Multi-Objective Discrete Particle Swarm Optimisation Algorithm for Integrated Assembly Sequence Planning and Assembly Line Balancing
In assembly optimisation, assembly sequence planning and assembly line balancing have been extensively studied because both activities are directly linked with assembly efficiency that influences the final assembly costs. Both activities are categorised as NP-hard and usually performed separately. A...
| Main Authors: | M. F. F., Ab Rashid, Hutabarat, Windo, Tiwari, Ashutosh |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Institution of Mechanical Engineers
2016
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/15059/ http://umpir.ump.edu.my/id/eprint/15059/1/IMechE%20Part%20B-%20Journal%20of%20Engineering%20Manufacture-2016-Ab%20Rashid-0954405416673095.pdf |
Similar Items
Integrated optimization of mixed-model assembly sequence planning and line balancing using multi-objective discrete particle swarm optimization
by: M. F. F., Ab Rashid, et al.
Published: (2019)
by: M. F. F., Ab Rashid, et al.
Published: (2019)
An Integrated Representation Scheme for Assembly Sequence Planning and Assembly Line Balancing
by: M. F. F., Ab Rashid, et al.
Published: (2011)
by: M. F. F., Ab Rashid, et al.
Published: (2011)
Development of a Tuneable Test Problem Generator for Assembly Sequence Planning and Assembly Line Balancing
by: M. F. F., Ab Rashid, et al.
Published: (2012)
by: M. F. F., Ab Rashid, et al.
Published: (2012)
Intergrated multi-objective optimisation of assembly sequence planning and assembly line balancing using particle swarm optimisation
by: M. F. F., Ab Rashid
Published: (2013)
by: M. F. F., Ab Rashid
Published: (2013)
Optimisation of two-sided assembly line balancing with resource constraints using modified particle swarm optimisation
by: Muhammad Razif, Abdullah Make, et al.
Published: (2020)
by: Muhammad Razif, Abdullah Make, et al.
Published: (2020)
A modified artificial bee colony algorithm to optimise integrated assembly sequence planning and assembly line balancing
by: M. F. F., Ab Rashid, et al.
Published: (2019)
by: M. F. F., Ab Rashid, et al.
Published: (2019)
Multi-objective multi-verse optimiser for integrated two-sided assembly sequence planning and line balancing
by: Mohd Fadzil Faisae, Ab Rashid, et al.
Published: (2022)
by: Mohd Fadzil Faisae, Ab Rashid, et al.
Published: (2022)
Optimization of two-sided assembly line balancing with resource constraints using modified particle swarm optimisation
by: Muhammad Razif, Abdullah Make, et al.
Published: (2022)
by: Muhammad Razif, Abdullah Make, et al.
Published: (2022)
An Assembly Sequence Planning Approach with a Multi-State Particle Swarm Optimization
by: Ismail, Ibrahim, et al.
Published: (2016)
by: Ismail, Ibrahim, et al.
Published: (2016)
Vector evaluated particle swarm optimization approach to solve assembly sequence planning problem
by: A. Mukred, Jameel A., et al.
Published: (2022)
by: A. Mukred, Jameel A., et al.
Published: (2022)
Multi-objective optimisation of assembly line balancing type-e problem with resource constraints
by: Masitah, Jusop
Published: (2016)
by: Masitah, Jusop
Published: (2016)
Comparison of Sequential and Integrated Optimisation Approaches for ASP and ALB
by: M. F. F., Ab Rashid, et al.
Published: (2017)
by: M. F. F., Ab Rashid, et al.
Published: (2017)
Assessment of integrated assembly sequence planning and line balancing optimization using metaheuristic algorithms
by: Mohd Fadzil Faisae, Ab Rashid, et al.
Published: (2024)
by: Mohd Fadzil Faisae, Ab Rashid, et al.
Published: (2024)
Modelling and optimisation of assembly line balancing problem with resource constraint
by: Nur Hairunnisa, Kamarudin
Published: (2019)
by: Nur Hairunnisa, Kamarudin
Published: (2019)
Optimisation of Assembly Line Balancing Type-E with Resource Constraints using NSGA-II
by: Masitah, Jusop, et al.
Published: (2016)
by: Masitah, Jusop, et al.
Published: (2016)
Optimisation of energy efficient Assembly Sequence Planning using Moth-Flame Optimisation alghorithm
by: Muhammad Arif, Abdullah
Published: (2019)
by: Muhammad Arif, Abdullah
Published: (2019)
A Review of Two-sided Assembly Line Balancing Problem
by: Abdullah Make, Muhammad Razif, et al.
Published: (2016)
by: Abdullah Make, Muhammad Razif, et al.
Published: (2016)
Assembly Line Balancing using Heuristic Approaches in Manufacturing Industry
by: Muhammad Razif, Abdullah Make, et al.
Published: (2017)
by: Muhammad Razif, Abdullah Make, et al.
Published: (2017)
An efficient assembly line balancing in automobile manufacturing
by: Razman, Mat Tahar, et al.
Published: (2011)
by: Razman, Mat Tahar, et al.
Published: (2011)
Modelling of assembly line balancing with energy consumption
by: Ariff Nijay, Ramli, et al.
Published: (2023)
by: Ariff Nijay, Ramli, et al.
Published: (2023)
A Review on Simple Assembly Line Balancing Type-e problem
by: M., Jusop, et al.
Published: (2015)
by: M., Jusop, et al.
Published: (2015)
A review of assembly line balancing optimisation with energy consideration using meta-heuristic algorithms
by: Mohd Fadzil Faisae, Ab Rashid, et al.
Published: (2021)
by: Mohd Fadzil Faisae, Ab Rashid, et al.
Published: (2021)
Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints
by: Muhammad Razif, Abdullah Make, et al.
Published: (2016)
by: Muhammad Razif, Abdullah Make, et al.
Published: (2016)
Optimization of mixed-model assembly line balancing problem with resource constraints
by: M. M., Razali, et al.
Published: (2017)
by: M. M., Razali, et al.
Published: (2017)
Gravitational Search Algorithm for Assembly Sequence Planning
by: Ismail, Ibrahim, et al.
Published: (2014)
by: Ismail, Ibrahim, et al.
Published: (2014)
A note on “A multi-objective genetic algorithm for solving assembly line balancing problem”
by: Fathi, Masood, et al.
Published: (2010)
by: Fathi, Masood, et al.
Published: (2010)
Simulation of Assembly Line Balancing in Automotive Component Manufacturing
by: Muthanna , Jamil, et al.
Published: (2016)
by: Muthanna , Jamil, et al.
Published: (2016)
Simulation Model and Genetic Algorithm to Assembly Line Balancing
by: Ali, A. J. Adham, et al.
Published: (2013)
by: Ali, A. J. Adham, et al.
Published: (2013)
NSGA-II Algorithm for Assembly Line Balancing with Multi-Resource Constraints
by: M. F. F., Ab Rashid, et al.
Published: (2016)
by: M. F. F., Ab Rashid, et al.
Published: (2016)
A new multiobjective tiki-taka algorithm for optimization of assembly line balancing
by: M. F. F., Ab Rashid, et al.
Published: (2023)
by: M. F. F., Ab Rashid, et al.
Published: (2023)
Assembly Line Balancing with Resource Constraints using New
Rank-Based Crossovers
by: Nur Hairunnisa, Kamarudin, et al.
Published: (2017)
by: Nur Hairunnisa, Kamarudin, et al.
Published: (2017)
Advances in Particle Swarm Algorithms in Asynchronous, Discrete and Multi-Objective Optimization
by: Zuwairie, Ibrahim
Published: (2014)
by: Zuwairie, Ibrahim
Published: (2014)
Mathematical Modelling of Mixed-Model Assembly Line Balancing Problem with Resources Constraints
by: Muhamad Magffierah, Razali, et al.
Published: (2016)
by: Muhamad Magffierah, Razali, et al.
Published: (2016)
A Hybrid Ant-Wolf Algorithm to Optimize Assembly Sequence Planning Problem
by: M. F. F., Ab Rashid
Published: (2017)
by: M. F. F., Ab Rashid
Published: (2017)
Modelling of Assembly Sequence Planning Problem using Base Part Concept
by: Muhamad Arif, Abdullah, et al.
Published: (2018)
by: Muhamad Arif, Abdullah, et al.
Published: (2018)
Development of a discrete event simulation tool for assembly line simulation
by: Mohd Fadzil Faisae, Ab Rashid, et al.
Published: (2023)
by: Mohd Fadzil Faisae, Ab Rashid, et al.
Published: (2023)
Optimization of Assembly Sequence Planning Using Soft Computing Approaches: A Review
by: Muhammad Arif, Abdullah, et al.
Published: (2019)
by: Muhammad Arif, Abdullah, et al.
Published: (2019)
Modelling and optimization of assembly line balancing with multi-resource constraints
by: Ab Rashid, Mohd Fadzil Faisae, et al.
Published: (2017)
by: Ab Rashid, Mohd Fadzil Faisae, et al.
Published: (2017)
Modelling and optimization of assembly line balancing with multi-resource constraints
by: Ab Rashid, Mohd Fadzil Faisae
Published: (2013)
by: Ab Rashid, Mohd Fadzil Faisae
Published: (2013)
Optimization of two sided assembly line balancing with resource constraint
by: Muhammad Razif, Abdullah Make
Published: (2022)
by: Muhammad Razif, Abdullah Make
Published: (2022)
Similar Items
-
Integrated optimization of mixed-model assembly sequence planning and line balancing using multi-objective discrete particle swarm optimization
by: M. F. F., Ab Rashid, et al.
Published: (2019) -
An Integrated Representation Scheme for Assembly Sequence Planning and Assembly Line Balancing
by: M. F. F., Ab Rashid, et al.
Published: (2011) -
Development of a Tuneable Test Problem Generator for Assembly Sequence Planning and Assembly Line Balancing
by: M. F. F., Ab Rashid, et al.
Published: (2012) -
Intergrated multi-objective optimisation of assembly sequence planning and assembly line balancing using particle swarm optimisation
by: M. F. F., Ab Rashid
Published: (2013) -
Optimisation of two-sided assembly line balancing with resource constraints using modified particle swarm optimisation
by: Muhammad Razif, Abdullah Make, et al.
Published: (2020)