The causes and effect of delay to handover the project in construction industry

This thesis is to identify the main cause of project delay and to know the effects that will be happen if the project was delay in construction industry at Kelantan. It is because construction industry is important to Malaysia and it is one of the catalysts to the economic growth in Malaysia. Other...

Full description

Bibliographic Details
Main Author: Nur Fatihah, Zakeri
Format: Undergraduates Project Papers
Language:English
Published: 2015
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/15945/
http://umpir.ump.edu.my/id/eprint/15945/1/The%20causes%20and%20effect%20of%20delay%20to%20handover%20the%20project%20in%20construction%20industry-CD%2010382.pdf
_version_ 1848820081974312960
author Nur Fatihah, Zakeri
author_facet Nur Fatihah, Zakeri
author_sort Nur Fatihah, Zakeri
building UMP Institutional Repository
collection Online Access
description This thesis is to identify the main cause of project delay and to know the effects that will be happen if the project was delay in construction industry at Kelantan. It is because construction industry is important to Malaysia and it is one of the catalysts to the economic growth in Malaysia. Other than that, this thesis also can help to improve the construction industry in Kelantan. This study also provides a lot of useful input and information to those involved in the construction industry both directly and indirectly. A survey was conducted to get the data and information about the causes and effects of project delay. The survey was conducted in construction industry at Kelantan. There are 73 respondents that involve in the survey.
first_indexed 2025-11-15T02:03:47Z
format Undergraduates Project Papers
id ump-15945
institution Universiti Malaysia Pahang
institution_category Local University
language English
last_indexed 2025-11-15T02:03:47Z
publishDate 2015
recordtype eprints
repository_type Digital Repository
spelling ump-159452022-05-31T08:29:15Z http://umpir.ump.edu.my/id/eprint/15945/ The causes and effect of delay to handover the project in construction industry Nur Fatihah, Zakeri HD28 Management. Industrial Management TH Building construction This thesis is to identify the main cause of project delay and to know the effects that will be happen if the project was delay in construction industry at Kelantan. It is because construction industry is important to Malaysia and it is one of the catalysts to the economic growth in Malaysia. Other than that, this thesis also can help to improve the construction industry in Kelantan. This study also provides a lot of useful input and information to those involved in the construction industry both directly and indirectly. A survey was conducted to get the data and information about the causes and effects of project delay. The survey was conducted in construction industry at Kelantan. There are 73 respondents that involve in the survey. 2015-12 Undergraduates Project Papers NonPeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/15945/1/The%20causes%20and%20effect%20of%20delay%20to%20handover%20the%20project%20in%20construction%20industry-CD%2010382.pdf Nur Fatihah, Zakeri (2015) The causes and effect of delay to handover the project in construction industry. Faculty of Industrial Management, Universiti Malaysia Pahang.
spellingShingle HD28 Management. Industrial Management
TH Building construction
Nur Fatihah, Zakeri
The causes and effect of delay to handover the project in construction industry
title The causes and effect of delay to handover the project in construction industry
title_full The causes and effect of delay to handover the project in construction industry
title_fullStr The causes and effect of delay to handover the project in construction industry
title_full_unstemmed The causes and effect of delay to handover the project in construction industry
title_short The causes and effect of delay to handover the project in construction industry
title_sort causes and effect of delay to handover the project in construction industry
topic HD28 Management. Industrial Management
TH Building construction
url http://umpir.ump.edu.my/id/eprint/15945/
http://umpir.ump.edu.my/id/eprint/15945/1/The%20causes%20and%20effect%20of%20delay%20to%20handover%20the%20project%20in%20construction%20industry-CD%2010382.pdf