Approval of work / Muhammad Ariff Imran Ruzlan

The report contains statements about the method of construction work. Basis for Management Development Air Pahang Berhad for the new office. Topics represented in this report is very important for job approval. The method in this report for the purpose of making it the supervisor reports to underst...

Full description

Bibliographic Details
Main Author: Muhammad Ariff Imran, Ruzlan
Format: Student Project
Language:English
Published: 2017
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/34589/
_version_ 1848808591399583744
author Muhammad Ariff Imran, Ruzlan
author_facet Muhammad Ariff Imran, Ruzlan
author_sort Muhammad Ariff Imran, Ruzlan
building UiTM Institutional Repository
collection Online Access
description The report contains statements about the method of construction work. Basis for Management Development Air Pahang Berhad for the new office. Topics represented in this report is very important for job approval. The method in this report for the purpose of making it the supervisor reports to understand the progress of work flow method which starts up the finishing work. In addition, there are figures, drawings, attachments that are collected from the company are included in the report. This content contains information for the project and have the information that will be tasked to ensure the success of the project. It also has a scope of work that has been assigned to implement the project. There is some information on the approval form work and also the procedure for implementation of construction works on site. Any reference to the implementation of the work will be referred by government departments like Majlis Daerah Bera, Jabatan Kerja Raya (JKR), Tenaga Nasional Berhad (TNB), Jabatan Bomba & Penyelamat Malaysia (Fire & Rescue Department of Malaysia) For the implementation of the work will have some requirement such as Quality Planning (QP), Quality Assurance (QA) and Quality Control (QC) so that the procedure can be carried out properly. There is a method statement for checked and tested by the Enforcement Officer to validate these methods. The process also works in the body to facilitate the work on site. Some descriptions have been made to describe the work of the observation during practical training. Some of the problems and possible solutions have been created to facilitate the work on the next site.
first_indexed 2025-11-14T23:01:09Z
format Student Project
id uitm-34589
institution Universiti Teknologi MARA
institution_category Local University
language English
last_indexed 2025-11-14T23:01:09Z
publishDate 2017
recordtype eprints
repository_type Digital Repository
spelling uitm-345892020-09-24T08:33:38Z https://ir.uitm.edu.my/id/eprint/34589/ Approval of work / Muhammad Ariff Imran Ruzlan Muhammad Ariff Imran, Ruzlan Buildings: Construction with reference to use.Including public buildings, dwellings Estimates. Measurements. Quantities and cost Management of the construction site. Superintendence of building construction Construction by phase of the work (Building trades) The report contains statements about the method of construction work. Basis for Management Development Air Pahang Berhad for the new office. Topics represented in this report is very important for job approval. The method in this report for the purpose of making it the supervisor reports to understand the progress of work flow method which starts up the finishing work. In addition, there are figures, drawings, attachments that are collected from the company are included in the report. This content contains information for the project and have the information that will be tasked to ensure the success of the project. It also has a scope of work that has been assigned to implement the project. There is some information on the approval form work and also the procedure for implementation of construction works on site. Any reference to the implementation of the work will be referred by government departments like Majlis Daerah Bera, Jabatan Kerja Raya (JKR), Tenaga Nasional Berhad (TNB), Jabatan Bomba & Penyelamat Malaysia (Fire & Rescue Department of Malaysia) For the implementation of the work will have some requirement such as Quality Planning (QP), Quality Assurance (QA) and Quality Control (QC) so that the procedure can be carried out properly. There is a method statement for checked and tested by the Enforcement Officer to validate these methods. The process also works in the body to facilitate the work on site. Some descriptions have been made to describe the work of the observation during practical training. Some of the problems and possible solutions have been created to facilitate the work on the next site. 2017 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/34589/1/34589.pdf Muhammad Ariff Imran, Ruzlan (2017) Approval of work / Muhammad Ariff Imran Ruzlan. (2017) [Student Project] (Unpublished)
spellingShingle Buildings: Construction with reference to use.Including public buildings, dwellings
Estimates. Measurements. Quantities and cost
Management of the construction site. Superintendence of building construction
Construction by phase of the work (Building trades)
Muhammad Ariff Imran, Ruzlan
Approval of work / Muhammad Ariff Imran Ruzlan
title Approval of work / Muhammad Ariff Imran Ruzlan
title_full Approval of work / Muhammad Ariff Imran Ruzlan
title_fullStr Approval of work / Muhammad Ariff Imran Ruzlan
title_full_unstemmed Approval of work / Muhammad Ariff Imran Ruzlan
title_short Approval of work / Muhammad Ariff Imran Ruzlan
title_sort approval of work / muhammad ariff imran ruzlan
topic Buildings: Construction with reference to use.Including public buildings, dwellings
Estimates. Measurements. Quantities and cost
Management of the construction site. Superintendence of building construction
Construction by phase of the work (Building trades)
url https://ir.uitm.edu.my/id/eprint/34589/