Reliability Of Risk Assessment In Petrochemical Industries
Quantitative Risk Assessment is one of the approaches to assess risks. A fuzzy set is a new mathematical tool to model inaccuracy and uncertainty. In this research paper, an integrate model has proposed to solve problem of uncertainty of initiative events and their consequences. Hazard and operabili...
| Main Authors: | Rachid, Ouache, Ali, A. J. Adham |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Penerbit Universiti Malaysia Pahang
2015
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/13852/ http://umpir.ump.edu.my/id/eprint/13852/1/Reliability%20Of%20Risk%20Assessment%20In%20Petrochemical%20Industries.pdf |
Similar Items
Modification of Risk Assessment Value to Test Industry Reliability
by: Sorooshian, Shahryar
Published: (2015)
by: Sorooshian, Shahryar
Published: (2015)
Reliability Quantitative Risk Assessment in Engineering System using Fuzzy Bow-Tie
by: Ouache, Rachid, et al.
Published: (2014)
by: Ouache, Rachid, et al.
Published: (2014)
Reliability Quantitative Risk Assessment in Engineering System using Fuzzy Event Tree Analysis
by: Ouache, Rachid, et al.
Published: (2014)
by: Ouache, Rachid, et al.
Published: (2014)
Safety Instrumented Systems between Reliability and Fuzzy
by: Rachid, Ouache, et al.
Published: (2014)
by: Rachid, Ouache, et al.
Published: (2014)
Optimum Efficiency of the Production Line at the Automotive Industry
by: Ali, A. J. Adham, et al.
Published: (2012)
by: Ali, A. J. Adham, et al.
Published: (2012)
Reliability Analysis of Covid-19 Risk Management System in Malaysia Higher Learning Institution
by: Khairil Anuar, Abdul Hamid, et al.
Published: (2022)
by: Khairil Anuar, Abdul Hamid, et al.
Published: (2022)
Interpersonal conflicts and its management in information system development at Kerteh Integrated Petrochemical Complex (KIPC) Kerteh, Terengganu
by: Huzir Sulaiman,
Published: (2006)
by: Huzir Sulaiman,
Published: (2006)
A Reliability Model for Safety Instrumented System
by: Ouache, Rachid, et al.
Published: (2015)
by: Ouache, Rachid, et al.
Published: (2015)
Development of mathematical models for quantitative risk and safety assessment in oil and gas refineries
by: Rachid, Ouache
Published: (2016)
by: Rachid, Ouache
Published: (2016)
Hybrid Model for Production Plan
by: Ali, A. J. Adham
Published: (2014)
by: Ali, A. J. Adham
Published: (2014)
Implementation and Analysis of Chemical Hazard Risk Assessment (CHRA) at a Petrochemicals Company, Malaysia
by: Suziyana, Mat Dahan, et al.
Published: (2012)
by: Suziyana, Mat Dahan, et al.
Published: (2012)
Planning to Design a Railway Network System: Using a Simulation Model
by: Ali, A. J. Adham, et al.
Published: (2015)
by: Ali, A. J. Adham, et al.
Published: (2015)
A Novel Method to Develop an Automobile Assembly Line System
by: Ali, A. J. Adham, et al.
Published: (2014)
by: Ali, A. J. Adham, et al.
Published: (2014)
A study of assessor training strategies and its effect on accuracy, discriminant validity and interrater reliability in UMP
by: Nur Ashida Ayu, Abdul Rani
Published: (2015)
by: Nur Ashida Ayu, Abdul Rani
Published: (2015)
Ergonomic Risk Assessment of Warehouse Workers in the Courier Service Industry A Case Study from Kuantan, Malaysia
by: Alya Nadhirah, Ismail, et al.
Published: (2024)
by: Alya Nadhirah, Ismail, et al.
Published: (2024)
Assessment of Work Life Balance (WLB) Among Employees in Banking Industry in Malaysia
by: Hartanto, Herlina
Published: (2012)
by: Hartanto, Herlina
Published: (2012)
Life cycle assessment of an industrial-scale petrochemical wastewater treatment plant
by: Muhaba, Sitra, et al.
Published: (2024)
by: Muhaba, Sitra, et al.
Published: (2024)
An Integrated Model to Enhance the Transportation Methods in Malaysia: Review Paper
by: Ali, A. J. Adham, et al.
Published: (2014)
by: Ali, A. J. Adham, et al.
Published: (2014)
Incubators And Government Policy For
Developing It Industry And Region In Emerging
Economies
by: Said, Mohd Fuaad, et al.
Published: (2012)
by: Said, Mohd Fuaad, et al.
Published: (2012)
Project risk management in Malaysian oil and gas industry: Implementation by EPC local Contractor / Zaim Aiman Che Rosli
by: Zaim Aiman, Che Rosli
Published: (2020)
by: Zaim Aiman, Che Rosli
Published: (2020)
The influence of organizational culture on construction risk management among Kuantan Malaysian Construction Industry: A partial least square structural equation modeling approach
by: Ismayana, M.P., et al.
Published: (2020)
by: Ismayana, M.P., et al.
Published: (2020)
Determining the reliability level by combining FMEA, FTA and dematel tools
by: Bujna, Marián, et al.
Published: (2024)
by: Bujna, Marián, et al.
Published: (2024)
Malaysia's Industrialization: The Quest for Technology
by: Anuwar Ali,
Published: (1993)
by: Anuwar Ali,
Published: (1993)
Microekonomi dalam industri seni
by: Mazdan, Ali Amaran
Published: (2016)
by: Mazdan, Ali Amaran
Published: (2016)
Assessing Management Involvement In Safety
Issues: The Case Of The Metal Products
Industry In Iran
by: Ooshaksaraie, Maryam, et al.
Published: (2013)
by: Ooshaksaraie, Maryam, et al.
Published: (2013)
Japanese industrial investments and technology transfer in Malaysia
by: Anuwar Ali,
Published: (1994)
by: Anuwar Ali,
Published: (1994)
An efficient assembly line balancing in automobile manufacturing
by: Razman, Mat Tahar, et al.
Published: (2011)
by: Razman, Mat Tahar, et al.
Published: (2011)
Incubators Within University And Clustered
Contexts: Cases Of National Chiao Tung University
(Nctu) And National Tsing Hua University (Nthu)
Incubators In Hsinchu, Taiwan
by: Adham, Khairul Akmaliah
Published: (2008)
by: Adham, Khairul Akmaliah
Published: (2008)
The Influence of Organizational External Factors on Construction Risk Management among Nigerian Construction Companies
by: Adeleke, A. Q., et al.
Published: (2018)
by: Adeleke, A. Q., et al.
Published: (2018)
An assessment of new technical of courses required by industries in Johor
by: Md. Rasli, Amran
Published: (1992)
by: Md. Rasli, Amran
Published: (1992)
Direct foreign investment in the Malaysian industrial sector
by: Anuwar Ali,, et al.
Published: (1993)
by: Anuwar Ali,, et al.
Published: (1993)
Entrepreneurial Competencies and Networks in the Construction Industry
by: Puteri Fadzline, Muhamad Tamyez, et al.
Published: (2016)
by: Puteri Fadzline, Muhamad Tamyez, et al.
Published: (2016)
Types of assessment
by: Ismail, Yusof
Published: (2011)
by: Ismail, Yusof
Published: (2011)
Improving Productivity by Simulate Facility Layout: A Case Study in a Car Component Manufacturer
by: Ahmad Nazif, Noor Kamar, et al.
Published: (2016)
by: Ahmad Nazif, Noor Kamar, et al.
Published: (2016)
Merits of Industrial Clustering: Case of Date’s Industry of Iran
by: Jamalizadeh, Azam, et al.
Published: (2017)
by: Jamalizadeh, Azam, et al.
Published: (2017)
Constructions Project Management Risks’ Framework
by: Ansah, Richard Hannis, et al.
Published: (2017)
by: Ansah, Richard Hannis, et al.
Published: (2017)
An Examination Of The Potential Impact
Of Risk On Viability Assessments For
Financially Distressed Firms: The Case
Of Professional User Groups Of
Company Accounts
by: Constantinides, Sylvia
Published: (2007)
by: Constantinides, Sylvia
Published: (2007)
A survey on electronic dialogue, risk assessment, customer access, and customers relationship lifetime
by: Lestari, Puji Tri, et al.
Published: (2022)
by: Lestari, Puji Tri, et al.
Published: (2022)
Toward sustainability and resilience with industry 4.0 and industry 5.0
by: Moshood, Taofeeq D., et al.
Published: (2024)
by: Moshood, Taofeeq D., et al.
Published: (2024)
Evaluating effective spare-parts inventory management for equipment reliability in manufacturing industries
by: Baluch, Nazim Hussain, et al.
Published: (2013)
by: Baluch, Nazim Hussain, et al.
Published: (2013)
Similar Items
-
Modification of Risk Assessment Value to Test Industry Reliability
by: Sorooshian, Shahryar
Published: (2015) -
Reliability Quantitative Risk Assessment in Engineering System using Fuzzy Bow-Tie
by: Ouache, Rachid, et al.
Published: (2014) -
Reliability Quantitative Risk Assessment in Engineering System using Fuzzy Event Tree Analysis
by: Ouache, Rachid, et al.
Published: (2014) -
Safety Instrumented Systems between Reliability and Fuzzy
by: Rachid, Ouache, et al.
Published: (2014) -
Optimum Efficiency of the Production Line at the Automotive Industry
by: Ali, A. J. Adham, et al.
Published: (2012)