APA (7th ed.) Citation

Shahar,, M. S., & Mohd Salleh, N. A. (2018). Cycle time improvement by lean Six Sigma for the Cutting Tool Production Line / Muhammad Syahmi Shahar and Noor Azlina Mohd Salleh. Faculty of Mechanical Engineering Universiti Teknologi MARA (UiTM).

Chicago Style (17th ed.) Citation

Shahar,, Muhammad Syahmi, and Noor Azlina Mohd Salleh. Cycle Time Improvement by Lean Six Sigma for the Cutting Tool Production Line / Muhammad Syahmi Shahar and Noor Azlina Mohd Salleh. Faculty of Mechanical Engineering Universiti Teknologi MARA (UiTM), 2018.

MLA (9th ed.) Citation

Shahar,, Muhammad Syahmi, and Noor Azlina Mohd Salleh. Cycle Time Improvement by Lean Six Sigma for the Cutting Tool Production Line / Muhammad Syahmi Shahar and Noor Azlina Mohd Salleh. Faculty of Mechanical Engineering Universiti Teknologi MARA (UiTM), 2018.

Warning: These citations may not always be 100% accurate.