The contribution of earned value analysis for cost controlling of construction projects
Earned Value Analysis (EVA) is a project performance measurement technique. Managers can manage the performance of project by comparing the planned value to actual results. It allows the calculation of cost variance, performance indices and forecast the project cost performance. Therefore, EVA is ve...
| Main Author: | Shi Cia, Ng |
|---|---|
| Format: | Undergraduates Project Papers |
| Language: | English |
| Published: |
2014
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/10948/ http://umpir.ump.edu.my/id/eprint/10948/1/FIM%20-%20NG%20SHI%20CIA%20%28CD9006%29.pdf |
Similar Items
The application of earned value management in event project management industry
by: Xin Hao, Yeoh
Published: (2014)
by: Xin Hao, Yeoh
Published: (2014)
The Contribution of Knowledge Management to Project Management Performance in Engineering Project-Based Organisations
by: Nee, Teck Soon
Published: (2015)
by: Nee, Teck Soon
Published: (2015)
Cost overrun of construction project in Pahang : causes and solution
by: Nurafiqah, Abu Hasan
Published: (2017)
by: Nurafiqah, Abu Hasan
Published: (2017)
The moderating effect of project complexity on the relationship between organizational controls and cost estimation performance: A conceptual model
by: M. W., Fazil, et al.
Published: (2022)
by: M. W., Fazil, et al.
Published: (2022)
The effects of non-excusable delay in construction project
by: Nor Shahira, Shaari
Published: (2014)
by: Nor Shahira, Shaari
Published: (2014)
Ethics for multinational JV projects for construction work
by: Amanullah, Muhammad
Published: (2009)
by: Amanullah, Muhammad
Published: (2009)
A construct validation approach for exploring sustainability adoption in Pakistani construction projects
by: Ullah, Mehfooz, et al.
Published: (2020)
by: Ullah, Mehfooz, et al.
Published: (2020)
Project procurement method : the conflicts in construction projects procured under design and build method
by: Mai Ling, Teon
Published: (2014)
by: Mai Ling, Teon
Published: (2014)
Effect of managing technical risk towards reducing cost of production in project
by: Mohd Amerul Amin, Razali
Published: (2014)
by: Mohd Amerul Amin, Razali
Published: (2014)
A study of managing resistance that occurred in construction project
by: Noorfatin Liyana, Suhaimy
Published: (2014)
by: Noorfatin Liyana, Suhaimy
Published: (2014)
Project crashing in construction industry: investigation of the strategies, challenges and impacts
by: Muhammad Redho, Mardzuki
Published: (2013)
by: Muhammad Redho, Mardzuki
Published: (2013)
A study of causes and effects of project change in construction industry
by: Jee, Keh Lih
Published: (2013)
by: Jee, Keh Lih
Published: (2013)
Application Comparison between Construction Quality Assessment System (CONQUAS 21) and Quality Assessment System in Construction (QLASSIC) for Construction Project
by: Lau, Yeong Cherng
Published: (2017)
by: Lau, Yeong Cherng
Published: (2017)
Enhancing cost estimation performance through effective organizational control: the moderating role of project complexity in construction projects
by: Mohammad Waffy, Fazil, et al.
Published: (2024)
by: Mohammad Waffy, Fazil, et al.
Published: (2024)
Interfacing and Complexity Issues in Project Management: A Case Study of A Condominium Construction Project in Klang Valley
by: Tan, Wei Oon
Published: (2016)
by: Tan, Wei Oon
Published: (2016)
Study & review of project planning and control in project division / Ahmad Zamri Hamdan
by: Hamdan, Ahmad Zamri
Published: (1997)
by: Hamdan, Ahmad Zamri
Published: (1997)
Private finance initiative (PFI): concept and method of procurement for construction projects
by: Abdul Rashid, Khairuddin
Published: (2007)
by: Abdul Rashid, Khairuddin
Published: (2007)
The Factors Contributing to Accident Occurrence on Malaysia Building Projects through Partial Least Square Structural Equation Modeling
by: Abulhakim, N., et al.
Published: (2019)
by: Abulhakim, N., et al.
Published: (2019)
The effect of foreign labour involvement on the Malaysian construction project performance / Florina Salleh
by: Florina , Salleh
Published: (2013)
by: Florina , Salleh
Published: (2013)
Risk assessment of time and cost overrun factors throughout construction project lifecycle
by: Ismail, Ismaaini
Published: (2014)
by: Ismail, Ismaaini
Published: (2014)
Infrastructure Project Governance: An Analysis Of Public Sector Project In Northern Pakistan
by: Khan, Asadullah, et al.
Published: (2018)
by: Khan, Asadullah, et al.
Published: (2018)
Project management in the Malaysian construction industry / T. Suresh a/l V.M. Thambyiah
by: V. M. Thambyiah, T. Suresh
Published: (1998)
by: V. M. Thambyiah, T. Suresh
Published: (1998)
The role of project managers in sustainable building process: a study on Malaysian construction industry
by: Suriani, Mat Noor
Published: (2013)
by: Suriani, Mat Noor
Published: (2013)
Adoption of lean tools to control delays in Malaysian construction projects
by: Ansha, Richard Hannis
Published: (2016)
by: Ansha, Richard Hannis
Published: (2016)
Labour costs and labour output information for building construction 2006: Kuala Lumpur, Selangor and Negeri Sembilan
Published: (2007)
Published: (2007)
ICT application in achieving project success : a case study of a construction company in Malaysia
by: Yong Chan, Chua
Published: (2014)
by: Yong Chan, Chua
Published: (2014)
Life Cycle Cost Analysis Of Different Repair Assumptions
by: Mulubrhan, Freselam, et al.
Published: (2018)
by: Mulubrhan, Freselam, et al.
Published: (2018)
The Role of Higher Education in Managing Conflict Situations in Society for Sustainable Development: A Case Study Of UMP’s Contribution in the Controversial Lynas Rare Earth Project
by: Badhrulhisham, Abdul Aziz
Published: (2016)
by: Badhrulhisham, Abdul Aziz
Published: (2016)
A system dynamics model to assess the interrelationship between different knowledge areas of PMBOK in a construction project
by: Zainab, A Malik
Published: (2018)
by: Zainab, A Malik
Published: (2018)
E-Procurement Implementation for Projects (Analysis, Challenges, and Solutions)
by: Jalal Faraj, Salem Almadani
Published: (2016)
by: Jalal Faraj, Salem Almadani
Published: (2016)
A study of the implementation of procurement management system to a project success in mega project construction in Malaysia : a case study of Kuala Lumpur International Airport 2 (KLIA2)
by: Noor Hanira, Mahidin
Published: (2014)
by: Noor Hanira, Mahidin
Published: (2014)
Critical Success Factors – a study of Project Management techniques using Pinto’s Model in the Malaysia housing construction companies perspective
by: Eng, Swee Huat
Published: (2014)
by: Eng, Swee Huat
Published: (2014)
Financial evaluation of two privatised water supply projects / Ng Mee Weng
by: Ng, Mee Weng
Published: (1998)
by: Ng, Mee Weng
Published: (1998)
Organizational Factors, Construction Risk Management and Government Regulations in Nigerian Construction Companies: Data Screening and Preliminary Analysis
by: Adeleke, A. Q., et al.
Published: (2018)
by: Adeleke, A. Q., et al.
Published: (2018)
The Application of Earned Value Management (EVM) in Construction Project Management
by: Tan, Chin Keng, et al.
Published: (2015)
by: Tan, Chin Keng, et al.
Published: (2015)
Analysis of some factors driving ecological sustainability in construction firms
by: Bamgbaded, J. A., et al.
Published: (2018)
by: Bamgbaded, J. A., et al.
Published: (2018)
An Empirical Analysis of Organizational External Factors on Construction Risk Management
by: Adeleke, A. Q., et al.
Published: (2019)
by: Adeleke, A. Q., et al.
Published: (2019)
Factors effecting the cost management in construction projects
by: M. A., Faten Albtoush, et al.
Published: (2019)
by: M. A., Faten Albtoush, et al.
Published: (2019)
The implementation of Analytical Hierarchy Process (AHP) in risk assessment and its limitation in construction in Pahang
by: Wei Jian, Ng
Published: (2014)
by: Wei Jian, Ng
Published: (2014)
The Contribution of Good Corporate Governance in the Commercial Banking Industry in Malaysia
by: Lee, Wing Fatt
Published: (2016)
by: Lee, Wing Fatt
Published: (2016)
Similar Items
-
The application of earned value management in event project management industry
by: Xin Hao, Yeoh
Published: (2014) -
The Contribution of Knowledge Management to Project Management Performance in Engineering Project-Based Organisations
by: Nee, Teck Soon
Published: (2015) -
Cost overrun of construction project in Pahang : causes and solution
by: Nurafiqah, Abu Hasan
Published: (2017) -
The moderating effect of project complexity on the relationship between organizational controls and cost estimation performance: A conceptual model
by: M. W., Fazil, et al.
Published: (2022) -
The effects of non-excusable delay in construction project
by: Nor Shahira, Shaari
Published: (2014)