A Framework for Measuring The Effect of Changeover Time To Overall Equipment Effectiveness

Single Minutes of Exchange Die (SMED), developed by Shigeo Shingo is an approach to improve changeover of die by reduction its setup time. Longer setup time will lead to shorter Availability in Overall Equipment Effectiveness (OEE), thus will give effect to the actual time of production. For this re...

Full description

Bibliographic Details
Main Authors: Muhamad Arifpin, Mansor, A. R., Ismail, Mohamad R., M. Yasin, A., Halim
Format: Conference or Workshop Item
Language:English
Published: Universiti Malaysia Pahang 2015
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/14477/
http://umpir.ump.edu.my/id/eprint/14477/6/ftech-2015-arifpin-Framework%20for%20Measuring%20The%20Effect.pdf
_version_ 1848819732919091200
author Muhamad Arifpin, Mansor
A. R., Ismail
Mohamad R., M. Yasin
A., Halim
author_facet Muhamad Arifpin, Mansor
A. R., Ismail
Mohamad R., M. Yasin
A., Halim
author_sort Muhamad Arifpin, Mansor
building UMP Institutional Repository
collection Online Access
description Single Minutes of Exchange Die (SMED), developed by Shigeo Shingo is an approach to improve changeover of die by reduction its setup time. Longer setup time will lead to shorter Availability in Overall Equipment Effectiveness (OEE), thus will give effect to the actual time of production. For this reason, a study need to be conducted to measure how the performance of setup or changeover process effect the Availability in OEE. This paper propose a framework on how to measure the effect of changeover time to OEE by using Data Envelopment Analysis (DEA). The study benchmark Single Minutes of Exchange Die process in the same production line dynamically. The manpower and the external setup time are the main inputs in this measuring process where the main output is the Availability of OEE. This framework can be used to determine the efficiency of converting internal setup time to external setup time. An efficient converting process from internal setup time to external setup time will give a good effect to the Availability and thus contribute to the longer production time.
first_indexed 2025-11-15T01:58:14Z
format Conference or Workshop Item
id ump-14477
institution Universiti Malaysia Pahang
institution_category Local University
language English
last_indexed 2025-11-15T01:58:14Z
publishDate 2015
publisher Universiti Malaysia Pahang
recordtype eprints
repository_type Digital Repository
spelling ump-144772018-10-17T02:56:24Z http://umpir.ump.edu.my/id/eprint/14477/ A Framework for Measuring The Effect of Changeover Time To Overall Equipment Effectiveness Muhamad Arifpin, Mansor A. R., Ismail Mohamad R., M. Yasin A., Halim TA Engineering (General). Civil engineering (General) Single Minutes of Exchange Die (SMED), developed by Shigeo Shingo is an approach to improve changeover of die by reduction its setup time. Longer setup time will lead to shorter Availability in Overall Equipment Effectiveness (OEE), thus will give effect to the actual time of production. For this reason, a study need to be conducted to measure how the performance of setup or changeover process effect the Availability in OEE. This paper propose a framework on how to measure the effect of changeover time to OEE by using Data Envelopment Analysis (DEA). The study benchmark Single Minutes of Exchange Die process in the same production line dynamically. The manpower and the external setup time are the main inputs in this measuring process where the main output is the Availability of OEE. This framework can be used to determine the efficiency of converting internal setup time to external setup time. An efficient converting process from internal setup time to external setup time will give a good effect to the Availability and thus contribute to the longer production time. Universiti Malaysia Pahang 2015 Conference or Workshop Item PeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/14477/6/ftech-2015-arifpin-Framework%20for%20Measuring%20The%20Effect.pdf Muhamad Arifpin, Mansor and A. R., Ismail and Mohamad R., M. Yasin and A., Halim (2015) A Framework for Measuring The Effect of Changeover Time To Overall Equipment Effectiveness. In: The 4th International Congress on Natural Sciences and Engineering , 7-9 May 2015 , Kyoto, Japan. pp. 1-9.. (Unpublished) (Unpublished)
spellingShingle TA Engineering (General). Civil engineering (General)
Muhamad Arifpin, Mansor
A. R., Ismail
Mohamad R., M. Yasin
A., Halim
A Framework for Measuring The Effect of Changeover Time To Overall Equipment Effectiveness
title A Framework for Measuring The Effect of Changeover Time To Overall Equipment Effectiveness
title_full A Framework for Measuring The Effect of Changeover Time To Overall Equipment Effectiveness
title_fullStr A Framework for Measuring The Effect of Changeover Time To Overall Equipment Effectiveness
title_full_unstemmed A Framework for Measuring The Effect of Changeover Time To Overall Equipment Effectiveness
title_short A Framework for Measuring The Effect of Changeover Time To Overall Equipment Effectiveness
title_sort framework for measuring the effect of changeover time to overall equipment effectiveness
topic TA Engineering (General). Civil engineering (General)
url http://umpir.ump.edu.my/id/eprint/14477/
http://umpir.ump.edu.my/id/eprint/14477/6/ftech-2015-arifpin-Framework%20for%20Measuring%20The%20Effect.pdf