Feasibility studies on Teruntum Complex, Kuantan / Noor Kamisah Abu Bakar

The actual condition of Teruntum Complex, unfortunately shows a significant drawback of retailers, customers and thus contribute to maximum loss of profit, for the once popular shopping complex in Kuantan, Pahang. The needs to outlined the aspects of feasibility studies become the main intention of...

Full description

Bibliographic Details
Main Author: Abu Bakar, Noor Kamisah
Format: Thesis
Language:English
Published: 2001
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/26705/
_version_ 1848806583255957504
author Abu Bakar, Noor Kamisah
author_facet Abu Bakar, Noor Kamisah
author_sort Abu Bakar, Noor Kamisah
building UiTM Institutional Repository
collection Online Access
description The actual condition of Teruntum Complex, unfortunately shows a significant drawback of retailers, customers and thus contribute to maximum loss of profit, for the once popular shopping complex in Kuantan, Pahang. The needs to outlined the aspects of feasibility studies become the main intention of this dissertation, as clearly defined from the title of the dissertation “Feasibility Studies On Teruntum Complex, Kuantan”. Chapter 1 of this dissertation contains the introduction of this dissertation, including the objectives, issues, scopes and research method. Background studies will be featured in Chapter 2 which emphasise several background research as general review on the feasibility stua.es and shopping complex development in Malaysia. Aspects on market studies that emphasise the evaluation on the surrounding area of Kuantan is the main topic of Chapter 3. The aspects of the market studies include the study on the competitors, socio-economic and site potential, as well as other related aspects. Chapter 4 contains the aspects of feasibility studies on Teruntum Complex, which focus on the existing condition of this shopping complex, including all details on previous aims and future plans. Chapter 5 is a compilation of analysis and reviews based on the studies as reveal in Chapter 3 and Chapter 4; while Chapter 6 is the conclusion of the dissertation’s title and topic with additional section on recommendations.
first_indexed 2025-11-14T22:29:14Z
format Thesis
id uitm-26705
institution Universiti Teknologi MARA
institution_category Local University
language English
last_indexed 2025-11-14T22:29:14Z
publishDate 2001
recordtype eprints
repository_type Digital Repository
spelling uitm-267052022-12-20T03:00:35Z https://ir.uitm.edu.my/id/eprint/26705/ Feasibility studies on Teruntum Complex, Kuantan / Noor Kamisah Abu Bakar Abu Bakar, Noor Kamisah Estimates. Measurements. Quantities and cost Management of the construction site. Superintendence of building construction The actual condition of Teruntum Complex, unfortunately shows a significant drawback of retailers, customers and thus contribute to maximum loss of profit, for the once popular shopping complex in Kuantan, Pahang. The needs to outlined the aspects of feasibility studies become the main intention of this dissertation, as clearly defined from the title of the dissertation “Feasibility Studies On Teruntum Complex, Kuantan”. Chapter 1 of this dissertation contains the introduction of this dissertation, including the objectives, issues, scopes and research method. Background studies will be featured in Chapter 2 which emphasise several background research as general review on the feasibility stua.es and shopping complex development in Malaysia. Aspects on market studies that emphasise the evaluation on the surrounding area of Kuantan is the main topic of Chapter 3. The aspects of the market studies include the study on the competitors, socio-economic and site potential, as well as other related aspects. Chapter 4 contains the aspects of feasibility studies on Teruntum Complex, which focus on the existing condition of this shopping complex, including all details on previous aims and future plans. Chapter 5 is a compilation of analysis and reviews based on the studies as reveal in Chapter 3 and Chapter 4; while Chapter 6 is the conclusion of the dissertation’s title and topic with additional section on recommendations. 2001 Thesis NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/26705/2/26705.pdf Abu Bakar, Noor Kamisah (2001) Feasibility studies on Teruntum Complex, Kuantan / Noor Kamisah Abu Bakar. (2001) Degree thesis, thesis, Universiti Teknologi MARA (UiTM). <http://terminalib.uitm.edu.my/26705.pdf>
spellingShingle Estimates. Measurements. Quantities and cost
Management of the construction site. Superintendence of building construction
Abu Bakar, Noor Kamisah
Feasibility studies on Teruntum Complex, Kuantan / Noor Kamisah Abu Bakar
title Feasibility studies on Teruntum Complex, Kuantan / Noor Kamisah Abu Bakar
title_full Feasibility studies on Teruntum Complex, Kuantan / Noor Kamisah Abu Bakar
title_fullStr Feasibility studies on Teruntum Complex, Kuantan / Noor Kamisah Abu Bakar
title_full_unstemmed Feasibility studies on Teruntum Complex, Kuantan / Noor Kamisah Abu Bakar
title_short Feasibility studies on Teruntum Complex, Kuantan / Noor Kamisah Abu Bakar
title_sort feasibility studies on teruntum complex, kuantan / noor kamisah abu bakar
topic Estimates. Measurements. Quantities and cost
Management of the construction site. Superintendence of building construction
url https://ir.uitm.edu.my/id/eprint/26705/