Estimation of the design elements of horizontal alignment by the method of least squares/Jalina Rabi
Although the construction of highway takes place in three dimensional spaces, the procedures that govern their design have been developed within 3 separate sets of two dimensional relationship that represent the plan, profile, and cross-section view. The plan view encompasses the horizontal align...
| Main Author: | Rabi, Jalina |
|---|---|
| Format: | Student Project |
| Language: | English |
| Published: |
Faculty of Civil Engineering
2006
|
| Subjects: | |
| Online Access: | https://ir.uitm.edu.my/id/eprint/26408/ |
Similar Items
Modeling of traffic movements in Seberang Perai Utara, Penang, Malaysia using OmniTRANS / Muhamad Fairul Samsudin
by: Samsudin, Muhamad Fairul
Published: (2006)
by: Samsudin, Muhamad Fairul
Published: (2006)
The effect of reclaimed asphalt pavement (RAP) proportion on strength properties of a full depth recycling pavement / Roziawati Razali
by: Razali, Roziawati
Published: (2010)
by: Razali, Roziawati
Published: (2010)
Ground improvement constructions with particular reference to stone column (case study : electrified double track project between Rawang and Ipoh) / Masfarizan Maslan
by: Maslan, Masfarizan
Published: (2003)
by: Maslan, Masfarizan
Published: (2003)
Implikasi pembinaan lebuhraya Utara-Selatan terhadap kawasan sekitar. Kes kajian : Rawang / Mohamad Ya'cub
by: Ya'cub, Mohamad
Published: (1996)
by: Ya'cub, Mohamad
Published: (1996)
Relationship between merging lane length and motorcyclist’s head check behavior during merging in
expressway
by: Ammar, Adnan, et al.
Published: (2018)
by: Ammar, Adnan, et al.
Published: (2018)
Effect of hatched marking length on entering position among motorcyclists during merging in expressway
by: Adnan, Ammar, et al.
Published: (2018)
by: Adnan, Ammar, et al.
Published: (2018)
Significant mitigation measures for critical factors of cost overrun in highway projects of Pakistan
by: Sohu, Samiullah, et al.
Published: (2018)
by: Sohu, Samiullah, et al.
Published: (2018)
UNIVERSITI SAINS MALAYSIA Second Semester Examination
2016/2017 Academic Session June 2017 EAL235 – Highway and Traffic Engineering [Kejuruteraan Lebuh Raya dan Lalu Lintas] Duration: 2 hours [Masa: 2 jam]
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2017)
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2017)
First Semester Examination Academic Session 2018/2019
December 2018/January 2019 EAL431 – Highway Design
(Reka Bentuk Lebuh Raya) Duration: 2 hours (Masa: 2 jam)
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2019)
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2019)
Second Semester Examination 2018/2019 Academic Session
June 2019 EAL235 – Highway and Traffic Engineering
(Kejuruteraan Lebuh Raya dan Lalu Lintas) Duration: 2 hours (Masa: 2 jam)
by: Awam, Pusat pengajian Kejuruteraan
Published: (2019)
by: Awam, Pusat pengajian Kejuruteraan
Published: (2019)
Carbon nanomaterials derived from Malaysia’s highway road asphalt waste as electrode for supercapacitor
by: Mohd Abid, Mohd Asyadi Azam, et al.
Published: (2018)
by: Mohd Abid, Mohd Asyadi Azam, et al.
Published: (2018)
Development Of Unsignalised Intersection Analysis Procedure For The Malaysian Highway Capacity Manual
[TE176. E73 2007 f rb].
by: Sanik, Mohd Erwan
Published: (2007)
by: Sanik, Mohd Erwan
Published: (2007)
Ciri laju-aliran jalan arteri : kajian kes di Butterworth, Pulau Pinang, Malaysia [TE175. S961 2005 f rb].
by: Haron, Suria
Published: (2005)
by: Haron, Suria
Published: (2005)
Penghasilan modul e-pembelajaran : "pembinaan jalan raya"
by: Othman, Asri
Published: (2003)
by: Othman, Asri
Published: (2003)
Blackspot analysis of road traffic crashes in Surabaya -
Manyar Toll Road, East Java
by: Hartatik, Nurani, et al.
Published: (2021)
by: Hartatik, Nurani, et al.
Published: (2021)
Causative factors of cost overrun in highway projects of Sindh province of Pakistan
by: Sohu, S, et al.
Published: (2017)
by: Sohu, S, et al.
Published: (2017)
Preliminary study on waste management for implementation of green highway / Asmalia Che Ahmad ... [et al.]
by: Asmalia, Che Ahmad, et al.
Published: (2015)
by: Asmalia, Che Ahmad, et al.
Published: (2015)
An Investigation on Urban Circle Rail Transit: A Case Study on the Alignment of Mass Rapid Transit 3 (Circle Line)
by: A. A., Mohamed, et al.
Published: (2020)
by: A. A., Mohamed, et al.
Published: (2020)
Assessment ranking for green pavement material elements
by: W. N. A., Wan Azahar, et al.
Published: (2020)
by: W. N. A., Wan Azahar, et al.
Published: (2020)
Resilient modulus prediction of nano-silica modified porous asphalt using finite element analysis
by: Putra Jaya, Ramadhansyah, et al.
Published: (2021)
by: Putra Jaya, Ramadhansyah, et al.
Published: (2021)
Predication of nano-silica modified porous asphalt under dynamic creep by using finite element analysis
by: Al-Aidaros, A. Z., et al.
Published: (2021)
by: Al-Aidaros, A. Z., et al.
Published: (2021)
Pavement technology elements in green highway
by: Wan Azahar, Wan Nur Aifa, et al.
Published: (2015)
by: Wan Azahar, Wan Nur Aifa, et al.
Published: (2015)
Assessment framework for pavement material and technology elements in green highway index
by: Bujang, Mastura, et al.
Published: (2018)
by: Bujang, Mastura, et al.
Published: (2018)
Pavement material and technology elements in green highway rating systems-a conspectus
by: Bujang, Mastura, et al.
Published: (2014)
by: Bujang, Mastura, et al.
Published: (2014)
REG 463 - REKABENTUK JALAN DAN LABUH RAYA APRIL 1993.
by: PPPB, Pusat Pengajian Perumahan Dan Bangunan
Published: (1993)
by: PPPB, Pusat Pengajian Perumahan Dan Bangunan
Published: (1993)
Evaluation and improvement of accessibility to urban Rail Transit System in Klang Valley, Malaysia / Suhana Koting
by: Suhana, Koting
Published: (2017)
by: Suhana, Koting
Published: (2017)
Development of road and timber in Kelantan with special reference to the Pergau River Valley / Abdul Khalid Bin Aziz
by: Abdul Khalid, Aziz
Published: (1971)
by: Abdul Khalid, Aziz
Published: (1971)
Evaluating life cycle cost and performance comparison between cold in place recycling and reconstruction method
by: Wan Omar, Wan Imran, et al.
Published: (2014)
by: Wan Omar, Wan Imran, et al.
Published: (2014)
Guaranteeing Quality Of Service (QoS) For Variable Bit Rate (VBR) Traffic Over All Optical Burst-Switched WDM Network
by: Ali, Mohammed abdulatef
Published: (2008)
by: Ali, Mohammed abdulatef
Published: (2008)
Development of Pre-engineered Geomaterial for Use in Road Embankment and Retaining Structure Backfill
by: A. Naser Abdul Ghani,, et al.
Published: (2005)
by: A. Naser Abdul Ghani,, et al.
Published: (2005)
Identiti kawasan Rehat dan Rawat (R&R) di lebuhraya Utara - Selatan (R&R Tapah, R&R Sungai Perak Dan R&R Gunung Semanggol, Perak Darul Ridzuan) / Nadiyanti Mat Nayan and Norhafizah Abdul Rahman
by: Mat Nayan, Nadiyanti, et al.
Published: (2006)
by: Mat Nayan, Nadiyanti, et al.
Published: (2006)
Development of flexible pavement design tool based on Jabatan Kerja Raya (JKR)’s revised guideline/ Mohamad Irwan P. Harahap
by: Harahap, Mohamad Irwan P., et al.
Published: (2017)
by: Harahap, Mohamad Irwan P., et al.
Published: (2017)
A study on automated traction control system of an electrical golf car
by: Rahman, Mohammed Ataur, et al.
Published: (2011)
by: Rahman, Mohammed Ataur, et al.
Published: (2011)
Statistical analysis for removal of cadmium from aqueous solution at high pH
by: Kabbashi, Naseereldeen Ahmed, et al.
Published: (2011)
by: Kabbashi, Naseereldeen Ahmed, et al.
Published: (2011)
Relationship between short duration and daily rainfall data in Kuala Lumpur
by: Salleh, Md. Noor, et al.
Published: (2013)
by: Salleh, Md. Noor, et al.
Published: (2013)
Influence of Recycled High Density Polyethylene on the Conventional and Morphology Properties of Bitumen
by: Wan Mohd Nazmi, Wan Abdul Rahman, et al.
Published: (2011)
by: Wan Mohd Nazmi, Wan Abdul Rahman, et al.
Published: (2011)
The evaluation on the performances of a roundabout at Taman Tas, Kuantan
by: Khairun Nadrah, Hamidzon
Published: (2012)
by: Khairun Nadrah, Hamidzon
Published: (2012)
aintenance management consideration in highway operation case study : east coast expressway
by: Nur Aqlili Naqqiah, Mokhtar
Published: (2012)
by: Nur Aqlili Naqqiah, Mokhtar
Published: (2012)
Analysis the performance of signalized intersection by using sidra
by: Ahmad Faiz, Nasir
Published: (2012)
by: Ahmad Faiz, Nasir
Published: (2012)
Projection on pavement life time for FR 222 access road to Gambang toll
by: Amrina, Abu Bakar
Published: (2012)
by: Amrina, Abu Bakar
Published: (2012)
Similar Items
-
Modeling of traffic movements in Seberang Perai Utara, Penang, Malaysia using OmniTRANS / Muhamad Fairul Samsudin
by: Samsudin, Muhamad Fairul
Published: (2006) -
The effect of reclaimed asphalt pavement (RAP) proportion on strength properties of a full depth recycling pavement / Roziawati Razali
by: Razali, Roziawati
Published: (2010) -
Ground improvement constructions with particular reference to stone column (case study : electrified double track project between Rawang and Ipoh) / Masfarizan Maslan
by: Maslan, Masfarizan
Published: (2003) -
Implikasi pembinaan lebuhraya Utara-Selatan terhadap kawasan sekitar. Kes kajian : Rawang / Mohamad Ya'cub
by: Ya'cub, Mohamad
Published: (1996) -
Relationship between merging lane length and motorcyclist’s head check behavior during merging in
expressway
by: Ammar, Adnan, et al.
Published: (2018)