Can Malaysia Meet Its Renewable Power Plant Expansion Target by 2015? Evidence from System Dynamics Model

Malaysia having more than 65% of electricity generation from fossil fuels has been trying to incorporate renewable resources in the fuel mix. System Dynamics modelling and simulation approach is used to model capacity expansion target by 2015. The system dynamics model consists of construction, ince...

Full description

Bibliographic Details
Main Authors: Salman, Ahmad, Razman, Mat Tahar
Format: Article
Language:English
English
Published: Universiti Malaysia Pahang 2013
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/14099/
http://umpir.ump.edu.my/id/eprint/14099/1/ftech-2013-salman-Can%20Malaysia%20Meet%20Its%20Renewable%20Power%20Plant.pdf
http://umpir.ump.edu.my/id/eprint/14099/7/ftech-2013-salman-Can%20Malaysia%20Meet%20Its%20Renewable%20Power%20Plant1.pdf
_version_ 1848819638739140608
author Salman, Ahmad
Razman, Mat Tahar
author_facet Salman, Ahmad
Razman, Mat Tahar
author_sort Salman, Ahmad
building UMP Institutional Repository
collection Online Access
description Malaysia having more than 65% of electricity generation from fossil fuels has been trying to incorporate renewable resources in the fuel mix. System Dynamics modelling and simulation approach is used to model capacity expansion target by 2015. The system dynamics model consists of construction, incentives and investors ' behavioral feedback, in making an investment decision. Analysis under optimistic settings reveals that investments fail to achieve the target of 985Megawatts of renewable capacity.
first_indexed 2025-11-15T01:56:45Z
format Article
id ump-14099
institution Universiti Malaysia Pahang
institution_category Local University
language English
English
last_indexed 2025-11-15T01:56:45Z
publishDate 2013
publisher Universiti Malaysia Pahang
recordtype eprints
repository_type Digital Repository
spelling ump-140992016-08-22T03:53:17Z http://umpir.ump.edu.my/id/eprint/14099/ Can Malaysia Meet Its Renewable Power Plant Expansion Target by 2015? Evidence from System Dynamics Model Salman, Ahmad Razman, Mat Tahar T Technology (General) TJ Mechanical engineering and machinery Malaysia having more than 65% of electricity generation from fossil fuels has been trying to incorporate renewable resources in the fuel mix. System Dynamics modelling and simulation approach is used to model capacity expansion target by 2015. The system dynamics model consists of construction, incentives and investors ' behavioral feedback, in making an investment decision. Analysis under optimistic settings reveals that investments fail to achieve the target of 985Megawatts of renewable capacity. Universiti Malaysia Pahang 2013 Article PeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/14099/1/ftech-2013-salman-Can%20Malaysia%20Meet%20Its%20Renewable%20Power%20Plant.pdf application/pdf en http://umpir.ump.edu.my/id/eprint/14099/7/ftech-2013-salman-Can%20Malaysia%20Meet%20Its%20Renewable%20Power%20Plant1.pdf Salman, Ahmad and Razman, Mat Tahar (2013) Can Malaysia Meet Its Renewable Power Plant Expansion Target by 2015? Evidence from System Dynamics Model. International Journal of Technology Management, 2. pp. 37-40. ISSN 2289-2753. (Published) http://www.ump.edu.my/
spellingShingle T Technology (General)
TJ Mechanical engineering and machinery
Salman, Ahmad
Razman, Mat Tahar
Can Malaysia Meet Its Renewable Power Plant Expansion Target by 2015? Evidence from System Dynamics Model
title Can Malaysia Meet Its Renewable Power Plant Expansion Target by 2015? Evidence from System Dynamics Model
title_full Can Malaysia Meet Its Renewable Power Plant Expansion Target by 2015? Evidence from System Dynamics Model
title_fullStr Can Malaysia Meet Its Renewable Power Plant Expansion Target by 2015? Evidence from System Dynamics Model
title_full_unstemmed Can Malaysia Meet Its Renewable Power Plant Expansion Target by 2015? Evidence from System Dynamics Model
title_short Can Malaysia Meet Its Renewable Power Plant Expansion Target by 2015? Evidence from System Dynamics Model
title_sort can malaysia meet its renewable power plant expansion target by 2015? evidence from system dynamics model
topic T Technology (General)
TJ Mechanical engineering and machinery
url http://umpir.ump.edu.my/id/eprint/14099/
http://umpir.ump.edu.my/id/eprint/14099/
http://umpir.ump.edu.my/id/eprint/14099/1/ftech-2013-salman-Can%20Malaysia%20Meet%20Its%20Renewable%20Power%20Plant.pdf
http://umpir.ump.edu.my/id/eprint/14099/7/ftech-2013-salman-Can%20Malaysia%20Meet%20Its%20Renewable%20Power%20Plant1.pdf