Modeling of traffic movements in Seberang Perai Utara, Penang, Malaysia using OmniTRANS / Muhamad Fairul Samsudin
Transportation planning uses the term 'models' broadly. This term is used to refer to a series of mathematical equations that are used to represent how choices are made when people travel. Travel demand occurs as a result of thousands of individual travelers making individual decisions on...
| Main Author: | Samsudin, Muhamad Fairul |
|---|---|
| Format: | Student Project |
| Language: | English |
| Published: |
2006
|
| Subjects: | |
| Online Access: | https://ir.uitm.edu.my/id/eprint/32432/ |
Similar Items
Implikasi pembinaan lebuhraya Utara-Selatan terhadap kawasan sekitar. Kes kajian : Rawang / Mohamad Ya'cub
by: Ya'cub, Mohamad
Published: (1996)
by: Ya'cub, Mohamad
Published: (1996)
Ground improvement constructions with particular reference to stone column (case study : electrified double track project between Rawang and Ipoh) / Masfarizan Maslan
by: Maslan, Masfarizan
Published: (2003)
by: Maslan, Masfarizan
Published: (2003)
Relationship between merging lane length and motorcyclist’s head check behavior during merging in
expressway
by: Ammar, Adnan, et al.
Published: (2018)
by: Ammar, Adnan, et al.
Published: (2018)
Effect of hatched marking length on entering position among motorcyclists during merging in expressway
by: Adnan, Ammar, et al.
Published: (2018)
by: Adnan, Ammar, et al.
Published: (2018)
Preliminary study on waste management for implementation of green highway / Asmalia Che Ahmad ... [et al.]
by: Asmalia, Che Ahmad, et al.
Published: (2015)
by: Asmalia, Che Ahmad, et al.
Published: (2015)
Blackspot analysis of road traffic crashes in Surabaya -
Manyar Toll Road, East Java
by: Hartatik, Nurani, et al.
Published: (2021)
by: Hartatik, Nurani, et al.
Published: (2021)
Estimation of the design elements of horizontal alignment by the method of least squares/Jalina Rabi
by: Rabi, Jalina
Published: (2006)
by: Rabi, Jalina
Published: (2006)
The effect of reclaimed asphalt pavement (RAP) proportion on strength properties of a full depth recycling pavement / Roziawati Razali
by: Razali, Roziawati
Published: (2010)
by: Razali, Roziawati
Published: (2010)
Carbon nanomaterials derived from Malaysia’s highway road asphalt waste as electrode for supercapacitor
by: Mohd Abid, Mohd Asyadi Azam, et al.
Published: (2018)
by: Mohd Abid, Mohd Asyadi Azam, et al.
Published: (2018)
Development Of Unsignalised Intersection Analysis Procedure For The Malaysian Highway Capacity Manual
[TE176. E73 2007 f rb].
by: Sanik, Mohd Erwan
Published: (2007)
by: Sanik, Mohd Erwan
Published: (2007)
Ciri laju-aliran jalan arteri : kajian kes di Butterworth, Pulau Pinang, Malaysia [TE175. S961 2005 f rb].
by: Haron, Suria
Published: (2005)
by: Haron, Suria
Published: (2005)
Penghasilan modul e-pembelajaran : "pembinaan jalan raya"
by: Othman, Asri
Published: (2003)
by: Othman, Asri
Published: (2003)
Causative factors of cost overrun in highway projects of Sindh province of Pakistan
by: Sohu, S, et al.
Published: (2017)
by: Sohu, S, et al.
Published: (2017)
Second Semester Examination 2018/2019 Academic Session
June 2019 EAL235 – Highway and Traffic Engineering
(Kejuruteraan Lebuh Raya dan Lalu Lintas) Duration: 2 hours (Masa: 2 jam)
by: Awam, Pusat pengajian Kejuruteraan
Published: (2019)
by: Awam, Pusat pengajian Kejuruteraan
Published: (2019)
Significant mitigation measures for critical factors of cost overrun in highway projects of Pakistan
by: Sohu, Samiullah, et al.
Published: (2018)
by: Sohu, Samiullah, et al.
Published: (2018)
UNIVERSITI SAINS MALAYSIA Second Semester Examination
2016/2017 Academic Session June 2017 EAL235 – Highway and Traffic Engineering [Kejuruteraan Lebuh Raya dan Lalu Lintas] Duration: 2 hours [Masa: 2 jam]
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2017)
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2017)
First Semester Examination Academic Session 2018/2019
December 2018/January 2019 EAL431 – Highway Design
(Reka Bentuk Lebuh Raya) Duration: 2 hours (Masa: 2 jam)
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2019)
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2019)
Commuters’ travel characteristics, modal choice and performance of public transport options in Lagos, Nigeria / Wale Alade, Mobolaji Olaseni and Olufemi Adeniji.
by: Alade, Wale, et al.
Published: (2019)
by: Alade, Wale, et al.
Published: (2019)
REG 463 - REKABENTUK JALAN DAN LABUH RAYA APRIL 1993.
by: PPPB, Pusat Pengajian Perumahan Dan Bangunan
Published: (1993)
by: PPPB, Pusat Pengajian Perumahan Dan Bangunan
Published: (1993)
UNIVERSITI SAINS MALAYSIA Second Semester Examination
2016/2017 Academic Session June 2017 EAL432 –Advanced Transportation and Highway Engineering [Kejuruteraan Lebuhraya dan Pengangkutan Lanjutan] Duration: 3 hours
[Masa: 3 jam]
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2017)
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2017)
A study on expressway merging and diverging traffic operation / Nurul Qastalani Radzuan
by: Radzuan, Nurul Qastalani
Published: (2015)
by: Radzuan, Nurul Qastalani
Published: (2015)
The evaluation of traffic operation based on travel time study
by: Guanning, Xu
Published: (2014)
by: Guanning, Xu
Published: (2014)
Pavement surface condition attributed to traffic operations on federal roadways in Kuantan
by: Rohanatasha, Rifin
Published: (2019)
by: Rohanatasha, Rifin
Published: (2019)
An evaluation of the safety and operational benefits of traffic signal coordination for an urban arterials in Kuching
by: Kuo, Hie Hung
Published: (2014)
by: Kuo, Hie Hung
Published: (2014)
The most important centrality measures in plus highway traffic network: an approach based on effective variance
by: Mohd Asrah, Norhaidah, et al.
Published: (2018)
by: Mohd Asrah, Norhaidah, et al.
Published: (2018)
Application of network traffic flow model to road maintenance
by: Yang, Chao, et al.
Published: (2015)
by: Yang, Chao, et al.
Published: (2015)
Case study: congestion at traffic signal of junction Jalan Bukit Ubi and Jalan Dato Lim Hoe Lek
by: Muhammad , Ali
Published: (2013)
by: Muhammad , Ali
Published: (2013)
Relationship between roadside features and road traffic accidents along KM 3 - KM 27 of Jalan Kuantan-Gambang
by: Marzida, Abdul Manaf
Published: (2010)
by: Marzida, Abdul Manaf
Published: (2010)
Guaranteeing Quality Of Service (QoS) For Variable Bit Rate (VBR) Traffic Over All Optical Burst-Switched WDM Network
by: Ali, Mohammed abdulatef
Published: (2008)
by: Ali, Mohammed abdulatef
Published: (2008)
Automated traffic counting data collection and analysis
by: Low, Anand Hong Ren
Published: (2021)
by: Low, Anand Hong Ren
Published: (2021)
EAL 235 HIGHWAY AND TRAFFIC ENGINEERING (JUN 2016)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2016)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2016)
Identiti kawasan Rehat dan Rawat (R&R) di lebuhraya Utara - Selatan (R&R Tapah, R&R Sungai Perak Dan R&R Gunung Semanggol, Perak Darul Ridzuan) / Nadiyanti Mat Nayan and Norhafizah Abdul Rahman
by: Mat Nayan, Nadiyanti, et al.
Published: (2006)
by: Mat Nayan, Nadiyanti, et al.
Published: (2006)
UMP, MBK collaborate in effective management of traffic and public transport systems
by: Mimi Rabita, Abdul Wahit
Published: (2022)
by: Mimi Rabita, Abdul Wahit
Published: (2022)
Malaysian road traffic crash data: Where do we stand now
by: Ahmad Noor Syukri, Zainal Abidin, et al.
Published: (2021)
by: Ahmad Noor Syukri, Zainal Abidin, et al.
Published: (2021)
Development Of Entrance Ramp Merging Density Model
Based On An Urban Expressway Traffic Condition.
by: Adnan, Muhammad Akram
Published: (2007)
by: Adnan, Muhammad Akram
Published: (2007)
Evaluation on the operational effects of U-turn movement
by: Siti Aisyah, Zakaria
Published: (2012)
by: Siti Aisyah, Zakaria
Published: (2012)
Determining the traffic safety management criteria in highway maintenance works from road users' perspective / Suhaila Ali, Nur'ain Ismail and Norakmarwati Ishak
by: Ali, Suhaila, et al.
Published: (2011)
by: Ali, Suhaila, et al.
Published: (2011)
Erosion Potential Of Rainfall In Seberang Perai Area
by: Mustakim, Norhisham
Published: (2005)
by: Mustakim, Norhisham
Published: (2005)
Improving pedestrian’s facilities management for the safety of road users in Universiti Utara Malaysia, Sintok, Kedah
by: Loh, Tong Cheng, et al.
Published: (2012)
by: Loh, Tong Cheng, et al.
Published: (2012)
The development of online checklist system for traffic impact assessment (e.C-TIA) report submission in Malaysia
by: Lim, Wei May
Published: (2020)
by: Lim, Wei May
Published: (2020)
Similar Items
-
Implikasi pembinaan lebuhraya Utara-Selatan terhadap kawasan sekitar. Kes kajian : Rawang / Mohamad Ya'cub
by: Ya'cub, Mohamad
Published: (1996) -
Ground improvement constructions with particular reference to stone column (case study : electrified double track project between Rawang and Ipoh) / Masfarizan Maslan
by: Maslan, Masfarizan
Published: (2003) -
Relationship between merging lane length and motorcyclist’s head check behavior during merging in
expressway
by: Ammar, Adnan, et al.
Published: (2018) -
Effect of hatched marking length on entering position among motorcyclists during merging in expressway
by: Adnan, Ammar, et al.
Published: (2018) -
Preliminary study on waste management for implementation of green highway / Asmalia Che Ahmad ... [et al.]
by: Asmalia, Che Ahmad, et al.
Published: (2015)