Critical factors in project success: a study of public sector construction projects in Malaysia / Wan Maimun Wan Abdullah
The importance of the construction industry to nation building necessitates that project implemented achieves project success. However, studies and evidence have shown that there is a low probability in consistently achieving project success. Nevertheless, it seems that the definition of project suc...
| Main Author: | Wan Maimun, Wan Abdullah |
|---|---|
| Format: | Thesis |
| Published: |
2010
|
| Subjects: | |
| Online Access: | http://studentsrepo.um.edu.my/9230/ http://studentsrepo.um.edu.my/9230/4/Critical_factors_in_project_success;_a_study_of_public_sector_construction_projects_in_Malaysia_(TH145_UMP2010_Wanmwa).pdf |
Similar Items
Overview of lean issues in managing the green construction project / Wan Nur Syazwani Wan Mohammad and Mohd Rofdzi Abdullah
by: Wan Nur Syazwani, Wan Mohammad, et al.
Published: (2015)
by: Wan Nur Syazwani, Wan Mohammad, et al.
Published: (2015)
Critical success factors and barriers for industrialised building system (IBS) adoption in construction project
by: Suhaida Noorein, Iskandar Mirza
Published: (2010)
by: Suhaida Noorein, Iskandar Mirza
Published: (2010)
Success factors of design-build public sector projects in Malaysia
by: Lee, Z. P., et al.
Published: (2020)
by: Lee, Z. P., et al.
Published: (2020)
Ready-to-assemble (RTA) housing system as self build housing in Malaysia / Wan Srihani Wan Mohamed
by: Wan Srihani, Wan Mohamed
Published: (2015)
by: Wan Srihani, Wan Mohamed
Published: (2015)
Construction waste management: Level of practice of contractors / Wan Zukri Wan Abdullah and Ahmad Ruslan Mohd Ridzuan
by: Wan Abdullah, Wan Zukri, et al.
Published: (2008)
by: Wan Abdullah, Wan Zukri, et al.
Published: (2008)
Critical success factors model (CSF’sM) affecting the competencies of civil engineer in construction project
by: Ismail, Hassan
Published: (2020)
by: Ismail, Hassan
Published: (2020)
Investigation Into The Causes Of Delays And Cost Overruns In
Uganda's Public Sector Construction Projects
by: Alinaitwe, Henry, et al.
Published: (2013)
by: Alinaitwe, Henry, et al.
Published: (2013)
Establishing critical success factors for project management best practices in sustainable housing in Malaysia.
by: Bakar, Abu Hassan Abu, et al.
Published: (2008)
by: Bakar, Abu Hassan Abu, et al.
Published: (2008)
Factors that affect the performance of public project in Malaysia
by: Norsyahidatul Nazirah , Ismail
Published: (2012)
by: Norsyahidatul Nazirah , Ismail
Published: (2012)
Influential factors affecting materials management in construction projects
by: Mat Jusoh, Zairra, et al.
Published: (2017)
by: Mat Jusoh, Zairra, et al.
Published: (2017)
Determining Critical Success Factors For Sustainable Construction
by: Ponniah, Vignes
Published: (2016)
by: Ponniah, Vignes
Published: (2016)
Critical success factors in construction industry in Sudan
by: Abdalrahman, Salma, et al.
Published: (2008)
by: Abdalrahman, Salma, et al.
Published: (2008)
Ensuring the sustainability of public sector utility projects in Pakistan
by: Sohail, Shahid
Published: (2008)
by: Sohail, Shahid
Published: (2008)
Factors Affecting the Selection of the Procurement Methods for Construction Projects in Malaysia
by: Yap, Zhi Shan, et al.
Published: (2019)
by: Yap, Zhi Shan, et al.
Published: (2019)
Impact of the cost overrun factors on the project delays in construction industry
by: Noor Elinah, Sailin
Published: (2018)
by: Noor Elinah, Sailin
Published: (2018)
Evaluating the causes and effects of construction disputes in private sector projects
by: Lim, Kelly Kah Yee
Published: (2024)
by: Lim, Kelly Kah Yee
Published: (2024)
Development Of Supply Chain Management Framework For Building Information Modelling Implementation In Public Sector Construction Projects
by: Ahmad, Nur Hidayah
Published: (2022)
by: Ahmad, Nur Hidayah
Published: (2022)
Development Of Supply Chain Management Framework For Building Information Modelling Implementation In Public Sector Construction Projects
by: Ahmad, Nur Hidayah
Published: (2022)
by: Ahmad, Nur Hidayah
Published: (2022)
The Use Of Supply Chain Management To Reduce Low Labour Productivity In Malaysian Public Sector Construction Projects
by: Loh, Yong Seng
Published: (2024)
by: Loh, Yong Seng
Published: (2024)
External factors affecting construction project performance in Iraq using pestle factors
by: Khalid, Layth Salman
Published: (2020)
by: Khalid, Layth Salman
Published: (2020)
Mitigation measures for critical factors causing cost overrun in Malaysian building projects
by: Ullah, Kaleem
Published: (2018)
by: Ullah, Kaleem
Published: (2018)
Critical Causes and Consequences of Construction Project Interruption: Client, Contractor, Consultant and External Factors Standpoints
by: Mohamed Alias, Nurbasirah, et al.
Published: (2013)
by: Mohamed Alias, Nurbasirah, et al.
Published: (2013)
A Critical Review of Factors Affecting Manpower and Equipment
Productivity in Tall Building Construction Projects
by: Parthasarathy, Mudumbai Krishnaswamy, et al.
Published: (2017)
by: Parthasarathy, Mudumbai Krishnaswamy, et al.
Published: (2017)
The analysis of factors contributed to delay and method to analyze the delay in construction project
by: Mohammad Solhi, Mohammed
Published: (2010)
by: Mohammad Solhi, Mohammed
Published: (2010)
The factors and effect of delay in government construction project (case study in Kuantan)
by: Mohd Rosazuwad, Mohamad@Muda
Published: (2010)
by: Mohd Rosazuwad, Mohamad@Muda
Published: (2010)
Using factor analysis to assess the key factors influencing the success completion of a public school project in Malaysia
by: Mohd Nasir, Siti Rashidah, et al.
Published: (2008)
by: Mohd Nasir, Siti Rashidah, et al.
Published: (2008)
Cost control in construction project of the site
by: Mohd Iskandar Zulkarnain, Talib
Published: (2010)
by: Mohd Iskandar Zulkarnain, Talib
Published: (2010)
In-success factor for project management in high-rise building project
by: Yahya Al-Tawil, Yahya Mohsen
Published: (2019)
by: Yahya Al-Tawil, Yahya Mohsen
Published: (2019)
A study on domestic subcontractor in Kota Bharu : critical analysis of construction management in handling local project
by: Muhammad Shahmi , Mat Saat
Published: (2011)
by: Muhammad Shahmi , Mat Saat
Published: (2011)
Project Management Success Factors For Sustainable Housing: A Framework
by: Bakar, Abu Hassan Abu, et al.
Published: (2009)
by: Bakar, Abu Hassan Abu, et al.
Published: (2009)
Impact of cost overrun factors on the project delay in construction industry, Pahang, Malaysia
by: Zhi Jia, Ling
Published: (2014)
by: Zhi Jia, Ling
Published: (2014)
Structural model of factors affecting pmo performance in uae mega construction projects
by: Saleh Almansoori, Maitha Taher
Published: (2022)
by: Saleh Almansoori, Maitha Taher
Published: (2022)
A study of the developer's liability on abandoned projects in Malaysia / Ros Adleen Othman, Wan Rosalili Wan Rosli
by: Othman, Ros Adleen, et al.
Published: (2007)
by: Othman, Ros Adleen, et al.
Published: (2007)
The Significant Risks In Small Scale Construction Projects
by: Nur Sharkila, Muhammad Shukri, et al.
Published: (2016)
by: Nur Sharkila, Muhammad Shukri, et al.
Published: (2016)
The causes and effect of delay in construction industry project
by: Intan Diana, Musa
Published: (2012)
by: Intan Diana, Musa
Published: (2012)
Application of drone in visual inspection for construction project
by: Adam Zakwan, Zainuddin
Published: (2015)
by: Adam Zakwan, Zainuddin
Published: (2015)
Causes and effects of poor communication in construction projects
by: Rageh Gamil, Yaser Mohammed
Published: (2020)
by: Rageh Gamil, Yaser Mohammed
Published: (2020)
Managing construction of telecommunication tower projects in Celcom
by: Pison, Zirwatul Hana
Published: (2007)
by: Pison, Zirwatul Hana
Published: (2007)
A critical analysis on Housing And Development (Control And Licensing) (Amendment) Act 2012: criminalised abandonment of housing projects. / Mohamad Shahrizzat Amadan, Wan Ahmad Hijrah Wan Abdullah and Najwa Abd Malek
by: Amadan, Mohamad Shahrizzat, et al.
Published: (2013)
by: Amadan, Mohamad Shahrizzat, et al.
Published: (2013)
Planning & scheduling for construction project: a case study of duration estimation & influence factors
by: Nor Hashimah, Mohd Fuzi
Published: (2014)
by: Nor Hashimah, Mohd Fuzi
Published: (2014)
Similar Items
-
Overview of lean issues in managing the green construction project / Wan Nur Syazwani Wan Mohammad and Mohd Rofdzi Abdullah
by: Wan Nur Syazwani, Wan Mohammad, et al.
Published: (2015) -
Critical success factors and barriers for industrialised building system (IBS) adoption in construction project
by: Suhaida Noorein, Iskandar Mirza
Published: (2010) -
Success factors of design-build public sector projects in Malaysia
by: Lee, Z. P., et al.
Published: (2020) -
Ready-to-assemble (RTA) housing system as self build housing in Malaysia / Wan Srihani Wan Mohamed
by: Wan Srihani, Wan Mohamed
Published: (2015) -
Construction waste management: Level of practice of contractors / Wan Zukri Wan Abdullah and Ahmad Ruslan Mohd Ridzuan
by: Wan Abdullah, Wan Zukri, et al.
Published: (2008)