Adoptation of engine for smaller enterprise (E4SE) performance measurement system (PMS) in small project based company in Malaysia

This research was conducted to test the validity of the new performance measurement system which is the Engine For Smaller Enterprise, E4SE model and make the recommendation implementation of the E4SE model in the small project based companies in the SMEs industry. The performance measurement system...

Full description

Bibliographic Details
Main Author: Lim, Pei Jiun
Format: Undergraduates Project Papers
Language:English
Published: 2016
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/15954/
http://umpir.ump.edu.my/id/eprint/15954/1/05.Adoptation%20of%20engine%20for%20smaller%20enterprise%20%28E4SE%29%20performance%20measurement%20system%20%28PMS%29%20in%20small%20project%20based%20company%20in%20Malaysia.pdf
_version_ 1848820084191002624
author Lim, Pei Jiun
author_facet Lim, Pei Jiun
author_sort Lim, Pei Jiun
building UMP Institutional Repository
collection Online Access
description This research was conducted to test the validity of the new performance measurement system which is the Engine For Smaller Enterprise, E4SE model and make the recommendation implementation of the E4SE model in the small project based companies in the SMEs industry. The performance measurement system of E4SE model is the tool to evaluate the internal and the external of the enterprises through different aspect such as through management level and level competitors or rivals. Thus, the future strategic plan will be developed in order to sustain survival of the companies. This performance measurement system framework includes the three main elements, Strategy Formulation Activities (SFA), Strategy Administration Activities (SAA) and Performance. The survey questionnaire was distributed to the management cadre or the company’s owner-manager of the company respectively. A total sample of 49 samples was used in this study. Research objective had been achieved through the data analysis finalized by using Microsoft Excel 2007. The results of this study showed that the small project based companies in the SMEs industry is suitable to implement the modified E4SE model based on the data collected and analysis in Malaysia. From this study, the implementations of the E4SE model in the small and medium industry not only increase the potential of the company, but also raising the awareness of the implementation performance measurement system in the organization.
first_indexed 2025-11-15T02:03:49Z
format Undergraduates Project Papers
id ump-15954
institution Universiti Malaysia Pahang
institution_category Local University
language English
last_indexed 2025-11-15T02:03:49Z
publishDate 2016
recordtype eprints
repository_type Digital Repository
spelling ump-159542023-03-22T07:08:12Z http://umpir.ump.edu.my/id/eprint/15954/ Adoptation of engine for smaller enterprise (E4SE) performance measurement system (PMS) in small project based company in Malaysia Lim, Pei Jiun HD Industries. Land use. Labor HD28 Management. Industrial Management This research was conducted to test the validity of the new performance measurement system which is the Engine For Smaller Enterprise, E4SE model and make the recommendation implementation of the E4SE model in the small project based companies in the SMEs industry. The performance measurement system of E4SE model is the tool to evaluate the internal and the external of the enterprises through different aspect such as through management level and level competitors or rivals. Thus, the future strategic plan will be developed in order to sustain survival of the companies. This performance measurement system framework includes the three main elements, Strategy Formulation Activities (SFA), Strategy Administration Activities (SAA) and Performance. The survey questionnaire was distributed to the management cadre or the company’s owner-manager of the company respectively. A total sample of 49 samples was used in this study. Research objective had been achieved through the data analysis finalized by using Microsoft Excel 2007. The results of this study showed that the small project based companies in the SMEs industry is suitable to implement the modified E4SE model based on the data collected and analysis in Malaysia. From this study, the implementations of the E4SE model in the small and medium industry not only increase the potential of the company, but also raising the awareness of the implementation performance measurement system in the organization. 2016-01 Undergraduates Project Papers NonPeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/15954/1/05.Adoptation%20of%20engine%20for%20smaller%20enterprise%20%28E4SE%29%20performance%20measurement%20system%20%28PMS%29%20in%20small%20project%20based%20company%20in%20Malaysia.pdf Lim, Pei Jiun (2016) Adoptation of engine for smaller enterprise (E4SE) performance measurement system (PMS) in small project based company in Malaysia. Faculty of Industrial Management, Universiti Malaysia Pahang.
spellingShingle HD Industries. Land use. Labor
HD28 Management. Industrial Management
Lim, Pei Jiun
Adoptation of engine for smaller enterprise (E4SE) performance measurement system (PMS) in small project based company in Malaysia
title Adoptation of engine for smaller enterprise (E4SE) performance measurement system (PMS) in small project based company in Malaysia
title_full Adoptation of engine for smaller enterprise (E4SE) performance measurement system (PMS) in small project based company in Malaysia
title_fullStr Adoptation of engine for smaller enterprise (E4SE) performance measurement system (PMS) in small project based company in Malaysia
title_full_unstemmed Adoptation of engine for smaller enterprise (E4SE) performance measurement system (PMS) in small project based company in Malaysia
title_short Adoptation of engine for smaller enterprise (E4SE) performance measurement system (PMS) in small project based company in Malaysia
title_sort adoptation of engine for smaller enterprise (e4se) performance measurement system (pms) in small project based company in malaysia
topic HD Industries. Land use. Labor
HD28 Management. Industrial Management
url http://umpir.ump.edu.my/id/eprint/15954/
http://umpir.ump.edu.my/id/eprint/15954/1/05.Adoptation%20of%20engine%20for%20smaller%20enterprise%20%28E4SE%29%20performance%20measurement%20system%20%28PMS%29%20in%20small%20project%20based%20company%20in%20Malaysia.pdf