A study on repeated fractures of highway construction (Concentration on MRR2 Highway) / Noor Irzaidah Kamarudin

The purpose of this study is to know the reasons or causes behind the repeated pillar fractures on MRR2. Is it cracked because "hungry man's head" or because construction did not follow the standards. The Public Works Department (PWD) is the organization that responsible towards this...

Full description

Bibliographic Details
Main Author: Kamarudin, Noor Irzaidah
Format: Student Project
Language:English
Published: Faculty of Business and Management 2010
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/27549/
_version_ 1848806804081868800
author Kamarudin, Noor Irzaidah
author_facet Kamarudin, Noor Irzaidah
author_sort Kamarudin, Noor Irzaidah
building UiTM Institutional Repository
collection Online Access
description The purpose of this study is to know the reasons or causes behind the repeated pillar fractures on MRR2. Is it cracked because "hungry man's head" or because construction did not follow the standards. The Public Works Department (PWD) is the organization that responsible towards this issue. The disagreement between the Works Minister and PWD seem to stem from the question of which report to follow. After facing several disputes, the government of Malaysia then appointed British Halcrow Consultancy Ltd on 12 August, 2004 to study the cracks that have appeared on 31 of the32 crossbeams since 2000. Halcrow has found a rare phenomenon--the expansion of a chemical compound, ettringite, had caused serious cracks. The main cause of excessive cracking in the crosshead to the T-shaped pier is a deficiency in the design and the anchorage of the columns reinforced into the crosshead. There is also a deficiency in the design of the transverse reinforcement in the top of the crossheads to resist splitting forces between bearings.
first_indexed 2025-11-14T22:32:44Z
format Student Project
id uitm-27549
institution Universiti Teknologi MARA
institution_category Local University
language English
last_indexed 2025-11-14T22:32:44Z
publishDate 2010
publisher Faculty of Business and Management
recordtype eprints
repository_type Digital Repository
spelling uitm-275492020-06-09T08:52:36Z https://ir.uitm.edu.my/id/eprint/27549/ A study on repeated fractures of highway construction (Concentration on MRR2 Highway) / Noor Irzaidah Kamarudin Kamarudin, Noor Irzaidah HE Transportation and Communications Traffic engineering. Roads and highways. Streets The purpose of this study is to know the reasons or causes behind the repeated pillar fractures on MRR2. Is it cracked because "hungry man's head" or because construction did not follow the standards. The Public Works Department (PWD) is the organization that responsible towards this issue. The disagreement between the Works Minister and PWD seem to stem from the question of which report to follow. After facing several disputes, the government of Malaysia then appointed British Halcrow Consultancy Ltd on 12 August, 2004 to study the cracks that have appeared on 31 of the32 crossbeams since 2000. Halcrow has found a rare phenomenon--the expansion of a chemical compound, ettringite, had caused serious cracks. The main cause of excessive cracking in the crosshead to the T-shaped pier is a deficiency in the design and the anchorage of the columns reinforced into the crosshead. There is also a deficiency in the design of the transverse reinforcement in the top of the crossheads to resist splitting forces between bearings. Faculty of Business and Management 2010 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/27549/1/27549.pdf Kamarudin, Noor Irzaidah (2010) A study on repeated fractures of highway construction (Concentration on MRR2 Highway) / Noor Irzaidah Kamarudin. (2010) [Student Project] <http://terminalib.uitm.edu.my/27549.pdf> (Unpublished)
spellingShingle HE Transportation and Communications
Traffic engineering. Roads and highways. Streets
Kamarudin, Noor Irzaidah
A study on repeated fractures of highway construction (Concentration on MRR2 Highway) / Noor Irzaidah Kamarudin
title A study on repeated fractures of highway construction (Concentration on MRR2 Highway) / Noor Irzaidah Kamarudin
title_full A study on repeated fractures of highway construction (Concentration on MRR2 Highway) / Noor Irzaidah Kamarudin
title_fullStr A study on repeated fractures of highway construction (Concentration on MRR2 Highway) / Noor Irzaidah Kamarudin
title_full_unstemmed A study on repeated fractures of highway construction (Concentration on MRR2 Highway) / Noor Irzaidah Kamarudin
title_short A study on repeated fractures of highway construction (Concentration on MRR2 Highway) / Noor Irzaidah Kamarudin
title_sort study on repeated fractures of highway construction (concentration on mrr2 highway) / noor irzaidah kamarudin
topic HE Transportation and Communications
Traffic engineering. Roads and highways. Streets
url https://ir.uitm.edu.my/id/eprint/27549/