Mohd Azrai, A. (2012). The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman.
Chicago Style (17th ed.) CitationMohd Azrai, Azman. The Accuracy of Preliminary Cost Estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman. 2012.
MLA (9th ed.) CitationMohd Azrai, Azman. The Accuracy of Preliminary Cost Estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman. 2012.
Warning: These citations may not always be 100% accurate.