A comparison study for active chilled beam and variable air volume systems for an office building / Tam Jun Hao

Comparison in terms of energy and cost is carried out between two different air distribution systems: variable air volume (VAV) and active chilled beam (ACB) based on a virtual building. Cooling load calculation was performed to determine the total load demand and system design was carried out to de...

Full description

Bibliographic Details
Main Author: Tam, Jun Hao
Format: Thesis
Published: 2018
Subjects:
Online Access:http://studentsrepo.um.edu.my/8567/
http://studentsrepo.um.edu.my/8567/17/Final.pdf
_version_ 1848773692619751424
author Tam, Jun Hao
author_facet Tam, Jun Hao
author_sort Tam, Jun Hao
building UM Research Repository
collection Online Access
description Comparison in terms of energy and cost is carried out between two different air distribution systems: variable air volume (VAV) and active chilled beam (ACB) based on a virtual building. Cooling load calculation was performed to determine the total load demand and system design was carried out to determine the system capacity. All design steps were presented in detail for both systems based on appropriate design requirement in accordance with ASHRAE’s standards. Comparing to VAV, ACB is more complicated in terms of design as it involves specific design considerations such as room latent load shall not be too high, secondary chilled water temperature shall not be lower than the room dew point temperature and room shall have adequate ceiling space for the placement of chilled beam. Energy and cost analysis was done to determine which system gives better saving. From the results analysis, it shows that ACB is more energy-saving than VAV especially at full load and normal part-load conditions because of the reduced AHU fan’s capacity. In terms of cost, ACB has higher initial cost than VAV where it is mainly contributed by the secondary chilled water pipe, heat exchanger and the beam itself. However, the operation cost is lower for ACB and for long term use, ACB is more cost-saving than VAV. Since the results discussed in this thesis is obtained by numerical method, for future work, it’s recommended to perform energy audit on the actual building in order to verify the validity of the computed results.
first_indexed 2025-11-14T13:46:27Z
format Thesis
id um-8567
institution University Malaya
institution_category Local University
last_indexed 2025-11-14T13:46:27Z
publishDate 2018
recordtype eprints
repository_type Digital Repository
spelling um-85672021-07-13T18:20:05Z A comparison study for active chilled beam and variable air volume systems for an office building / Tam Jun Hao Tam, Jun Hao T Technology (General) TJ Mechanical engineering and machinery Comparison in terms of energy and cost is carried out between two different air distribution systems: variable air volume (VAV) and active chilled beam (ACB) based on a virtual building. Cooling load calculation was performed to determine the total load demand and system design was carried out to determine the system capacity. All design steps were presented in detail for both systems based on appropriate design requirement in accordance with ASHRAE’s standards. Comparing to VAV, ACB is more complicated in terms of design as it involves specific design considerations such as room latent load shall not be too high, secondary chilled water temperature shall not be lower than the room dew point temperature and room shall have adequate ceiling space for the placement of chilled beam. Energy and cost analysis was done to determine which system gives better saving. From the results analysis, it shows that ACB is more energy-saving than VAV especially at full load and normal part-load conditions because of the reduced AHU fan’s capacity. In terms of cost, ACB has higher initial cost than VAV where it is mainly contributed by the secondary chilled water pipe, heat exchanger and the beam itself. However, the operation cost is lower for ACB and for long term use, ACB is more cost-saving than VAV. Since the results discussed in this thesis is obtained by numerical method, for future work, it’s recommended to perform energy audit on the actual building in order to verify the validity of the computed results. 2018-01 Thesis NonPeerReviewed application/pdf http://studentsrepo.um.edu.my/8567/17/Final.pdf Tam, Jun Hao (2018) A comparison study for active chilled beam and variable air volume systems for an office building / Tam Jun Hao. Masters thesis, University of Malaya. http://studentsrepo.um.edu.my/8567/
spellingShingle T Technology (General)
TJ Mechanical engineering and machinery
Tam, Jun Hao
A comparison study for active chilled beam and variable air volume systems for an office building / Tam Jun Hao
title A comparison study for active chilled beam and variable air volume systems for an office building / Tam Jun Hao
title_full A comparison study for active chilled beam and variable air volume systems for an office building / Tam Jun Hao
title_fullStr A comparison study for active chilled beam and variable air volume systems for an office building / Tam Jun Hao
title_full_unstemmed A comparison study for active chilled beam and variable air volume systems for an office building / Tam Jun Hao
title_short A comparison study for active chilled beam and variable air volume systems for an office building / Tam Jun Hao
title_sort comparison study for active chilled beam and variable air volume systems for an office building / tam jun hao
topic T Technology (General)
TJ Mechanical engineering and machinery
url http://studentsrepo.um.edu.my/8567/
http://studentsrepo.um.edu.my/8567/17/Final.pdf