Bangunan Sultan Idris Shah, JAIS / Muhammad Amir Farhan Zulkafli ... [et al.]
This project report entitled to “Integrated Final Project” with a case study, Bangunan Sultan Idris Shah. The aim of this assignment is to learn the maintenance management of an existing building which is Bangunan Sultan Idris Shah. The study includes cleaning services, building elements, infrastruc...
| Main Authors: | Muhammad Amir Farhan, Zulkafli, Muhammad Syaril Ikhwan, Shafie, Fatin Nadhirah, Hilmi, Nur Ainin Sofiya, Rasnol’Aided, Nurul Najah, Nasrul |
|---|---|
| Format: | Student Project |
| Language: | English |
| Published: |
2019
|
| Subjects: | |
| Online Access: | https://ir.uitm.edu.my/id/eprint/33681/ |
Similar Items
Menara KPJ Healthcare, Jalan Tun Razak, Kuala Lumpur / Muhammad Zul Farhan Muhammad Zulkifli ... [et al.]
by: Muhammad Zul Farhan, Muhammad Zulkifli, et al.
Published: (2019)
by: Muhammad Zul Farhan, Muhammad Zulkifli, et al.
Published: (2019)
Menara Persekutuan Melaka / Muhammad Taqiyuddin Iqbal ... [et al.]
by: Muhammad Taqiyuddin, Iqbal, et al.
Published: (2019)
by: Muhammad Taqiyuddin, Iqbal, et al.
Published: (2019)
Selangor Public Library Corporation (PPAS) – Raja Tun Uda Library / Nursyafiqah Jamaludin ... [et al.]
by: Nursyafiqah, Jamaludin, et al.
Published: (2019)
by: Nursyafiqah, Jamaludin, et al.
Published: (2019)
A study on key success of contractors under Enem Corporation Sdn Bhd / Awatif Saari
by: Saari, Awatif
Published: (2010)
by: Saari, Awatif
Published: (2010)
Menara Yayasan Selangor / Muhammad Shaiful Nezam Lokman ... [et al.]
by: Muhammad Shaiful Nezam, Lokman, et al.
Published: (2019)
by: Muhammad Shaiful Nezam, Lokman, et al.
Published: (2019)
German-Malaysian Insitute (GMI) / Hafizatul Huda Huzailing ... [et al.]
by: Hafizatul Huda, Huzailing, et al.
Published: (2019)
by: Hafizatul Huda, Huzailing, et al.
Published: (2019)
The Pinnacle Sunway, Subang / Muhammad Hafizuddin ... [et al.]
by: Muhammad Hafizuddin, Azmi, et al.
Published: (2019)
by: Muhammad Hafizuddin, Azmi, et al.
Published: (2019)
Bangunan RISDA, KM 7 Jalan Ampang, Karung Berkunci 11067 50990 Kuala Lumpur / Amalin Nur Fazirah Zairi ... [et al.]
by: Amalin Nur Fazirah, Zairi, et al.
Published: (2019)
by: Amalin Nur Fazirah, Zairi, et al.
Published: (2019)
Bangunan Lembaga Hasil Dalam Negeri, Kompleks Kerajaan Jalan Tuanku Abdul Halim, 50600 Kuala Lumpur / Nurdiana Ellysha Azman ... [et al.]
by: Nurdiana Ellysha, Azman, et al.
Published: (2019)
by: Nurdiana Ellysha, Azman, et al.
Published: (2019)
Menara UEM Edgenta Berhad / Nurfarahanim Nazri ... [et al.]
by: Nurfarahanim, Nazri, et al.
Published: (2019)
by: Nurfarahanim, Nazri, et al.
Published: (2019)
Pertubuhan Arkitek Malaysia (PAM) Centre / Muhammad Akmal Sugeng Triwahyono ... [et al.]
by: Muhammad Akmal, Sugeng Triwahyono, et al.
Published: (2019)
by: Muhammad Akmal, Sugeng Triwahyono, et al.
Published: (2019)
Tabung Haji Perdana, Kuala Lumpur / Erfa Rauhah Shahril Anuar ... [et al.]
by: Erfa Rauhah, Shahril Anuar, et al.
Published: (2019)
by: Erfa Rauhah, Shahril Anuar, et al.
Published: (2019)
Lembaga Getah Malaysia (LGM) / Siti Nur Ain Ramly ... [et al.]
by: Siti Nur Ain, Ramly, et al.
Published: (2019)
by: Siti Nur Ain, Ramly, et al.
Published: (2019)
Dewan Bandaraya Kuala Lumpur (DBKL 1) / Mohammad Hariz Mohd Yunus ... [et al.]
by: Mohammad Hariz, Mohd Yunus, et al.
Published: (2019)
by: Mohammad Hariz, Mohd Yunus, et al.
Published: (2019)
Menara AmFirst, Petaling Jaya / Mohd aizat Aizani Yusof ... [et al.]
by: Mohd aizat, Aizani Yusof, et al.
Published: (2019)
by: Mohd aizat, Aizani Yusof, et al.
Published: (2019)
TEKUN Nasional HQ / Zairul Azri Zuhairi ... [et al.]
by: Zairul Azri, Zuhairi, et al.
Published: (2019)
by: Zairul Azri, Zuhairi, et al.
Published: (2019)
Menara Kerja Raya (MKR) / Qyu Ray Joseph Suleiman ... [et al.]
by: Qyu Ray, Joseph Suleiman, et al.
Published: (2019)
by: Qyu Ray, Joseph Suleiman, et al.
Published: (2019)
Wisma Sime Darby / Ahmad Dhiyauddin Ahmad Khair ... [et al.]
by: Ahmad Dhiyauddin, Ahmad Khair, et al.
Published: (2019)
by: Ahmad Dhiyauddin, Ahmad Khair, et al.
Published: (2019)
Menara Tabung Haji Platinum, KLCC Kuala Lumpur / Hamzah Faris Hilmi Habri ... [et al.]
by: Hamzah Faris Hilmi, Habri, et al.
Published: (2019)
by: Hamzah Faris Hilmi, Habri, et al.
Published: (2019)
KDU University College, Utropolis, Glenmarie / Muhamad Azim Mohd Fadzer ... [et al.]
by: Muhamad Azim, Mohd Fadzer, et al.
Published: (2019)
by: Muhamad Azim, Mohd Fadzer, et al.
Published: (2019)
Rock blasting practices in Malaysian quarry industries / Muhammad Farhan Zulkifli
by: Zulkifli, Muhammad Farhan
Published: (2009)
by: Zulkifli, Muhammad Farhan
Published: (2009)
Risk on design and build for construction project faced by developer / Muhammad Syakirin Ismail
by: Ismail, Muhammad Syakirin
Published: (2003)
by: Ismail, Muhammad Syakirin
Published: (2003)
A study on the performance of composite slab using metal deck from maintenance aspect / Norhidayah Othman
by: Othman, Norhidayah
Published: (2009)
by: Othman, Norhidayah
Published: (2009)
A study on construction waste management (renovation work) / Muhammad Taufiq Ramlam
by: Ramlam, Muhammad Taufiq
Published: (2009)
by: Ramlam, Muhammad Taufiq
Published: (2009)
Penggunaan buruh langsung dan tidak langsung dalam penyelenggaraan bangunan institut pendidikan tinggi awam dan swasta kajian dari aspek perancangan penggunaan buruh dalam perlaksanaan kerja penyelenggaraan / Rasli Sudin
by: Sudin, Rasli
Published: (1999)
by: Sudin, Rasli
Published: (1999)
Faktor-faktor yang mempengaruhi nilai pasaran sewa rumah kedai dua tingkat di Shah Alam / Ramli Mohamed Amin
by: Mohamed Amin, Ramli
Published: (1996)
by: Mohamed Amin, Ramli
Published: (1996)
Maintenance management for construction plant / Mohd Hafiz Abd Khalib
by: Abd Khalib, Mohd Hafiz
Published: (2006)
by: Abd Khalib, Mohd Hafiz
Published: (2006)
Relationship between refurbishment project complexity and energy efficiency design performance through the mediating design team attributes / Siti Nor Azniza Ahmad Sekak
by: Ahmad Sekak, Siti Nor Azniza
Published: (2017)
by: Ahmad Sekak, Siti Nor Azniza
Published: (2017)
Investigation on robotic gas metal arc welding quality for specific ship panel structure / Mohammad Ridzwan Abdul Rahim
by: Abdul Rahim, Mohammad Ridzwan
Published: (2014)
by: Abdul Rahim, Mohammad Ridzwan
Published: (2014)
Pengurusan bahan binaan di tapak bina / Rosdi Hassan
by: Hassan, Rosdi
Published: (2009)
by: Hassan, Rosdi
Published: (2009)
The implementation of corporate social responsibilities (CSR) among G7 contractors in Malaysia / Hamimah Adnan ...[et al.]
by: Adnan, Hamimah, et al.
Published: (2019)
by: Adnan, Hamimah, et al.
Published: (2019)
Identification of common problems faced by the Bumiputera contractors / Ad. Johan Abdullah
by: Abdullah, Ad.Johan
Published: (2006)
by: Abdullah, Ad.Johan
Published: (2006)
Effectiveness intelligent building in Malaysian construction industry / Sabariah Sareh Saad
by: Saad, Sabariah Sareh
Published: (2008)
by: Saad, Sabariah Sareh
Published: (2008)
Pentadbiran dan pengurusan pembinaan oleh kontraktor menurut perspektif Islam / Fadzleen Syaheeda Mohd Shukri
by: Mohd Shukri, Fadzleen Syaheeda
Published: (2002)
by: Mohd Shukri, Fadzleen Syaheeda
Published: (2002)
The employment of foreign workers in maintenance industry / Nor Syizwani Jamawi
by: Jamawi, Nor Syizwani
Published: (2009)
by: Jamawi, Nor Syizwani
Published: (2009)
Leadership style in maintenance management / Norhayati Suid
by: Suid, Norhayati
Published: (2009)
by: Suid, Norhayati
Published: (2009)
Construction manager's (CMs) skills and project performance / Irewolede Ijaola and Olabode Ogunsanmi.
by: Ijaola, Irewolede, et al.
Published: (2018)
by: Ijaola, Irewolede, et al.
Published: (2018)
Proposed upgrading work for existing public toilet at Coliseum Car Park Plaza, Jalan Tuanku Abdul Rahman, Kuala Lumpur for MESSRS Dewan Bandaraya Kuala Lumpur (DBKL) / Hasni Mohd Noor
by: Mohd Noor, Hasni
Published: (2005)
by: Mohd Noor, Hasni
Published: (2005)
Penilaian tahap keberkesanan program publisiti dalam penyediaan draf rancangan tempatan daerah Temerloh, Maran, dan Jerantut Pahang / Norshahidayah Sulaiman dan Zurina Mohd Sadali
by: Sulaiman, Norshahidayah, et al.
Published: (2011)
by: Sulaiman, Norshahidayah, et al.
Published: (2011)
Improvement of constructability guidelines for design phase in highway project / Siti Hafizan Hassan, Nadira Ahzahar and Hazrina Ahmad
by: Hassan, Siti Hafizan, et al.
Published: (2009)
by: Hassan, Siti Hafizan, et al.
Published: (2009)
Similar Items
-
Menara KPJ Healthcare, Jalan Tun Razak, Kuala Lumpur / Muhammad Zul Farhan Muhammad Zulkifli ... [et al.]
by: Muhammad Zul Farhan, Muhammad Zulkifli, et al.
Published: (2019) -
Menara Persekutuan Melaka / Muhammad Taqiyuddin Iqbal ... [et al.]
by: Muhammad Taqiyuddin, Iqbal, et al.
Published: (2019) -
Selangor Public Library Corporation (PPAS) – Raja Tun Uda Library / Nursyafiqah Jamaludin ... [et al.]
by: Nursyafiqah, Jamaludin, et al.
Published: (2019) -
A study on key success of contractors under Enem Corporation Sdn Bhd / Awatif Saari
by: Saari, Awatif
Published: (2010) -
Menara Yayasan Selangor / Muhammad Shaiful Nezam Lokman ... [et al.]
by: Muhammad Shaiful Nezam, Lokman, et al.
Published: (2019)