A Framework for Measuring The Effect of Changeover Time To Overall Equipment Effectiveness
Single Minutes of Exchange Die (SMED), developed by Shigeo Shingo is an approach to improve changeover of die by reduction its setup time. Longer setup time will lead to shorter Availability in Overall Equipment Effectiveness (OEE), thus will give effect to the actual time of production. For this re...
| Main Authors: | Muhamad Arifpin, Mansor, A. R., Ismail, Mohamad R., M. Yasin, A., Halim |
|---|---|
| Format: | Conference or Workshop Item |
| Language: | English |
| Published: |
Universiti Malaysia Pahang
2015
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/14477/ http://umpir.ump.edu.my/id/eprint/14477/6/ftech-2015-arifpin-Framework%20for%20Measuring%20The%20Effect.pdf |
Similar Items
Integration Of Overall Equipment Effectiveness
(Oee) And Reliability For Measuring Machine
Effectiveness
by: Samat, Hasnida Ab
Published: (2010)
by: Samat, Hasnida Ab
Published: (2010)
Improvement of availability rate of overall equipment effectiveness (OEE) for CNC winding machine
by: Aina Nadia Aida, Mohd Latif
Published: (2015)
by: Aina Nadia Aida, Mohd Latif
Published: (2015)
Improving production system performance using overall equipment effectiveness
by: Lance, Clarence, et al.
Published: (2020)
by: Lance, Clarence, et al.
Published: (2020)
Improvement of Overall Equipment Effectiveness (OEE) through Implementation of Autonomous Maintenance in Crankcase Line
by: A. R., Razali, et al.
Published: (2015)
by: A. R., Razali, et al.
Published: (2015)
Improvement of Overall Equipment Effectiveness (OEE) through Implementation of Total Productive Maintenance (TPM) in Manufacturing Industries
by: A. R., Razali, et al.
Published: (2015)
by: A. R., Razali, et al.
Published: (2015)
A Study On Overall Equipment Effectiveness (OEE) For Performance Measurement Case Study For Surface Mount Technology (SMT) Department
by: Shamsudin, Siti Nor Atiqah
Published: (2018)
by: Shamsudin, Siti Nor Atiqah
Published: (2018)
Developmeny Of A Visual Display As A Monitoring System To Calculate Overall Equipment Effectiveness (OEE)
by: Lee, Yee Von
Published: (2017)
by: Lee, Yee Von
Published: (2017)
Overall equipment effectiveness improvement through total productive maintenance in assembly cell
by: Ismail, Napsiah, et al.
Published: (2013)
by: Ismail, Napsiah, et al.
Published: (2013)
Implementation of quick changeover on changing new model for CNC machine
by: Nor Amirah, Mohamad Radzuan
Published: (2018)
by: Nor Amirah, Mohamad Radzuan
Published: (2018)
A knowledge based decision support system for tool changeover in CNCs
by: Nawaz, A., et al.
Published: (2011)
by: Nawaz, A., et al.
Published: (2011)
Analysis and countermeasure to improve overall equipment effectiveness (OEE) on chassis line at Tan Chong Industry
by: Nur Syahirah, Ismail
Published: (2016)
by: Nur Syahirah, Ismail
Published: (2016)
What drives the 'August effect'?: an observational study of the effect of junior doctor changeover on out of hours work
by: Blakey, John, et al.
Published: (2013)
by: Blakey, John, et al.
Published: (2013)
Analysis and countermeasure to improve machine efficiency by using overall equipment effectiveness (OEE) method
by: Law, Jessica Ka Ing
Published: (2015)
by: Law, Jessica Ka Ing
Published: (2015)
Particular model for improving failure mode and effect analysis (FMEA) by using of overall equipment efficiency (OEE)
by: Esmaeilian, Gholamreza, et al.
Published: (2008)
by: Esmaeilian, Gholamreza, et al.
Published: (2008)
Analysis of the Overall Equipment Effectiveness Losses and the Application of Continuous Improvement Techniques to Increase Productivity in Ecolab Leeds
by: Gonzalez Puente, Marisela
Published: (2014)
by: Gonzalez Puente, Marisela
Published: (2014)
Overall equipment effectiveness analysis of power magnetic inductor production line at BI technologies sdn. bhd.
by: Nur Syuhadah, Abdul Wahab
Published: (2017)
by: Nur Syuhadah, Abdul Wahab
Published: (2017)
Analysis and countermeasure to improve production system performance by using overall equipment effectiveness at bi technologies sdn. Bhd.
by: Beh, Alicia
Published: (2013)
by: Beh, Alicia
Published: (2013)
Overall Equipment Effectiveness (OEE) Through Total Productive Maintenance (TPM) Practices - A Study Across The Malaysia Industries
by: Kaliannan, Batumalay
Published: (2010)
by: Kaliannan, Batumalay
Published: (2010)
The validation of productivity on the changeover activity at the automotive stamping press line by comparing the embedded SMED frame-work versus SMED approach: A witness simulation case study
by: Azizul Qayyum, Basri, et al.
Published: (2019)
by: Azizul Qayyum, Basri, et al.
Published: (2019)
Characterization Of The Time-Averaged Overall Heat Transfer In A Direct-Injection Hydrogen-Fueled Engine
by: M. M., Rahman, et al.
Published: (2012)
by: M. M., Rahman, et al.
Published: (2012)
Implementation of Single Minutes of Exchange Die (SMED) in Malaysia Metal Stamping Industry: A Case Study
by: Muhamad Arifpin, Mansor, et al.
Published: (2015)
by: Muhamad Arifpin, Mansor, et al.
Published: (2015)
Real-Time Detection of Personal Protective Equipment for Site Safety Using Deep Learning Techniques
by: Muhammad Hadif, Dzulkhissham
Published: (2022)
by: Muhammad Hadif, Dzulkhissham
Published: (2022)
Overall performance measurement for logistics operations
by: Jamaludin, Khairur Rijal, et al.
Published: (2006)
by: Jamaludin, Khairur Rijal, et al.
Published: (2006)
Development and validation of an equipment cost efficiency framework (ECEF) for improving operational and financial performance of production resources
by: Liew, Chen Fung
Published: (2024)
by: Liew, Chen Fung
Published: (2024)
A guideline framework for recognition, measurement and reporting of Malaysian government's property, plant and equipment under accrual accounting
by: Ismail, Suhaiza, et al.
Published: (2012)
by: Ismail, Suhaiza, et al.
Published: (2012)
Intensified equipment for producing high purity mtbe
by: Mohamad Rizza, Othman, et al.
Published: (2021)
by: Mohamad Rizza, Othman, et al.
Published: (2021)
Total Productive Maintenance (TPM) approach to improve Overall Equipment Efficiency (OEE) in Robert Bosch Automotive Steering Sdn. Bhd
by: Mohamad Hafiz Mohd Rosli,
Published: (2020)
by: Mohamad Hafiz Mohd Rosli,
Published: (2020)
Evaluation Improvement of Production Productivity Performance using Statistical Process Control, Overall Equipment Efficiency, and Autonomous Maintenance
by: Amir, Azizi
Published: (2015)
by: Amir, Azizi
Published: (2015)
Development of automatic number plate recognition software and journey time measurement /Amri Mohd Yasin
by: Amri, Mohd Yasin
Published: (2012)
by: Amri, Mohd Yasin
Published: (2012)
Effect of high temperature solution heat treatment time on quality index and morphology of A356 DC alloy
by: Mohamad Rusydi, Mohamad Yasin, et al.
Published: (2021)
by: Mohamad Rusydi, Mohamad Yasin, et al.
Published: (2021)
Implementation of real time measurement system for precise
surveying applications
by: Setan, Halim, et al.
Published: (2005)
by: Setan, Halim, et al.
Published: (2005)
Malaysia overall politics
by: Syed Abdullah Idid, Syed Arabi
Published: (2016)
by: Syed Abdullah Idid, Syed Arabi
Published: (2016)
Investigating efficiency of materials management at original equipment manufacturer (OEM)
by: Hassan Murshid, Zsa Zsa Nura’in, et al.
Published: (2022)
by: Hassan Murshid, Zsa Zsa Nura’in, et al.
Published: (2022)
Discrete event simulation as a decision making tool for improving overall line efficiency
by: Yong, Wen Yao
Published: (2022)
by: Yong, Wen Yao
Published: (2022)
Development of a Newly Designed Combined Grinding Equipment
by: Gan, Hui Leng, et al.
Published: (2014)
by: Gan, Hui Leng, et al.
Published: (2014)
Dispersion measure variations and their effect on precision pulsar timing
by: You, X., et al.
Published: (2007)
by: You, X., et al.
Published: (2007)
Effect of food experience on overall satisfaction: comparison between first-time and repeat visitors to Malaysia
by: Roozbeh, B. H., et al.
Published: (2013)
by: Roozbeh, B. H., et al.
Published: (2013)
Optimizing Ram Testing Method For Test Time Saving Using Automatic Test Equipment
by: Kesavan Prabagaran, Premkumar
Published: (2017)
by: Kesavan Prabagaran, Premkumar
Published: (2017)
Quality air monitoring equipment: The review of air quality monitoring equipment
by: Putri Shazlia, Rosman, et al.
Published: (2020)
by: Putri Shazlia, Rosman, et al.
Published: (2020)
Effect of Tube Spacing, Fin Density and Reynolds Number on Overall Heat Transfer Rate for In-line Configuration
by: Tahseen, Tahseen Ahmad, et al.
Published: (2015)
by: Tahseen, Tahseen Ahmad, et al.
Published: (2015)
Similar Items
-
Integration Of Overall Equipment Effectiveness
(Oee) And Reliability For Measuring Machine
Effectiveness
by: Samat, Hasnida Ab
Published: (2010) -
Improvement of availability rate of overall equipment effectiveness (OEE) for CNC winding machine
by: Aina Nadia Aida, Mohd Latif
Published: (2015) -
Improving production system performance using overall equipment effectiveness
by: Lance, Clarence, et al.
Published: (2020) -
Improvement of Overall Equipment Effectiveness (OEE) through Implementation of Autonomous Maintenance in Crankcase Line
by: A. R., Razali, et al.
Published: (2015) -
Improvement of Overall Equipment Effectiveness (OEE) through Implementation of Total Productive Maintenance (TPM) in Manufacturing Industries
by: A. R., Razali, et al.
Published: (2015)