A study on disturbance factors of traffic flow to the communities in Jalan Maran-Gambang (Pekan Gambang), Pahang Darul Makmur
Traffic flow disruption had been rapidly increase in Malaysia This problem, which causes traffic problems and sometimes vehicles, had lined up (bumper to bumper). Problem in traffic flow occur because of some disturbance factors. Problem of traffic flow disruption during peak hours al*ays occur and...
| Main Author: | Nor Aisyah, Rumidi |
|---|---|
| Format: | Undergraduates Project Papers |
| Language: | English |
| Published: |
2014
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/10252/ http://umpir.ump.edu.my/id/eprint/10252/1/NOR%20AISYAH%20BINTI%20RUMIDI.PDF |
Similar Items
Vehicle growth trends in Universiti Malaysia Pahang Gambang and Pekan campus
by: Siti Nur Liyana, Sheikh Roslan
Published: (2017)
by: Siti Nur Liyana, Sheikh Roslan
Published: (2017)
Review of speed limit for FR222 access road to Gambang toll
by: Hazlyza, Zainon
Published: (2012)
by: Hazlyza, Zainon
Published: (2012)
Pekan Gambang pesat membangun
by: Mohamad Shofi, Mat Isa
Published: (2015)
by: Mohamad Shofi, Mat Isa
Published: (2015)
Determination of hydrology cycle in Universiti Malaysia Pahang (UMP) Gambang and Pekan campus
by: Ihsan, Md Yusoff
Published: (2017)
by: Ihsan, Md Yusoff
Published: (2017)
Campus election runs smoothly, concurrently in Gambang & Pekan
by: UMP, PNC
by: UMP, PNC
Bukti penerobosan air laut di Sekitar Pekan, Pahang Darul Makmur
by: Goh , Swee Heng, et al.
Published: (2000)
by: Goh , Swee Heng, et al.
Published: (2000)
Focus on Gambang
by: M. M., Yusoff, et al.
Published: (2008)
by: M. M., Yusoff, et al.
Published: (2008)
Determination of rainfall trend at Universiti Malaysia Pahang (UMP) campus at Gambang and Pekan using box-plot method
by: Muhammad Zarif, Md. Uzairin
Published: (2019)
by: Muhammad Zarif, Md. Uzairin
Published: (2019)
Sewerage inflow and infiltration in Universiti Malaysia Pahang (Gambang)
by: Liew, Pei Qi
Published: (2015)
by: Liew, Pei Qi
Published: (2015)
The role of culture in acceptance of technology evolution among administrative support personnel in Maran, Pahang Darul Makmur / Hazlin Hasan...[et. al.]
by: Hasan, Hazlin, et al.
Published: (2013)
by: Hasan, Hazlin, et al.
Published: (2013)
A traffic laws monopoly game
by: Eu, Sheau Yien
Published: (2010)
by: Eu, Sheau Yien
Published: (2010)
A study on trip generation in University Malaysia Pahang, Pekan
by: Nurhidayatul Akhma, Mat Roka
Published: (2017)
by: Nurhidayatul Akhma, Mat Roka
Published: (2017)
Schools days impact on traffic flow in and around school area: case study of Sekolah Kebangsaan Gombak Utara
by: Hamdan, Hafizuddin, et al.
Published: (2015)
by: Hamdan, Hafizuddin, et al.
Published: (2015)
Relationship between roadside features and road traffic accidents along KM 3 - KM 27 of Jalan Kuantan-Gambang
by: Marzida, Abdul Manaf
Published: (2010)
by: Marzida, Abdul Manaf
Published: (2010)
Traffic calming study : the effectiveness of various types of speed humps
by: Muhammad Farhan, Abd. Karim
Published: (2012)
by: Muhammad Farhan, Abd. Karim
Published: (2012)
Sehati@Gambang bantu masyarakat
by: Mimi Rabita, Abdul Wahit
Published: (2016)
by: Mimi Rabita, Abdul Wahit
Published: (2016)
Kepuasan kerja guru agama di sekolah menengah daerah Pekan dan Rompin Pahang Darul Makmur
by: Ahmad Shukran, Bin Mohamad.
Published: (1997)
by: Ahmad Shukran, Bin Mohamad.
Published: (1997)
The relationship between work environment and job
performance among support staff in selected government
offices in Maran, Pahang Darul Makmur / Fatin Awani Zainudin
by: Zainudin, Fatin Awani
Published: (2018)
by: Zainudin, Fatin Awani
Published: (2018)
People And Plants Of Tasik Bera, Pahang Darul Makmur
by: Mohd. Zain, Zainul Hakim, et al.
Published: (2008)
by: Mohd. Zain, Zainul Hakim, et al.
Published: (2008)
Gas reticulation system design for Universiti Malaysia Pahang Gambang campus
by: Shafiq Afif, Ariff
Published: (2008)
by: Shafiq Afif, Ariff
Published: (2008)
Municipal Solid Waste Composition Study of Selected Area in Gambang, Pahang
by: Wan Faizal, Wan Ishak, et al.
Published: (2013)
by: Wan Faizal, Wan Ishak, et al.
Published: (2013)
Risk and mitigation of vehicles parking for Gambang University Malaysia Pahang (UMP)
by: Zainurulaini, Zainal Abidin
Published: (2010)
by: Zainurulaini, Zainal Abidin
Published: (2010)
3D mapping direction Universiti Malaysia Pahang campus Gambang
by: Tines Kumar, Ponniah
Published: (2014)
by: Tines Kumar, Ponniah
Published: (2014)
Modeling on the association between road environment contributory factors and road traffic accidents for Federal Road 2
by: Intan Suhana, M. R., et al.
Published: (2012)
by: Intan Suhana, M. R., et al.
Published: (2012)
Evaluation of road safety level of federal route 3 (F3) and state route C17 (C17) : b a case study of Kuantan main entrance road from Pekan
by: Ramasamy, Sangeetha
Published: (2010)
by: Ramasamy, Sangeetha
Published: (2010)
Rainfall trend analysis using box plot method: case study UMP Campus Gambang and Pekan
by: Nadiatul Adilah, Ahmad Abdul Ghani, et al.
Published: (2020)
by: Nadiatul Adilah, Ahmad Abdul Ghani, et al.
Published: (2020)
The development of rainfall temporal pattern in Gambang
by: Nursyafiqah Amira, Ahmad Zaimi
Published: (2019)
by: Nursyafiqah Amira, Ahmad Zaimi
Published: (2019)
UMP continues to operate Gambang Campus
by: UMP, PNC
by: UMP, PNC
CMLHS luncheon at Bukit Gambang Resort
by: Ahmad, Ibrahim
Published: (2012)
by: Ahmad, Ibrahim
Published: (2012)
Sustainability study of u-turn at km16 – km 18, Jalan Kuantan - Gambang
by: Nor Azliayana, Ahmad Nordin
Published: (2017)
by: Nor Azliayana, Ahmad Nordin
Published: (2017)
Performance monitoring of Kuantan-Gambang (FR 2) and Gambang toll plaza (FR 222)-Muadzam (FR 12) cross junction using Malaysian intelligent traffic system (MITS)
by: Wong Choon Kit, Kevin
Published: (2019)
by: Wong Choon Kit, Kevin
Published: (2019)
Review the implementation waste management practices in construction work around Taman Indera Sempurna, Pekan-Kuantan, Pahang Darul Makmur
by: Mohd Nurarif, Zulhemay
Published: (2012)
by: Mohd Nurarif, Zulhemay
Published: (2012)
Acceptance of technological changes and job performance among administrative support personnel in the government offices in Maran, Pahang Darul Makmur / Hazlin Hasan and Feridah Hj Mohd Nadzar
by: Hasan, Hazlin, et al.
Published: (2010)
by: Hasan, Hazlin, et al.
Published: (2010)
Modelling of rainfall-runoff relationship at subcatchment of Universiti Malaysia Pahang, Gambang Campus
by: Siti Hajar, Rosli
Published: (2016)
by: Siti Hajar, Rosli
Published: (2016)
Study on current practice of construction waste management system in Gambang, Kuantan, Pahang
by: Nur Fatin Aqilah, Mat Zin
Published: (2016)
by: Nur Fatin Aqilah, Mat Zin
Published: (2016)
A study of the heavy metal in tap water quality in Gambang area, Pahang
by: Noraina, Mohd Khlapiah
Published: (2017)
by: Noraina, Mohd Khlapiah
Published: (2017)
UMPSA forges sustainability cooperation with Tanah Makmur Berhad
by: Naqiah, Puaad
Published: (2024)
by: Naqiah, Puaad
Published: (2024)
EAL 335 TRAFFIC AND TRANSPORTATION ENGINEERING (JUN 2016)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2016)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2016)
Determination of heavy metals in Gambang Lake Water
by: Nur Fatiha , Amat Sani
Published: (2012)
by: Nur Fatiha , Amat Sani
Published: (2012)
The study of potential evapotranspiration (PET) in UMP Gambang
by: Nor Afifah, Mohamad
Published: (2019)
by: Nor Afifah, Mohamad
Published: (2019)
Similar Items
-
Vehicle growth trends in Universiti Malaysia Pahang Gambang and Pekan campus
by: Siti Nur Liyana, Sheikh Roslan
Published: (2017) -
Review of speed limit for FR222 access road to Gambang toll
by: Hazlyza, Zainon
Published: (2012) -
Pekan Gambang pesat membangun
by: Mohamad Shofi, Mat Isa
Published: (2015) -
Determination of hydrology cycle in Universiti Malaysia Pahang (UMP) Gambang and Pekan campus
by: Ihsan, Md Yusoff
Published: (2017) -
Campus election runs smoothly, concurrently in Gambang & Pekan
by: UMP, PNC