Risk management in construction industry

Managing risk during construction period is very important process in order to achieve the project objective in terms of safety and health, cost, time and quality. Four elements in managing the risk effectively are begun by establishing organizational structure, process and resources to enhance its...

Full description

Bibliographic Details
Main Author: Fatin Izzati, Sulaiman
Format: Undergraduates Project Papers
Language:English
Published: 2017
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/18120/
http://umpir.ump.edu.my/id/eprint/18120/1/Risk%20management%20in%20construction%20industry.pdf
_version_ 1848820595254362112
author Fatin Izzati, Sulaiman
author_facet Fatin Izzati, Sulaiman
author_sort Fatin Izzati, Sulaiman
building UMP Institutional Repository
collection Online Access
description Managing risk during construction period is very important process in order to achieve the project objective in terms of safety and health, cost, time and quality. Four elements in managing the risk effectively are begun by establishing organizational structure, process and resources to enhance its performance. Therefore, this study is carried out to identify the risk that always occur in construction industry and also to determine the factor of risk in order to carried out the solution to prevent risk from occur. The study involved the G7 contractors registered with CIDB that have been involved in project area of Kuala Lumpur and also Kuantan. The total of 130 questionnaires was distributed and only 109 were returned answered which give a value of 84%. From the study, the risks that always occur in construction are machine and equipment problem and also manpower resources problem. Factor that contributes to the risk in construction industry are lack of site safety inspection and supervision, lack of adequate tool and equipment, lack of safety knowledge, lack of adequate lighting and also lack of compliance to governmental safety regulation. In order to minimize the risk and also to prevent the risk from occur, well planning of project process before project start should be done firstly follow by well manage machinery and equipment, established an efficient communication at the work place, assign a risk engineer and also develop the risk management workshop for employees.
first_indexed 2025-11-15T02:11:57Z
format Undergraduates Project Papers
id ump-18120
institution Universiti Malaysia Pahang
institution_category Local University
language English
last_indexed 2025-11-15T02:11:57Z
publishDate 2017
recordtype eprints
repository_type Digital Repository
spelling ump-181202023-11-23T08:01:35Z http://umpir.ump.edu.my/id/eprint/18120/ Risk management in construction industry Fatin Izzati, Sulaiman HD61 Risk Management TA Engineering (General). Civil engineering (General) Managing risk during construction period is very important process in order to achieve the project objective in terms of safety and health, cost, time and quality. Four elements in managing the risk effectively are begun by establishing organizational structure, process and resources to enhance its performance. Therefore, this study is carried out to identify the risk that always occur in construction industry and also to determine the factor of risk in order to carried out the solution to prevent risk from occur. The study involved the G7 contractors registered with CIDB that have been involved in project area of Kuala Lumpur and also Kuantan. The total of 130 questionnaires was distributed and only 109 were returned answered which give a value of 84%. From the study, the risks that always occur in construction are machine and equipment problem and also manpower resources problem. Factor that contributes to the risk in construction industry are lack of site safety inspection and supervision, lack of adequate tool and equipment, lack of safety knowledge, lack of adequate lighting and also lack of compliance to governmental safety regulation. In order to minimize the risk and also to prevent the risk from occur, well planning of project process before project start should be done firstly follow by well manage machinery and equipment, established an efficient communication at the work place, assign a risk engineer and also develop the risk management workshop for employees. 2017-01 Undergraduates Project Papers NonPeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/18120/1/Risk%20management%20in%20construction%20industry.pdf Fatin Izzati, Sulaiman (2017) Risk management in construction industry. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.
spellingShingle HD61 Risk Management
TA Engineering (General). Civil engineering (General)
Fatin Izzati, Sulaiman
Risk management in construction industry
title Risk management in construction industry
title_full Risk management in construction industry
title_fullStr Risk management in construction industry
title_full_unstemmed Risk management in construction industry
title_short Risk management in construction industry
title_sort risk management in construction industry
topic HD61 Risk Management
TA Engineering (General). Civil engineering (General)
url http://umpir.ump.edu.my/id/eprint/18120/
http://umpir.ump.edu.my/id/eprint/18120/1/Risk%20management%20in%20construction%20industry.pdf