Risk management plan (RMP) : implementation and challenges towards sustainability and green concept for public projects in Terengganu / Yuhainis Abdul Talib, Siti Nirwana Mat Usof and Kharizam Ismail
Risk management become be the most significant and integral part of project management. The construction project may fail or succeed, depending on the adopted risk management approach. As risk management is predicting the unpredictable, it is one of the most vital management tools to cope with proj...
| Main Authors: | Yuhainis, Abdul Talib, Siti Nirwana, Mat Usof, Kharizam, Ismail |
|---|---|
| Format: | Conference or Workshop Item |
| Language: | English |
| Published: |
2015
|
| Subjects: | |
| Online Access: | https://ir.uitm.edu.my/id/eprint/33228/ |
Similar Items
A study on inventory system in UiTM Shah Alam (main campus) / Nor Khalilah Rosli
by: Rosli, Nor Khalilah
Published: (2009)
by: Rosli, Nor Khalilah
Published: (2009)
Rock blasting practices in Malaysian quarry industries / Muhammad Farhan Zulkifli
by: Zulkifli, Muhammad Farhan
Published: (2009)
by: Zulkifli, Muhammad Farhan
Published: (2009)
Menara Sunway / Ahmad Izzulhafiz Musalakmal ... [et al.]
by: Ahmad Izzulhafiz, Musalakmal, et al.
Published: (2019)
by: Ahmad Izzulhafiz, Musalakmal, et al.
Published: (2019)
Repair and maintenance works for low cost housing : issues and solution to promote sustainable housing concept / Yuhainis Abdul Talib, Amirul Helmi Abdul Malik and Siti Norsazlina Haron
by: Yuhainis, Abdul Talib, et al.
Published: (2015)
by: Yuhainis, Abdul Talib, et al.
Published: (2015)
Effect of building orientation on indoor microclimate of classroom buildings at the Kaduna State University / Markus Bulus.
by: Bulus, Markus
Published: (2018)
by: Bulus, Markus
Published: (2018)
A study on strategies of Sarawak Consolidated Industries Berhad (SCIB) to achieve competitive advantages in industrialised building system (IBS) industries in Kuching /
Abu Bakar Ahmat and Rosalina Suai
by: Ahmat, Abu Bakar, et al.
Published: (2014)
by: Ahmat, Abu Bakar, et al.
Published: (2014)
Penyediaan tempat letak kereta di Flat Taman Beringin, Jinjang Utara, Kuala Lumpur / Muhammad Hafizudin Roszai
by: Roszai, Muhammad Hafizudin
Published: (2013)
by: Roszai, Muhammad Hafizudin
Published: (2013)
Energy efficiency principle of tranditional Malay house / Nor 'Atikah Zainuddin
by: Zainuddin, Nor Atikah
Published: (2015)
by: Zainuddin, Nor Atikah
Published: (2015)
The effectiveness of ready mixed concrete / Norazman Shahabudin
by: Shahabudin, Norazman
Published: (2005)
by: Shahabudin, Norazman
Published: (2005)
Garis panduan proses dalam meluluskan perletakan stesen minyak. Kajian kes : Bangsar / Ahmad Johari Hj Zakry
by: Ahmad Johari, Hj Zakry
Published: (1993)
by: Ahmad Johari, Hj Zakry
Published: (1993)
The identification of facilities management standard service category for industry / Zuraihana Ahmad Zawawi ... [et al.]
by: Zuraihana, Ahmad Zawawi, et al.
Published: (2016)
by: Zuraihana, Ahmad Zawawi, et al.
Published: (2016)
Late and non-payments issues in the Malaysian construction industry : perspective of building material suppliers / Mohd Fisal Ishak, Kartina Alauddin and Mohd Shahrol Hafiz Ibrahim
by: Mohd Fisal, Ishak, et al.
Published: (2019)
by: Mohd Fisal, Ishak, et al.
Published: (2019)
Expressions and stylistic trends of homeowners in terrace housing / Masran Saruwono, Abdurrahman Mohd Rashid and Erdayu Os’hara Omar.
by: Saruwono, Masran, et al.
Published: (2018)
by: Saruwono, Masran, et al.
Published: (2018)
A comparison studies on financial implication in managing residential property (in-house vs. outsourcing) / Nur Atiqah Ab Rahman
by: Ab Rahman, Nur Atiqah
Published: (2010)
by: Ab Rahman, Nur Atiqah
Published: (2010)
Assessing health and safety practice for refurbishment work at Klang Valley / Muhammad Muzakkir Ismail
by: Ismail, Muhammad Muzakkir
Published: (2015)
by: Ismail, Muhammad Muzakkir
Published: (2015)
An integrated value management (IVM)
framework for contractors in design and
build (D&B) projects / Siti Hamidah Abdul Hamid
by: Abdul Hamid, Siti Hamidah
Published: (2014)
by: Abdul Hamid, Siti Hamidah
Published: (2014)
Administrative reform of Majlis Bandaraya Melaka Bersejarah in term of parking service / Amira Zainura Zainal Abidin and Mohd Khairul Insan Nazri
by: Zainal Abidin, Amira Zainura, et al.
Published: (2008)
by: Zainal Abidin, Amira Zainura, et al.
Published: (2008)
Approval of work / Muhammad Ariff Imran Ruzlan
by: Muhammad Ariff Imran, Ruzlan
Published: (2017)
by: Muhammad Ariff Imran, Ruzlan
Published: (2017)
Adapting by altering: spatial modifications of terraced houses in the Klang Valley area / Erdayu Os’hara Omar, Esmawee Endut and Masran Saruwono
by: Omar, Erdayu Os’hara, et al.
Published: (2017)
by: Omar, Erdayu Os’hara, et al.
Published: (2017)
A study of building plan approval for extension and renovation work (individual application) / Ahmad Faisal Mohd Isa
by: Mohd Isa, Ahmad Faisal
Published: (2008)
by: Mohd Isa, Ahmad Faisal
Published: (2008)
The applicability of disabled access and facilities at bus terminals in Klang Valley / Nur Hasliana Hassan
by: Hassan, Nur Hasliana
Published: (2015)
by: Hassan, Nur Hasliana
Published: (2015)
Study of construction and maintenance of slope in Klang Valley highway / Nadzren Ahayalimudin
by: Ahayalimudin, Nadzren
Published: (2009)
by: Ahayalimudin, Nadzren
Published: (2009)
A study on space and facilities management in public school (special education integration program in Klang Valley) / Siti Aishah Maseroo
by: Maseroo, Siti Aishah
Published: (2011)
by: Maseroo, Siti Aishah
Published: (2011)
A study on the user perception of the safety aspect at the extreme park / Nor Farah Aida Mohamed Zeble
by: Mohamed Zeble, Nor Farah Aida
Published: (2015)
by: Mohamed Zeble, Nor Farah Aida
Published: (2015)
Pengurusan bahan binaan di tapak bina / Rosdi Hassan
by: Hassan, Rosdi
Published: (2009)
by: Hassan, Rosdi
Published: (2009)
TH Selbon Tower, Kuala Lumpur / Andrea Daling ... [et al.]
by: Andrea, Daling, et al.
Published: (2019)
by: Andrea, Daling, et al.
Published: (2019)
Penggunaan buruh langsung dan tidak langsung dalam penyelenggaraan bangunan institut pendidikan tinggi awam dan swasta kajian dari aspek perancangan penggunaan buruh dalam perlaksanaan kerja penyelenggaraan / Rasli Sudin
by: Sudin, Rasli
Published: (1999)
by: Sudin, Rasli
Published: (1999)
Faktor-faktor yang mempengaruhi nilai pasaran sewa rumah kedai dua tingkat di Shah Alam / Ramli Mohamed Amin
by: Mohamed Amin, Ramli
Published: (1996)
by: Mohamed Amin, Ramli
Published: (1996)
Maintenance management for construction plant / Mohd Hafiz Abd Khalib
by: Abd Khalib, Mohd Hafiz
Published: (2006)
by: Abd Khalib, Mohd Hafiz
Published: (2006)
Relationship between refurbishment project complexity and energy efficiency design performance through the mediating design team attributes / Siti Nor Azniza Ahmad Sekak
by: Ahmad Sekak, Siti Nor Azniza
Published: (2017)
by: Ahmad Sekak, Siti Nor Azniza
Published: (2017)
A study on construction waste management (renovation work) / Muhammad Taufiq Ramlam
by: Ramlam, Muhammad Taufiq
Published: (2009)
by: Ramlam, Muhammad Taufiq
Published: (2009)
Investigation on robotic gas metal arc welding quality for specific ship panel structure / Mohammad Ridzwan Abdul Rahim
by: Abdul Rahim, Mohammad Ridzwan
Published: (2014)
by: Abdul Rahim, Mohammad Ridzwan
Published: (2014)
A study on key success of contractors under Enem Corporation Sdn Bhd / Awatif Saari
by: Saari, Awatif
Published: (2010)
by: Saari, Awatif
Published: (2010)
The importance of dilapidation survey before the commencement of construction work in Malaysia / Nurul Afiqah Mohammad Batni
by: Mohammad Batni, Nurul Afiqah
Published: (2015)
by: Mohammad Batni, Nurul Afiqah
Published: (2015)
The influence of dwelling design on the performance of indoor ventilation / Siti Suhaila Mohd Hashim
by: Mohd Hashim, Siti Suhaila
Published: (2015)
by: Mohd Hashim, Siti Suhaila
Published: (2015)
Proposed upgrading work for existing public toilet at Coliseum Car Park Plaza, Jalan Tuanku Abdul Rahman, Kuala Lumpur for MESSRS Dewan Bandaraya Kuala Lumpur (DBKL) / Hasni Mohd Noor
by: Mohd Noor, Hasni
Published: (2005)
by: Mohd Noor, Hasni
Published: (2005)
Laporan cadangan mengubahsuai rekabentuk dalaman untuk UMW Toyota Motor Sdn Bhd di Lot 4798, Jalan Kuala Kangsar, 30100 Ipoh, Perak / Ahmad Faizal Jaffar
by: Jaffar, Ahmad Faizal
Published: (2006)
by: Jaffar, Ahmad Faizal
Published: (2006)
A Review of property manager's competency in managing green building / Syamim Jaafar and Nor Aini Hj. Salleh
by: Syamim, Jaafar, et al.
Published: (2017)
by: Syamim, Jaafar, et al.
Published: (2017)
High-raised buildings in urban area contributes to the snatch theft incidents / Anith Nabilah Mustafa and Siti Rasidah Md Sakip
by: Anith Nabilah, Mustafa, et al.
Published: (2017)
by: Anith Nabilah, Mustafa, et al.
Published: (2017)
Identification of common problems faced by the Bumiputera contractors / Ad. Johan Abdullah
by: Abdullah, Ad.Johan
Published: (2006)
by: Abdullah, Ad.Johan
Published: (2006)
Similar Items
-
A study on inventory system in UiTM Shah Alam (main campus) / Nor Khalilah Rosli
by: Rosli, Nor Khalilah
Published: (2009) -
Rock blasting practices in Malaysian quarry industries / Muhammad Farhan Zulkifli
by: Zulkifli, Muhammad Farhan
Published: (2009) -
Menara Sunway / Ahmad Izzulhafiz Musalakmal ... [et al.]
by: Ahmad Izzulhafiz, Musalakmal, et al.
Published: (2019) -
Repair and maintenance works for low cost housing : issues and solution to promote sustainable housing concept / Yuhainis Abdul Talib, Amirul Helmi Abdul Malik and Siti Norsazlina Haron
by: Yuhainis, Abdul Talib, et al.
Published: (2015) -
Effect of building orientation on indoor microclimate of classroom buildings at the Kaduna State University / Markus Bulus.
by: Bulus, Markus
Published: (2018)