A case study of chilled water air-conditioning system in UiTM Penang / Md Zainizam Ngadiman

Many office buildings in Malaysia including Universiti Teknologi MARA (UiTM) Penang were installed with the air-conditioning system to provide comfort for the occupants. The examples of air-conditioning types system used were a split unit, chiller system and many more. In UiTM Penang, chiller system...

Full description

Bibliographic Details
Main Author: Ngadiman, Md Zainizam
Format: Thesis
Language:English
Published: 2019
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/33766/
_version_ 1848808370005344256
author Ngadiman, Md Zainizam
author_facet Ngadiman, Md Zainizam
author_sort Ngadiman, Md Zainizam
building UiTM Institutional Repository
collection Online Access
description Many office buildings in Malaysia including Universiti Teknologi MARA (UiTM) Penang were installed with the air-conditioning system to provide comfort for the occupants. The examples of air-conditioning types system used were a split unit, chiller system and many more. In UiTM Penang, chiller system that has a capacity of 2100 refrigerant tonnage is used to cool the building such as Faculty of Mechanical Engineering (FKM). The recommended degrees for thermal comfort zone are between 23°C to 25°C. However, in some areas in FKM building, there is an air-conditioning problem where comfort zone cannot be achieved. Thus, the purpose of the study is to investigate the heat loss and head loss for chilled water piping between the chiller plant and AHU room. Besides that, the total cooling capacity is calculated and compared to the installed air-conditioning. Most of the air-conditioning system installed in the building has complied with the design requirement, but the result shows that most of the chilled water temperature produced is high and not achieved to set point setting in the chiller system which is 7.5°C. The water supply pressure from the chiller plant maintained at 6.3 bar for each day. The heat loss occurred in chiller plant is acceptable because lower than design requirement which is 8.3°C. The head loss in the chiller plant is maintained on 2.3bar. The average heat loss between the chiller plant and AHU room is 1.25°C while the head loss is 1.3bar. There are three options proposed to improve the air-conditioning system in the FKM building. The selected option is to install a new chiller system near to FKM building with the new piping layout but using the existing AHU/FCU.
first_indexed 2025-11-14T22:57:38Z
format Thesis
id uitm-33766
institution Universiti Teknologi MARA
institution_category Local University
language English
last_indexed 2025-11-14T22:57:38Z
publishDate 2019
recordtype eprints
repository_type Digital Repository
spelling uitm-337662020-10-13T01:55:05Z https://ir.uitm.edu.my/id/eprint/33766/ A case study of chilled water air-conditioning system in UiTM Penang / Md Zainizam Ngadiman Ngadiman, Md Zainizam Engineering machinery, tools, and implements Materials of engineering and construction Many office buildings in Malaysia including Universiti Teknologi MARA (UiTM) Penang were installed with the air-conditioning system to provide comfort for the occupants. The examples of air-conditioning types system used were a split unit, chiller system and many more. In UiTM Penang, chiller system that has a capacity of 2100 refrigerant tonnage is used to cool the building such as Faculty of Mechanical Engineering (FKM). The recommended degrees for thermal comfort zone are between 23°C to 25°C. However, in some areas in FKM building, there is an air-conditioning problem where comfort zone cannot be achieved. Thus, the purpose of the study is to investigate the heat loss and head loss for chilled water piping between the chiller plant and AHU room. Besides that, the total cooling capacity is calculated and compared to the installed air-conditioning. Most of the air-conditioning system installed in the building has complied with the design requirement, but the result shows that most of the chilled water temperature produced is high and not achieved to set point setting in the chiller system which is 7.5°C. The water supply pressure from the chiller plant maintained at 6.3 bar for each day. The heat loss occurred in chiller plant is acceptable because lower than design requirement which is 8.3°C. The head loss in the chiller plant is maintained on 2.3bar. The average heat loss between the chiller plant and AHU room is 1.25°C while the head loss is 1.3bar. There are three options proposed to improve the air-conditioning system in the FKM building. The selected option is to install a new chiller system near to FKM building with the new piping layout but using the existing AHU/FCU. 2019 Thesis NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/33766/1/33766.pdf Ngadiman, Md Zainizam (2019) A case study of chilled water air-conditioning system in UiTM Penang / Md Zainizam Ngadiman. (2019) Degree thesis, thesis, Universiti Teknologi MARA Shah Alam.
spellingShingle Engineering machinery, tools, and implements
Materials of engineering and construction
Ngadiman, Md Zainizam
A case study of chilled water air-conditioning system in UiTM Penang / Md Zainizam Ngadiman
title A case study of chilled water air-conditioning system in UiTM Penang / Md Zainizam Ngadiman
title_full A case study of chilled water air-conditioning system in UiTM Penang / Md Zainizam Ngadiman
title_fullStr A case study of chilled water air-conditioning system in UiTM Penang / Md Zainizam Ngadiman
title_full_unstemmed A case study of chilled water air-conditioning system in UiTM Penang / Md Zainizam Ngadiman
title_short A case study of chilled water air-conditioning system in UiTM Penang / Md Zainizam Ngadiman
title_sort case study of chilled water air-conditioning system in uitm penang / md zainizam ngadiman
topic Engineering machinery, tools, and implements
Materials of engineering and construction
url https://ir.uitm.edu.my/id/eprint/33766/