A case study on the improvement of productivity and efficiency of a quality control line for a cutting tool manufacturer / Muhammad Farhan Mohd Suhaimi and Noor Azlina Mohd Salleh

A case study conducted at a quality control line of a cutting tool manufacturer in Malaysia aimed to improve the line balancing and maximise the productivity. Line Balancing (LB) plays an important role to enhance the productivity and efficiency of a production line. Current situation at the line is...

Full description

Bibliographic Details
Main Authors: Mohd Suhaimi, Muhammad Farhan, Mohd Salleh, Noor Azlina
Format: Article
Language:English
Published: Faculty of Mechanical Engineering Universiti Teknologi MARA (UiTM) 2018
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/36312/
_version_ 1848809017951911936
author Mohd Suhaimi, Muhammad Farhan
Mohd Salleh, Noor Azlina
author_facet Mohd Suhaimi, Muhammad Farhan
Mohd Salleh, Noor Azlina
author_sort Mohd Suhaimi, Muhammad Farhan
building UiTM Institutional Repository
collection Online Access
description A case study conducted at a quality control line of a cutting tool manufacturer in Malaysia aimed to improve the line balancing and maximise the productivity. Line Balancing (LB) plays an important role to enhance the productivity and efficiency of a production line. Current situation at the line is considered very critical since the operator exhibits high tendency to skip a few procedures while performing the inspection processes. It is due to the manpower shortfall in the line that overwhelmed the operator to meet an irrelevant required target output from the line. This situation resulted in some customer complaints on the company’s product. In order to overcome the problem, observations and time study using the stopwatch technique had been conducted to identify the flaw concerning the workload at the quality control line. Then, from the data obtained, LB is introduced into the quality control line. The data collected are then analysed by using the takt time calculation, Yamazumi Chart and a new layout of the quality control line are designed and proposed. Apart from that, a pre-filled check sheet acts as a Lean Manufacturing (LM) approach named Poka-Yoke is also introduced with regard to eliminate a few wastes existed in the line. As a result, the productivity and efficiency of the quality control line recorded an increment up to 9.73% and 89.94% respectively. With the aid of this study, it is greatly help the company to establish a better monitoring system to thoroughly Muhammad Farhan Mohd Suhaimi & Noor Azlina Mohd Salleh utilise the resources especially in terms of time and manpower needed for the line.
first_indexed 2025-11-14T23:07:56Z
format Article
id uitm-36312
institution Universiti Teknologi MARA
institution_category Local University
language English
last_indexed 2025-11-14T23:07:56Z
publishDate 2018
publisher Faculty of Mechanical Engineering Universiti Teknologi MARA (UiTM)
recordtype eprints
repository_type Digital Repository
spelling uitm-363122020-11-09T03:34:26Z https://ir.uitm.edu.my/id/eprint/36312/ A case study on the improvement of productivity and efficiency of a quality control line for a cutting tool manufacturer / Muhammad Farhan Mohd Suhaimi and Noor Azlina Mohd Salleh jmeche Mohd Suhaimi, Muhammad Farhan Mohd Salleh, Noor Azlina TJ Mechanical engineering and machinery A case study conducted at a quality control line of a cutting tool manufacturer in Malaysia aimed to improve the line balancing and maximise the productivity. Line Balancing (LB) plays an important role to enhance the productivity and efficiency of a production line. Current situation at the line is considered very critical since the operator exhibits high tendency to skip a few procedures while performing the inspection processes. It is due to the manpower shortfall in the line that overwhelmed the operator to meet an irrelevant required target output from the line. This situation resulted in some customer complaints on the company’s product. In order to overcome the problem, observations and time study using the stopwatch technique had been conducted to identify the flaw concerning the workload at the quality control line. Then, from the data obtained, LB is introduced into the quality control line. The data collected are then analysed by using the takt time calculation, Yamazumi Chart and a new layout of the quality control line are designed and proposed. Apart from that, a pre-filled check sheet acts as a Lean Manufacturing (LM) approach named Poka-Yoke is also introduced with regard to eliminate a few wastes existed in the line. As a result, the productivity and efficiency of the quality control line recorded an increment up to 9.73% and 89.94% respectively. With the aid of this study, it is greatly help the company to establish a better monitoring system to thoroughly Muhammad Farhan Mohd Suhaimi & Noor Azlina Mohd Salleh utilise the resources especially in terms of time and manpower needed for the line. Faculty of Mechanical Engineering Universiti Teknologi MARA (UiTM) 2018 Article PeerReviewed text en https://ir.uitm.edu.my/id/eprint/36312/1/36312.pdf Mohd Suhaimi, Muhammad Farhan and Mohd Salleh, Noor Azlina (2018) A case study on the improvement of productivity and efficiency of a quality control line for a cutting tool manufacturer / Muhammad Farhan Mohd Suhaimi and Noor Azlina Mohd Salleh. (2018) Journal of Mechanical Engineering (JMechE) <https://ir.uitm.edu.my/view/publication/Journal_of_Mechanical_Engineering_=28JMechE=29.html>, 15 (1). pp. 222-239. ISSN 1823-5514 ; 2550-164X https://jmeche.uitm.edu.my/
spellingShingle TJ Mechanical engineering and machinery
Mohd Suhaimi, Muhammad Farhan
Mohd Salleh, Noor Azlina
A case study on the improvement of productivity and efficiency of a quality control line for a cutting tool manufacturer / Muhammad Farhan Mohd Suhaimi and Noor Azlina Mohd Salleh
title A case study on the improvement of productivity and efficiency of a quality control line for a cutting tool manufacturer / Muhammad Farhan Mohd Suhaimi and Noor Azlina Mohd Salleh
title_full A case study on the improvement of productivity and efficiency of a quality control line for a cutting tool manufacturer / Muhammad Farhan Mohd Suhaimi and Noor Azlina Mohd Salleh
title_fullStr A case study on the improvement of productivity and efficiency of a quality control line for a cutting tool manufacturer / Muhammad Farhan Mohd Suhaimi and Noor Azlina Mohd Salleh
title_full_unstemmed A case study on the improvement of productivity and efficiency of a quality control line for a cutting tool manufacturer / Muhammad Farhan Mohd Suhaimi and Noor Azlina Mohd Salleh
title_short A case study on the improvement of productivity and efficiency of a quality control line for a cutting tool manufacturer / Muhammad Farhan Mohd Suhaimi and Noor Azlina Mohd Salleh
title_sort case study on the improvement of productivity and efficiency of a quality control line for a cutting tool manufacturer / muhammad farhan mohd suhaimi and noor azlina mohd salleh
topic TJ Mechanical engineering and machinery
url https://ir.uitm.edu.my/id/eprint/36312/
https://ir.uitm.edu.my/id/eprint/36312/