A study on the factor effecting project delay in the housing construction
This research is about the factor effecting project delay in housing construction. The purpose of this study is to identify factor delay in the housing project, to find out lack of fund to finance the project to completion effected on project delay, to investigate mistakes during construction and pr...
| Main Author: | Fatin Fazlinda, Hamzah |
|---|---|
| Format: | Undergraduates Project Papers |
| Language: | English |
| Published: |
2016
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/15920/ http://umpir.ump.edu.my/id/eprint/15920/1/11.A%20study%20on%20the%20factor%20effecting%20project%20delay%20in%20the%20housing%20construction.pdf |
Similar Items
The causes and effect of delay to handover the project in construction industry
by: Nur Fatihah, Zakeri
Published: (2015)
by: Nur Fatihah, Zakeri
Published: (2015)
Dispute resolution in relation to delay of construction project
by: Soon, Tan Kian
Published: (2010)
by: Soon, Tan Kian
Published: (2010)
A study of delay sources of construction project in Kuantan area
by: Tan, Kean Wei
Published: (2015)
by: Tan, Kean Wei
Published: (2015)
Study on the factor that contribute to the financial problems of abandoned housing project in Malaysia
by: Nuramalina, Nuramalina
Published: (2017)
by: Nuramalina, Nuramalina
Published: (2017)
The causes of delay in construction project in Kuantan
by: Nur Azuwa, Ghazali
Published: (2017)
by: Nur Azuwa, Ghazali
Published: (2017)
The factors and effect of delay in government construction project (case study in Kuantan)
by: Mohd Rosazuwad, Mohamad@Muda
Published: (2010)
by: Mohd Rosazuwad, Mohamad@Muda
Published: (2010)
Prelimary studies of delays in construction projects
by: Tan, Chin Keng, et al.
Published: (2020)
by: Tan, Chin Keng, et al.
Published: (2020)
The analysis of factors contributed to delay and method to analyze the delay in construction project
by: Mohammad Solhi, Mohammed
Published: (2010)
by: Mohammad Solhi, Mohammed
Published: (2010)
Communication tools and issues among the construction project team
by: Nadia Izaty, Baharuddin
Published: (2015)
by: Nadia Izaty, Baharuddin
Published: (2015)
The causes and effect of delay in construction industry project
by: Intan Diana, Musa
Published: (2012)
by: Intan Diana, Musa
Published: (2012)
Understanding the Causes of Design Errors in Construction Projects: A DEMATEL-Based Framework
by: Lee, Chia Kuang, et al.
Published: (2024)
by: Lee, Chia Kuang, et al.
Published: (2024)
A Preliminary Framework for Preventing Disputes in Different Stages of Building Construction Projects
by: Nur Nadhirah, Muhammuddin, et al.
Published: (2023)
by: Nur Nadhirah, Muhammuddin, et al.
Published: (2023)
Impact of the cost overrun factors on the project delays in construction industry
by: Noor Elinah, Sailin
Published: (2018)
by: Noor Elinah, Sailin
Published: (2018)
The Effects of Project Triple Constraint on Malaysia Building Projects
by: Hassan, Ahmed Khalif, et al.
Published: (2019)
by: Hassan, Ahmed Khalif, et al.
Published: (2019)
Architect’s perception of factors contributing to construction project delay In planning & design phase:
Case studies of private housing projects In Klang Valley, Malaysia / Ong Wee Yeak
by: Wee Yeak, Ong
Published: (2022)
by: Wee Yeak, Ong
Published: (2022)
A study of project delay in Sudan construction industry
by: Mohamed, Mohamed Babikir Ibrahiem
Published: (2015)
by: Mohamed, Mohamed Babikir Ibrahiem
Published: (2015)
A study to identify the factor that causes project delay in construction at Terengganu
by: Nurul Syakirah, Mohd Ali
Published: (2016)
by: Nurul Syakirah, Mohd Ali
Published: (2016)
Cost Overrun in Construction Projects in Malaysia: A Study on Contractor Related Factors
by: Norul Izzati, M. Ashaari, et al.
Published: (2019)
by: Norul Izzati, M. Ashaari, et al.
Published: (2019)
Impact of cost overrun factors on the project delay in construction industry, Pahang, Malaysia
by: Zhi Jia, Ling
Published: (2014)
by: Zhi Jia, Ling
Published: (2014)
Client-related factors affecting delays in Malaysian school construction projects
by: Najuwa, Mohd Nasir
Published: (2018)
by: Najuwa, Mohd Nasir
Published: (2018)
Simulation of industrialised building system formation for housing construction
by: Zainal Abidin@Md. Taib, Ahmad Razin
Published: (2007)
by: Zainal Abidin@Md. Taib, Ahmad Razin
Published: (2007)
An Environmental Impact Framework for Evaluating Construction Projects Delays
by: Ansah, Richard Hannis, et al.
Published: (2016)
by: Ansah, Richard Hannis, et al.
Published: (2016)
Prioritization of Factors Influencing Safety Performance on Construction Sites: A Study Based on Grade Seven (G7) Main Contractors' Perspectives
by: Lee, Chia Kuang, et al.
Published: (2013)
by: Lee, Chia Kuang, et al.
Published: (2013)
Enhancing cost estimation performance through effective organizational control: the moderating role of project complexity in construction projects
by: Mohammad Waffy, Fazil, et al.
Published: (2024)
by: Mohammad Waffy, Fazil, et al.
Published: (2024)
A review on the implementation of QLASSIC in construction projects
by: Syeh Ameer Ali, Syarifah Firdaus, et al.
Published: (2011)
by: Syeh Ameer Ali, Syarifah Firdaus, et al.
Published: (2011)
Lean construction : knowledge and barriers in implementing into Malaysia construction industry
by: Lim, Victor Aik Jin
Published: (2008)
by: Lim, Victor Aik Jin
Published: (2008)
Case study on delay factors in steel bridge construction
by: Hazim Adly Harun, Harun
Published: (2015)
by: Hazim Adly Harun, Harun
Published: (2015)
Risk assessment of SunCon: An empirical study of construction sector in Malaysia
by: Kah, Yan Siah, et al.
Published: (2023)
by: Kah, Yan Siah, et al.
Published: (2023)
Adoption of lean tools to control delays in Malaysian construction projects
by: Ansha, Richard Hannis
Published: (2016)
by: Ansha, Richard Hannis
Published: (2016)
Efficiency in construction process
by: Taib, Tahrina
Published: (2010)
by: Taib, Tahrina
Published: (2010)
Minimising construction disputes
by: Wahi, Noraziah
Published: (2008)
by: Wahi, Noraziah
Published: (2008)
The profile of construction disputes
by: Abidin, Asniah
Published: (2007)
by: Abidin, Asniah
Published: (2007)
Advancing Towards Delay-Free Construction Project: A
Review
by: Ansah, Richard Hannis, et al.
Published: (2016)
by: Ansah, Richard Hannis, et al.
Published: (2016)
Challenges of international development projects in Yemen: Perspective of public work project / Hassan Mohammed Mohammed Lashuel
by: Hassan Mohammed, Mohammed Lashuel
Published: (2020)
by: Hassan Mohammed, Mohammed Lashuel
Published: (2020)
Factor causing time delay in construction Malaysia
by: Nasser Rostam, Afshar, et al.
Published: (2016)
by: Nasser Rostam, Afshar, et al.
Published: (2016)
Project management during covid-19: the relevance of human skills and the infrastructure project performance in Klang Valley Malaysia
by: Priyadarsini, Palaniapan
Published: (2023)
by: Priyadarsini, Palaniapan
Published: (2023)
Predicament in construction – an overlook to delays, cost overruns and risks
by: Ahmad Aiman Ariff, Ahmad Zamri
Published: (2019)
by: Ahmad Aiman Ariff, Ahmad Zamri
Published: (2019)
Voidable and void construction contracts
by: Yow, Kah Lun
Published: (2006)
by: Yow, Kah Lun
Published: (2006)
Assessment of Influential Causes of Construction Project
Delay in Malaysian Private Housing from Developer’s
Viewpoint
by: Othuman Mydin, M.A., et al.
Published: (2014)
by: Othuman Mydin, M.A., et al.
Published: (2014)
Study of factors influencing construction delays at rural area in Malaysia
by: Ramli, M Z, et al.
Published: (2018)
by: Ramli, M Z, et al.
Published: (2018)
Similar Items
-
The causes and effect of delay to handover the project in construction industry
by: Nur Fatihah, Zakeri
Published: (2015) -
Dispute resolution in relation to delay of construction project
by: Soon, Tan Kian
Published: (2010) -
A study of delay sources of construction project in Kuantan area
by: Tan, Kean Wei
Published: (2015) -
Study on the factor that contribute to the financial problems of abandoned housing project in Malaysia
by: Nuramalina, Nuramalina
Published: (2017) -
The causes of delay in construction project in Kuantan
by: Nur Azuwa, Ghazali
Published: (2017)