oluyinka, Oludapo Samson, et al.
Published: (2016)
Qualitative content analysis of sharps management practices in Hce’s in Malaysia: employee factor
by: Afiza, Abdullah Suhaimi, et al.
Published: (2020)
by: Afiza, Abdullah Suhaimi, et al.
Published: (2020)
Status and barriers impeding utilization of project management tools: epidemic for tripartite construction parties in Malaysia
by: Lee, Chia Kuang, et al.
Published: (2019)
by: Lee, Chia Kuang, et al.
Published: (2019)
The role of project managers in sustainable building process: a study on Malaysian construction industry
by: Suriani, Mat Noor
Published: (2013)
by: Suriani, Mat Noor
Published: (2013)
Ethics for multinational JV projects for construction work
by: Amanullah, Muhammad
Published: (2009)
by: Amanullah, Muhammad
Published: (2009)
The effects of non-excusable delay in construction project
by: Nor Shahira, Shaari
Published: (2014)
by: Nor Shahira, Shaari
Published: (2014)
Managing ergonomics risk factors on construction sites
by: Baird, Michelle Zainab
Published: (2007)
by: Baird, Michelle Zainab
Published: (2007)
A construct validation approach for exploring sustainability adoption in Pakistani construction projects
by: Ullah, Mehfooz, et al.
Published: (2020)
by: Ullah, Mehfooz, et al.
Published: (2020)
Project procurement method : the conflicts in construction projects procured under design and build method
by: Mai Ling, Teon
Published: (2014)
by: Mai Ling, Teon
Published: (2014)
A study of managing resistance that occurred in construction project
by: Noorfatin Liyana, Suhaimy
Published: (2014)
by: Noorfatin Liyana, Suhaimy
Published: (2014)
Project crashing in construction industry: investigation of the strategies, challenges and impacts
by: Muhammad Redho, Mardzuki
Published: (2013)
by: Muhammad Redho, Mardzuki
Published: (2013)
A study of causes and effects of project change in construction industry
by: Jee, Keh Lih
Published: (2013)
by: Jee, Keh Lih
Published: (2013)
The contribution of earned value analysis for cost controlling of construction projects
by: Shi Cia, Ng
Published: (2014)
by: Shi Cia, Ng
Published: (2014)
Application Comparison between Construction Quality Assessment System (CONQUAS 21) and Quality Assessment System in Construction (QLASSIC) for Construction Project
by: Lau, Yeong Cherng
Published: (2017)
by: Lau, Yeong Cherng
Published: (2017)
Interfacing and Complexity Issues in Project Management: A Case Study of A Condominium Construction Project in Klang Valley
by: Tan, Wei Oon
Published: (2016)
by: Tan, Wei Oon
Published: (2016)
The impact of organizational ethics to the project performance
by: Norhasimah , A Rahman
Published: (2014)
by: Norhasimah , A Rahman
Published: (2014)
Delivery capabilities impact project performance
by: Roziela, Hassan
Published: (2015)
by: Roziela, Hassan
Published: (2015)
Private finance initiative (PFI): concept and method of procurement for construction projects
by: Abdul Rashid, Khairuddin
Published: (2007)
by: Abdul Rashid, Khairuddin
Published: (2007)
Production process improvement using discrete event simulation A case study
by: Ahmad Nazif, Noor Kamar, et al.
Published: (2023)
by: Ahmad Nazif, Noor Kamar, et al.
Published: (2023)
Simulation of industrialised building system formation for housing construction
by: Zainal Abidin@Md. Taib, Ahmad Razin
Published: (2007)
by: Zainal Abidin@Md. Taib, Ahmad Razin
Published: (2007)
An evaluation of pre-construction contract variables influencing occupational safety & health performance in Malaysian design & build and design-bid-build construction projects
by: Thian, Kah Kien.
Published: (2011)
by: Thian, Kah Kien.
Published: (2011)
Review On Intellectual Capital And Its Components Towards Competitive Advantage In Universities
by: Alkhateeb, Abdullah N. A., et al.
Published: (2016)
by: Alkhateeb, Abdullah N. A., et al.
Published: (2016)
Similar Items
-
Using System Dynamics Simulation to Understand the Feedback Process in a Construction Project
by: Zainab, A. Malik, et al.
Published: (2016) -
A system dynamics model to assess the interrelationship between different knowledge areas of PMBOK in a construction project
by: Zainab, A Malik
Published: (2018) -
Importance of Project-oriented Organizational Culture in Knowledge Management Processes
by: Alghail, Adnan Ali, et al.
Published: (2017) -
Understanding the interrelationship between different knowledge areas in PMBOK through the development of system dynamics model
by: Cheng, Jack Kie, et al.
Published: (2017) -
The Roles of Knowledge Management in Project Management towards Organizational Performance
by: Alghail, Adnan Ali, et al.
Published: (2017)