Determining the delay factors for reconstructed mega-project’s phases and the associated challenges / Basem Adnan Al Khatib

In recent decades, the construction industry has developed rapidly. Delays in construction projects are a common phenomenon throughout industry. It was and remains one of the most important challenges negatively affecting not only this industry but also the economy. Many studies were conducted to id...

Full description

Bibliographic Details
Main Author: Basem Adnan , Al Khatib
Format: Thesis
Published: 2021
Subjects:
Online Access:http://studentsrepo.um.edu.my/13998/
http://studentsrepo.um.edu.my/13998/1/Basem_Adnan.pdf
http://studentsrepo.um.edu.my/13998/2/Basem_Adnan.pdf
_version_ 1848774899119685632
author Basem Adnan , Al Khatib
author_facet Basem Adnan , Al Khatib
author_sort Basem Adnan , Al Khatib
building UM Research Repository
collection Online Access
description In recent decades, the construction industry has developed rapidly. Delays in construction projects are a common phenomenon throughout industry. It was and remains one of the most important challenges negatively affecting not only this industry but also the economy. Many studies were conducted to identify the delay factors in new construction projects in different regions, but very few have focused on finding an explanation for the delay causes in reconstruction projects. The study aims to conduct a comprehensive analysis of the delay factors in mega reconstruction projects which took place recently in the Middle East, namely Mataf Expansion Project in Mecca, Saudi Arabia. This project consists of two main parts, nonhistorical and historical and it clarifies the difficulties facing this type of reconstruction projects, which combine demolition and construction works at the same time while the project is under operation. In order to achieve the study goal, twenty-nine interviews were held with the experts working on the project to identify the delay factors and ninety-three questionnaires were distributed by hand to sort them. The results showed that these factors could be divided into three groups: the first one is related to the demolition phase and the second is related to construction phase, while the last is related to overall reconstruction duration. In addition, it has been observed that the materials challenges are considered the major delay factor in the historical building of this project. The questionnaire results were analyzed and delay factors were sorted in a descending order according to the relative importance index (RII). The three main factors affecting the overall reconstruction project duration were site conditions and constraints, electrical and mechanical rerouting works, and design constructability and modification. Finally, recommendations were provided to bridge or reduce the negative impacts of the delay factors in future reconstruction projects.
first_indexed 2025-11-14T14:05:38Z
format Thesis
id um-13998
institution University Malaya
institution_category Local University
last_indexed 2025-11-14T14:05:38Z
publishDate 2021
recordtype eprints
repository_type Digital Repository
spelling um-139982022-10-11T22:53:21Z Determining the delay factors for reconstructed mega-project’s phases and the associated challenges / Basem Adnan Al Khatib Basem Adnan , Al Khatib TA Engineering (General). Civil engineering (General) In recent decades, the construction industry has developed rapidly. Delays in construction projects are a common phenomenon throughout industry. It was and remains one of the most important challenges negatively affecting not only this industry but also the economy. Many studies were conducted to identify the delay factors in new construction projects in different regions, but very few have focused on finding an explanation for the delay causes in reconstruction projects. The study aims to conduct a comprehensive analysis of the delay factors in mega reconstruction projects which took place recently in the Middle East, namely Mataf Expansion Project in Mecca, Saudi Arabia. This project consists of two main parts, nonhistorical and historical and it clarifies the difficulties facing this type of reconstruction projects, which combine demolition and construction works at the same time while the project is under operation. In order to achieve the study goal, twenty-nine interviews were held with the experts working on the project to identify the delay factors and ninety-three questionnaires were distributed by hand to sort them. The results showed that these factors could be divided into three groups: the first one is related to the demolition phase and the second is related to construction phase, while the last is related to overall reconstruction duration. In addition, it has been observed that the materials challenges are considered the major delay factor in the historical building of this project. The questionnaire results were analyzed and delay factors were sorted in a descending order according to the relative importance index (RII). The three main factors affecting the overall reconstruction project duration were site conditions and constraints, electrical and mechanical rerouting works, and design constructability and modification. Finally, recommendations were provided to bridge or reduce the negative impacts of the delay factors in future reconstruction projects. 2021-08 Thesis NonPeerReviewed application/pdf http://studentsrepo.um.edu.my/13998/1/Basem_Adnan.pdf application/pdf http://studentsrepo.um.edu.my/13998/2/Basem_Adnan.pdf Basem Adnan , Al Khatib (2021) Determining the delay factors for reconstructed mega-project’s phases and the associated challenges / Basem Adnan Al Khatib. PhD thesis, Universiti Malaya. http://studentsrepo.um.edu.my/13998/
spellingShingle TA Engineering (General). Civil engineering (General)
Basem Adnan , Al Khatib
Determining the delay factors for reconstructed mega-project’s phases and the associated challenges / Basem Adnan Al Khatib
title Determining the delay factors for reconstructed mega-project’s phases and the associated challenges / Basem Adnan Al Khatib
title_full Determining the delay factors for reconstructed mega-project’s phases and the associated challenges / Basem Adnan Al Khatib
title_fullStr Determining the delay factors for reconstructed mega-project’s phases and the associated challenges / Basem Adnan Al Khatib
title_full_unstemmed Determining the delay factors for reconstructed mega-project’s phases and the associated challenges / Basem Adnan Al Khatib
title_short Determining the delay factors for reconstructed mega-project’s phases and the associated challenges / Basem Adnan Al Khatib
title_sort determining the delay factors for reconstructed mega-project’s phases and the associated challenges / basem adnan al khatib
topic TA Engineering (General). Civil engineering (General)
url http://studentsrepo.um.edu.my/13998/
http://studentsrepo.um.edu.my/13998/1/Basem_Adnan.pdf
http://studentsrepo.um.edu.my/13998/2/Basem_Adnan.pdf