Causes of time delay in construction Sarawak, Malaysia

The aim of this study was to determine the factor that causes project delays in construction industries around Sarawak, Malaysia. By determining this factor, the project delays can be overcomed by the related group. Through literature review, 90 factors which lead to the time delay in construction w...

Full description

Bibliographic Details
Main Author: Harrison Yan, Rolland Duat
Format: Undergraduates Project Papers
Language:English
Published: 2014
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/10233/
http://umpir.ump.edu.my/id/eprint/10233/1/HARRISON%20YAN%20ANAK%20ROLLAND%20DUAT.PDF
_version_ 1848818695487356928
author Harrison Yan, Rolland Duat
author_facet Harrison Yan, Rolland Duat
author_sort Harrison Yan, Rolland Duat
building UMP Institutional Repository
collection Online Access
description The aim of this study was to determine the factor that causes project delays in construction industries around Sarawak, Malaysia. By determining this factor, the project delays can be overcomed by the related group. Through literature review, 90 factors which lead to the time delay in construction were identified from previous studies which were then clustered into three categories; contractor-related, consultant-related, owner-related. As a result, 14 factors were selected for contractor-related, 11 factors were selected for consultant-related and 14 factors were selected for owner-related. A questionnaire was then developed and distributed to the 12 construction companies in Sarawak. Prior to questionnaire distribution, interviews had also been conducted to understand in depth the causes of project delays. Using Mean Square and Standard deviation analysis method, the questionnaires were then analysed and each factor was ranked. From the data analysis, Inadequate owner finance and payment of completed work were top ranked for the contractor-related with a score of 4.07. For the consultant-related, slow inspection of completed work with a score 3.84 was ranked as the highest factor which contributed to project delays in construction field. Meanwhile, slow payment of completed work with a score 4.32 was the most highest factor which had contributed to delay in construction for owner-related group.
first_indexed 2025-11-15T01:41:45Z
format Undergraduates Project Papers
id ump-10233
institution Universiti Malaysia Pahang
institution_category Local University
language English
last_indexed 2025-11-15T01:41:45Z
publishDate 2014
recordtype eprints
repository_type Digital Repository
spelling ump-102332021-07-15T03:47:39Z http://umpir.ump.edu.my/id/eprint/10233/ Causes of time delay in construction Sarawak, Malaysia Harrison Yan, Rolland Duat TH Building construction The aim of this study was to determine the factor that causes project delays in construction industries around Sarawak, Malaysia. By determining this factor, the project delays can be overcomed by the related group. Through literature review, 90 factors which lead to the time delay in construction were identified from previous studies which were then clustered into three categories; contractor-related, consultant-related, owner-related. As a result, 14 factors were selected for contractor-related, 11 factors were selected for consultant-related and 14 factors were selected for owner-related. A questionnaire was then developed and distributed to the 12 construction companies in Sarawak. Prior to questionnaire distribution, interviews had also been conducted to understand in depth the causes of project delays. Using Mean Square and Standard deviation analysis method, the questionnaires were then analysed and each factor was ranked. From the data analysis, Inadequate owner finance and payment of completed work were top ranked for the contractor-related with a score of 4.07. For the consultant-related, slow inspection of completed work with a score 3.84 was ranked as the highest factor which contributed to project delays in construction field. Meanwhile, slow payment of completed work with a score 4.32 was the most highest factor which had contributed to delay in construction for owner-related group. 2014-06 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/10233/1/HARRISON%20YAN%20ANAK%20ROLLAND%20DUAT.PDF Harrison Yan, Rolland Duat (2014) Causes of time delay in construction Sarawak, Malaysia. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.
spellingShingle TH Building construction
Harrison Yan, Rolland Duat
Causes of time delay in construction Sarawak, Malaysia
title Causes of time delay in construction Sarawak, Malaysia
title_full Causes of time delay in construction Sarawak, Malaysia
title_fullStr Causes of time delay in construction Sarawak, Malaysia
title_full_unstemmed Causes of time delay in construction Sarawak, Malaysia
title_short Causes of time delay in construction Sarawak, Malaysia
title_sort causes of time delay in construction sarawak, malaysia
topic TH Building construction
url http://umpir.ump.edu.my/id/eprint/10233/
http://umpir.ump.edu.my/id/eprint/10233/1/HARRISON%20YAN%20ANAK%20ROLLAND%20DUAT.PDF