_version_ 1848772451330162688
author Mohd Azrai, Azman
author_facet Mohd Azrai, Azman
author_sort Mohd Azrai, Azman
building UM Research Repository
collection Online Access
first_indexed 2025-11-14T13:26:43Z
format Thesis
id um-3587
institution University Malaya
institution_category Local University
last_indexed 2025-11-14T13:26:43Z
publishDate 2012
recordtype eprints
repository_type Digital Repository
spelling um-35872013-08-20T04:17:50Z The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman Mohd Azrai, Azman TH Building construction 2012-08-09 Thesis NonPeerReviewed application/pdf http://studentsrepo.um.edu.my/3587/1/Mohd_Azrai_%2D_THE_ACCURACY_OF_PRELIMINARY_COST_ESTIMATES_IN_PUBLIC_WORKS_DEPARTMENT__PWD__OF_PENINSULAR_MALAYSI.pdf http://pendeta.um.edu.my/client/default/search/results?qu=The+accuracy+of+preliminary+cost+estimates+in+Public+Works+Department+%28PWD%29+of+Peninsular+Malaysia&te= Mohd Azrai, Azman (2012) The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman. Masters thesis, University of Malaya. http://studentsrepo.um.edu.my/3587/
spellingShingle TH Building construction
Mohd Azrai, Azman
The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman
title The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman
title_full The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman
title_fullStr The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman
title_full_unstemmed The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman
title_short The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman
title_sort accuracy of preliminary cost estimates in public works department (pwd) of peninsular malaysia / mohd azrai azman
topic TH Building construction
url http://pendeta.um.edu.my/client/default/search/results?qu=The+accuracy+of+preliminary+cost+estimates+in+Public+Works+Department+%28PWD%29+of+Peninsular+Malaysia&te=
http://pendeta.um.edu.my/client/default/search/results?qu=The+accuracy+of+preliminary+cost+estimates+in+Public+Works+Department+%28PWD%29+of+Peninsular+Malaysia&te=
http://studentsrepo.um.edu.my/3587/1/Mohd_Azrai_%2D_THE_ACCURACY_OF_PRELIMINARY_COST_ESTIMATES_IN_PUBLIC_WORKS_DEPARTMENT__PWD__OF_PENINSULAR_MALAYSI.pdf