Case study on supply and demand for parking facilities at LYC Hypermarket (road Gambang-Kuantan)
The parking facilities is an important element in providing good transportation planning policy at a certain area. The increase of demand for parking space especially at shopping area requires ample, comfortable and safe parking space which taken into consideration the potential space and the use of...
| Main Author: | Nurshahira Saidatul Hasna , Abdul Jabar |
|---|---|
| Format: | Undergraduates Project Papers |
| Language: | English |
| Published: |
2015
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/12351/ http://umpir.ump.edu.my/id/eprint/12351/1/FKASA%20-%20NURSHAHIRA%20SAIDATUL%20HASNA%20BT%20ABDUL%20JABAR.PDF |
Similar Items
Study of assesment of supply and demand of parking at Giant Hypermarket, Kuantan
by: Siti Zulaiha, Zainol
Published: (2015)
by: Siti Zulaiha, Zainol
Published: (2015)
Parking characteristics of multi-level parking facilities at berjaya Megamall, Kuantan
by: Nur Syazana, Khazili
Published: (2016)
by: Nur Syazana, Khazili
Published: (2016)
Determination of total polycyclic aromatic hydrocarbon (PAHs) in road dust along Kuantan-Gambang road
by: Nur Arifah , Jaafar
Published: (2012)
by: Nur Arifah , Jaafar
Published: (2012)
Study on current practice of construction waste management system in Gambang, Kuantan, Pahang
by: Nur Fatin Aqilah, Mat Zin
Published: (2016)
by: Nur Fatin Aqilah, Mat Zin
Published: (2016)
Study on water demand and capacity at UMP Gambang campus
by: Nur Faezah, Harith
Published: (2012)
by: Nur Faezah, Harith
Published: (2012)
Sustainability study of u-turn at km16 – km 18, Jalan Kuantan - Gambang
by: Nor Azliayana, Ahmad Nordin
Published: (2017)
by: Nor Azliayana, Ahmad Nordin
Published: (2017)
Relationship between roadside features and road traffic accidents along KM 3 - KM 27 of Jalan Kuantan-Gambang
by: Marzida, Abdul Manaf
Published: (2010)
by: Marzida, Abdul Manaf
Published: (2010)
Determination of selected heavy metal in road dust along Gambang-Kuatan road
by: Abu Bakar, Zulkiflli
Published: (2012)
by: Abu Bakar, Zulkiflli
Published: (2012)
Efficiency of slow sand filter in purifying of tube well water in Kg. Fajar, Gambang, Kuantan
by: Nurul Masliana, Khairil Anuar
Published: (2015)
by: Nurul Masliana, Khairil Anuar
Published: (2015)
Study on current practice of solid waste management system in Gambang residential area Kuantan, Pahang
by: Nor Zariefa, Zahari
Published: (2016)
by: Nor Zariefa, Zahari
Published: (2016)
Parking demand of park and ride facility at public transportation terminal
by: Syed Adnan, Sharifah Adibah Alyia, et al.
Published: (2017)
by: Syed Adnan, Sharifah Adibah Alyia, et al.
Published: (2017)
A literature review on the parking demand of park and ride facilities
by: Syed Adnan, Sharifah Adibah Alyia, et al.
Published: (2012)
by: Syed Adnan, Sharifah Adibah Alyia, et al.
Published: (2012)
Performance monitoring of Kuantan-Gambang (FR 2) and Gambang toll plaza (FR 222)-Muadzam (FR 12) cross junction using Malaysian intelligent traffic system (MITS)
by: Wong Choon Kit, Kevin
Published: (2019)
by: Wong Choon Kit, Kevin
Published: (2019)
Parking study at Klinik Kesihatan Bandar Kuantan
by: Norhamiza, Rossli
Published: (2015)
by: Norhamiza, Rossli
Published: (2015)
Evaluating the parking demand at park and ride facility at Putrajaya public transportation terminal
by: Syed Adnan, Sharifah Adibah Alyia, et al.
Published: (2013)
by: Syed Adnan, Sharifah Adibah Alyia, et al.
Published: (2013)
Projection on pavement life time for FR 222 access road to Gambang toll
by: Amrina, Abu Bakar
Published: (2012)
by: Amrina, Abu Bakar
Published: (2012)
The maintenance management of marine port facilities : case study Kuantan marine port
by: Muhammad Zulhilmi, Nordin
Published: (2010)
by: Muhammad Zulhilmi, Nordin
Published: (2010)
Factors influencing the parking demand of the park and ride facility at Putrajaya public transportation terminal
by: Syed Adnan, Sharifah Adibah Alyia, et al.
Published: (2015)
by: Syed Adnan, Sharifah Adibah Alyia, et al.
Published: (2015)
Factors influencing the parking demand of the park and ride facility at Putrajaya public transportation terminal
by: Syed Adnan, Sharifah Adibah Alyia, et al.
Published: (2015)
by: Syed Adnan, Sharifah Adibah Alyia, et al.
Published: (2015)
The study of potential evapotranspiration (PET) in UMP Gambang
by: Nor Afifah, Mohamad
Published: (2019)
by: Nor Afifah, Mohamad
Published: (2019)
Sustainable pedestrian routing within UMP Gambang
by: Nur Nadiah, Burhanuddin
Published: (2017)
by: Nur Nadiah, Burhanuddin
Published: (2017)
A theoretical review on the factors influencing the demand for park and ride facility
by: Syed Adnan, Sharifah Adibah Alyia, et al.
Published: (2012)
by: Syed Adnan, Sharifah Adibah Alyia, et al.
Published: (2012)
Hydrology study and trend of rainfall event at UMP Gambang
by: Muhammad Amirudin, Shikh Ali
Published: (2015)
by: Muhammad Amirudin, Shikh Ali
Published: (2015)
Sewerage inflow and infiltration in Universiti Malaysia Pahang (Gambang)
by: Liew, Pei Qi
Published: (2015)
by: Liew, Pei Qi
Published: (2015)
Application of GIS Analyzing Settlement Along Pekan-Kuantan Federal Road
by: Mohamad Idris, Ali, et al.
Published: (2011)
by: Mohamad Idris, Ali, et al.
Published: (2011)
Focus on Gambang
by: M. M., Yusoff, et al.
Published: (2008)
by: M. M., Yusoff, et al.
Published: (2008)
Effect of moisture content on collapsibility rate at Gambang residual soil
by: Mohd Haffizul Said, Mohd Ramdzan
Published: (2009)
by: Mohd Haffizul Said, Mohd Ramdzan
Published: (2009)
Safety measures at rural stop controlled intersection in UMP Gambang
by: Nurul Fajrina Hazirah, Azman
Published: (2017)
by: Nurul Fajrina Hazirah, Azman
Published: (2017)
The development of rainfall temporal pattern in Gambang
by: Nursyafiqah Amira, Ahmad Zaimi
Published: (2019)
by: Nursyafiqah Amira, Ahmad Zaimi
Published: (2019)
Pedestrian facilities for elderly people at UTC area, Kuantan
by: Siti Nor Suraya, Zulaini
Published: (2017)
by: Siti Nor Suraya, Zulaini
Published: (2017)
Site investigation on Sg. Belat bridge and road approaching KM1 federal road FR012 Jalan Gambang-Muadzam Shah, Pahang
by: Nur Wahidah, Kamaruddin
Published: (2012)
by: Nur Wahidah, Kamaruddin
Published: (2012)
Virtual Reality Hypermarket (VR Hypermarket) / Yin Pei Yee
by: Yin, Pei Yen
Published: (2006)
by: Yin, Pei Yen
Published: (2006)
Pedestrian behaviour at unsignalized zebra crossing : A case study in UMP Gambang campus
by: Azlina, Ismail, et al.
Published: (2023)
by: Azlina, Ismail, et al.
Published: (2023)
Identifications of problematic road side environment factors at signalized intersection in Kuantan town
by: Melissa, Goretti Michael
Published: (2016)
by: Melissa, Goretti Michael
Published: (2016)
The maintenance management of marine port facilities: case study Kuantan marine port
by: Muhammad Zulhilmi, Nordin
Published: (2010)
by: Muhammad Zulhilmi, Nordin
Published: (2010)
Risk and mitigation of vehicles parking for Gambang University Malaysia Pahang (UMP)
by: Zainurulaini, Zainal Abidin
Published: (2010)
by: Zainurulaini, Zainal Abidin
Published: (2010)
The Microbiological Quality of Harvested Rainwater System for Domestic Use in Gambang, Malaysia
by: Qasim, Ban, et al.
Published: (2017)
by: Qasim, Ban, et al.
Published: (2017)
Study of young motorcyclists’ risk behaviours towards road accidents in Kuantan
by: Siti Zun Nurain, M. A., et al.
Published: (2022)
by: Siti Zun Nurain, M. A., et al.
Published: (2022)
Improving pedestrian facilities in Kuantan central business district (CBD) area : pedestrian lighting
by: Nor Amira Aini, Ismau
Published: (2019)
by: Nor Amira Aini, Ismau
Published: (2019)
Review of speed limit for FR222 access road to Gambang toll
by: Hazlyza, Zainon
Published: (2012)
by: Hazlyza, Zainon
Published: (2012)
Similar Items
-
Study of assesment of supply and demand of parking at Giant Hypermarket, Kuantan
by: Siti Zulaiha, Zainol
Published: (2015) -
Parking characteristics of multi-level parking facilities at berjaya Megamall, Kuantan
by: Nur Syazana, Khazili
Published: (2016) -
Determination of total polycyclic aromatic hydrocarbon (PAHs) in road dust along Kuantan-Gambang road
by: Nur Arifah , Jaafar
Published: (2012) -
Study on current practice of construction waste management system in Gambang, Kuantan, Pahang
by: Nur Fatin Aqilah, Mat Zin
Published: (2016) -
Study on water demand and capacity at UMP Gambang campus
by: Nur Faezah, Harith
Published: (2012)