Repair of major road embankment failure using reinforced earth (re) wall

A case history of repair works of major road embankment failure along Genting Highlands to Bukit Cincin, Pahang is presented. Failures at 10 locations along Genting Highlands to Bukit Cincin road occurred on 30th October 1997 during the monsoon seasons. The repair works at Location 1 using reinforce...

Full description

Bibliographic Details
Main Authors: Jamalludin, Damanhuri, Ahmad, Mohd Farid, Mohd Salleh, Samsuri, Md. Issa, Ahmad Kamal
Format: Article
Language:English
Published: Universiti Teknologi MARA, Perlis 2010
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/31819/
_version_ 1848807859373998080
author Jamalludin, Damanhuri
Ahmad, Mohd Farid
Mohd Salleh, Samsuri
Md. Issa, Ahmad Kamal
author_facet Jamalludin, Damanhuri
Ahmad, Mohd Farid
Mohd Salleh, Samsuri
Md. Issa, Ahmad Kamal
author_sort Jamalludin, Damanhuri
building UiTM Institutional Repository
collection Online Access
description A case history of repair works of major road embankment failure along Genting Highlands to Bukit Cincin, Pahang is presented. Failures at 10 locations along Genting Highlands to Bukit Cincin road occurred on 30th October 1997 during the monsoon seasons. The repair works at Location 1 using reinforced earth wall was considered since there was enough space available at the downslope section and also the soil at the downslope section of the failed embankment was strong enough to construct the wall safely. This paper fully explained the details remedial works using reinforced earth wall at Location 1.
first_indexed 2025-11-14T22:49:31Z
format Article
id uitm-31819
institution Universiti Teknologi MARA
institution_category Local University
language English
last_indexed 2025-11-14T22:49:31Z
publishDate 2010
publisher Universiti Teknologi MARA, Perlis
recordtype eprints
repository_type Digital Repository
spelling uitm-318192020-07-06T02:47:02Z https://ir.uitm.edu.my/id/eprint/31819/ Repair of major road embankment failure using reinforced earth (re) wall jurnalintelek Jamalludin, Damanhuri Ahmad, Mohd Farid Mohd Salleh, Samsuri Md. Issa, Ahmad Kamal Roads Construction details. Including foundations, maintenance, equipment A case history of repair works of major road embankment failure along Genting Highlands to Bukit Cincin, Pahang is presented. Failures at 10 locations along Genting Highlands to Bukit Cincin road occurred on 30th October 1997 during the monsoon seasons. The repair works at Location 1 using reinforced earth wall was considered since there was enough space available at the downslope section and also the soil at the downslope section of the failed embankment was strong enough to construct the wall safely. This paper fully explained the details remedial works using reinforced earth wall at Location 1. Universiti Teknologi MARA, Perlis 2010-06 Article PeerReviewed text en https://ir.uitm.edu.my/id/eprint/31819/1/31819.pdf Jamalludin, Damanhuri and Ahmad, Mohd Farid and Mohd Salleh, Samsuri and Md. Issa, Ahmad Kamal (2010) Repair of major road embankment failure using reinforced earth (re) wall. (2010) Jurnal Intelek <https://ir.uitm.edu.my/view/publication/Jurnal_Intelek.html>, 5 (1). ISSN 2231-7716 https://jurnalintelek.uitm.edu.my/index.php/main
spellingShingle Roads
Construction details. Including foundations, maintenance, equipment
Jamalludin, Damanhuri
Ahmad, Mohd Farid
Mohd Salleh, Samsuri
Md. Issa, Ahmad Kamal
Repair of major road embankment failure using reinforced earth (re) wall
title Repair of major road embankment failure using reinforced earth (re) wall
title_full Repair of major road embankment failure using reinforced earth (re) wall
title_fullStr Repair of major road embankment failure using reinforced earth (re) wall
title_full_unstemmed Repair of major road embankment failure using reinforced earth (re) wall
title_short Repair of major road embankment failure using reinforced earth (re) wall
title_sort repair of major road embankment failure using reinforced earth (re) wall
topic Roads
Construction details. Including foundations, maintenance, equipment
url https://ir.uitm.edu.my/id/eprint/31819/
https://ir.uitm.edu.my/id/eprint/31819/