Systematic approach for developing as-built schedule for construction project
It is widely recognized that construction industry is information intensive and complex industry. However, present trend and proliferations towards multi-participant mega projects have heightened the need for an effective and efficient evaluation and monitoring by stakeholders. A persistent proble...
| Main Authors: | Zubair Ahmed Memon, Muhd Zaimi Abd Majid, Nur Izzi Md. Yusoff, Mushairry Mustaffar |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
2006
|
| Online Access: | http://journalarticle.ukm.my/1455/ http://journalarticle.ukm.my/1455/1/2006-14.pdf |
Similar Items
A systematic approach for monitoring and evaluating the construction project progress
by: Memon, Zubair Ahmed, et al.
Published: (2006)
by: Memon, Zubair Ahmed, et al.
Published: (2006)
A systematic procedure for developing the 3D model to evaluate the construction project progress
by: Ahmed Memon, Zubair, et al.
Published: (2007)
by: Ahmed Memon, Zubair, et al.
Published: (2007)
The use of photogrammetry techniques to evaluate the construction project progress
by: Ahmed Memon, Zubair, et al.
Published: (2006)
by: Ahmed Memon, Zubair, et al.
Published: (2006)
Digitalizing Construction Monitoring (DCM): an overview of Malaysian construction industry and proposing prototype software
by: Ahmed Memon, Zubair, et al.
Published: (2006)
by: Ahmed Memon, Zubair, et al.
Published: (2006)
An approach to joint roughness measurement in Rock-A comparative study
by: Mohd. Amin, Mohd. For, et al.
Published: (2001)
by: Mohd. Amin, Mohd. For, et al.
Published: (2001)
Enablers and Barriers to Project Planning and Scheduling Based on
Construction Projects in Oman
by: Nasseri, Hammad Al, et al.
Published: (2016)
by: Nasseri, Hammad Al, et al.
Published: (2016)
Probability distribution fitting of schedule overruns in construction projects
by: Love, Peter, et al.
Published: (2013)
by: Love, Peter, et al.
Published: (2013)
Guidelines for the preparation and submission of work schedule for construction project
by: Mohamad Zin, Rosli, et al.
Published: (2008)
by: Mohamad Zin, Rosli, et al.
Published: (2008)
Determining the basic principles in managing project schedule for construction.
by: Mohammad, Mohammad Ibrahim, et al.
Published: (2005)
by: Mohammad, Mohammad Ibrahim, et al.
Published: (2005)
Automated pavement imaging program (APIP) for pavement cracks classification and quantification – a photogrammetric approach
by: Mustaffar, Mushairry, et al.
Published: (2008)
by: Mustaffar, Mushairry, et al.
Published: (2008)
A study on schedule management for BIM projects in the construction industry
by: Soon Ern, Peniel Ang, et al.
Published: (2018)
by: Soon Ern, Peniel Ang, et al.
Published: (2018)
Productivity assessment and schedule compression index for construction project planning
by: Mansur, Shaiful Amri
Published: (2004)
by: Mansur, Shaiful Amri
Published: (2004)
Project cost performance forecasting system
by: Mohd. Nasira, Siti Rashidah, et al.
Published: (2006)
by: Mohd. Nasira, Siti Rashidah, et al.
Published: (2006)
An effectiveness of communication in project undertaking: problems and constraints
by: Mohd. Yusuf, Aminah, et al.
Published: (2001)
by: Mohd. Yusuf, Aminah, et al.
Published: (2001)
Causes of accidents at construction sites
by: Abdul Hamid, Abdul Rahim, et al.
Published: (2008)
by: Abdul Hamid, Abdul Rahim, et al.
Published: (2008)
Comparative study in construction scheduling by using primavera P6 and microsoft project
by: Nor Farahin, Baharudin
Published: (2014)
by: Nor Farahin, Baharudin
Published: (2014)
Investigating the feasibility of photogrammetric area-based image matching technique in the measurement of three-dimensional deflections of structures
by: Mustaffar, Mushairry, et al.
Published: (2005)
by: Mustaffar, Mushairry, et al.
Published: (2005)
Transforming the Built Environment Through Construction Innovation
by: Newton, P., et al.
Published: (2009)
by: Newton, P., et al.
Published: (2009)
Using factor analysis to assess the key factors influencing the success completion of a public school project in Malaysia
by: Mohd Nasir, Siti Rashidah, et al.
Published: (2008)
by: Mohd Nasir, Siti Rashidah, et al.
Published: (2008)
Soft computing approach for solving elevator scheduling problem
by: Norzatul Hajar, Abd Majid
Published: (2010)
by: Norzatul Hajar, Abd Majid
Published: (2010)
Contractual challenges for BIM-based construction projects: a systematic review
by: Ahmad Huzaimi, Abd Jamil, et al.
Published: (2018)
by: Ahmad Huzaimi, Abd Jamil, et al.
Published: (2018)
Planning & scheduling for construction project: a case study of duration estimation & influence factors
by: Nor Hashimah, Mohd Fuzi
Published: (2014)
by: Nor Hashimah, Mohd Fuzi
Published: (2014)
Understanding Management Roles and Organisational Behaviours
in Planning and Scheduling Based on Construction Projects in
Oman
by: Nasseri , Hammad Al, et al.
Published: (2016)
by: Nasseri , Hammad Al, et al.
Published: (2016)
Systematic review of built environment attributes of walkability: cases of Malaysia
by: Demdoum, Khair Eddine, et al.
Published: (2024)
by: Demdoum, Khair Eddine, et al.
Published: (2024)
Automated pavement imaging program (APIP) for pavement cracks classification and quantification
by: Che Puan, Othman, et al.
Published: (2007)
by: Che Puan, Othman, et al.
Published: (2007)
Application of digital photogrammetry to quantification of road surface distresses
by: Mustaffar, Mushairry, et al.
Published: (2004)
by: Mustaffar, Mushairry, et al.
Published: (2004)
Investing for Impact: Constructing a Better Built Environment
by: Hampson, Keith D., et al.
Published: (2013)
by: Hampson, Keith D., et al.
Published: (2013)
A systematic review of the Project Management Information Systems in different types of construction projects
by: Haloul, Mohamed Ibrahim Khalifa, et al.
Published: (2024)
by: Haloul, Mohamed Ibrahim Khalifa, et al.
Published: (2024)
Critical Factors and Mitigating Measures of Construction Delays of Pakistani Building Construction Projects
by: Irfanullah, Irfanullah, et al.
Published: (2023)
by: Irfanullah, Irfanullah, et al.
Published: (2023)
Modelling the knowledge management processes for planning and scheduling of construction projects based on state-of-the-art technology
by: Bahtiar, Siti Fazreena Idayu
Published: (2012)
by: Bahtiar, Siti Fazreena Idayu
Published: (2012)
Flexible Scheduling For Construction Project Using Fuzzy Logic Method And Critical Path Method (CPM)
by: Voon, Sze Nee
Published: (2017)
by: Voon, Sze Nee
Published: (2017)
Stochastic Project Scheduling with Hierarchical Alternatives
by: Tao, S., et al.
Published: (2018)
by: Tao, S., et al.
Published: (2018)
Scheduling Large Project Into Work Packages
by: Mohamad Nor, Norazman
Published: (1994)
by: Mohamad Nor, Norazman
Published: (1994)
Lean Construction: An Effective Approach for Project Management
by: Ansah, Richard Hannis, et al.
Published: (2016)
by: Ansah, Richard Hannis, et al.
Published: (2016)
Impact of unplanned schedule compression on project cost
by: Mansur, Shaiful Amri, et al.
Published: (2006)
by: Mansur, Shaiful Amri, et al.
Published: (2006)
Several 9MP projects behind schedule
Published: (2008)
Published: (2008)
Four infrastructure projects in Sarawak behind schedule
by: The Borneo Post
Published: (2016)
by: The Borneo Post
Published: (2016)
Cost estimation performance in the Construction Projects: A systematic review and future directions.
by: Mohammad Waffy, Fazil, et al.
Published: (2021)
by: Mohammad Waffy, Fazil, et al.
Published: (2021)
Cost Estimation Performance in the Construction Projects: A Systematic Review and Future Directions
by: Mohammad Waffy, Fazil, et al.
Published: (2021)
by: Mohammad Waffy, Fazil, et al.
Published: (2021)
Knowledge management (KM) framework for the Malaysian construction consultant companies
by: Md. Rasli, Amran, et al.
Published: (2006)
by: Md. Rasli, Amran, et al.
Published: (2006)
Similar Items
-
A systematic approach for monitoring and evaluating the construction project progress
by: Memon, Zubair Ahmed, et al.
Published: (2006) -
A systematic procedure for developing the 3D model to evaluate the construction project progress
by: Ahmed Memon, Zubair, et al.
Published: (2007) -
The use of photogrammetry techniques to evaluate the construction project progress
by: Ahmed Memon, Zubair, et al.
Published: (2006) -
Digitalizing Construction Monitoring (DCM): an overview of Malaysian construction industry and proposing prototype software
by: Ahmed Memon, Zubair, et al.
Published: (2006) -
An approach to joint roughness measurement in Rock-A comparative study
by: Mohd. Amin, Mohd. For, et al.
Published: (2001)