Factors that contributes to the on-time delivery performance of Hicom Diecasting Sdn Bhd, Shah Alam / Nursyahida Rosli

According to the topic chosen, on time delivery (OTD) is one of the key performance indicators (KPI) of the Hicom Diecasting, Shah Alam. Research objectives for this study undertaken are to identify the most frequent evaluations of dependent variables, to identify the ranking evaluation on the indep...

Full description

Bibliographic Details
Main Author: Rosli, Nursyahida
Format: Student Project
Language:English
Published: Faculty of Business and Management 2010
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/26352/
_version_ 1848806505078325248
author Rosli, Nursyahida
author_facet Rosli, Nursyahida
author_sort Rosli, Nursyahida
building UiTM Institutional Repository
collection Online Access
description According to the topic chosen, on time delivery (OTD) is one of the key performance indicators (KPI) of the Hicom Diecasting, Shah Alam. Research objectives for this study undertaken are to identify the most frequent evaluations of dependent variables, to identify the ranking evaluation on the independent variables, identify the major contributors for of non-on time delivery and to recommend improvement or solutions in this research. The scope of the study is mainly focusing on the evaluation of implementation to reduce non-on the time delivery of production department, Hicom, Shah Alam. A set of questionnaires was distributed to the respective respondents. Several factors that being discussed in this research are demographic, 4M elements that contribute to the performance of on time delivery which are Manpower, Material, Machine and Method. The data is analyzed using descriptive analysis, frequency, and coefficients of Statistical Package for Social Sciences (SPSS).
first_indexed 2025-11-14T22:27:59Z
format Student Project
id uitm-26352
institution Universiti Teknologi MARA
institution_category Local University
language English
last_indexed 2025-11-14T22:27:59Z
publishDate 2010
publisher Faculty of Business and Management
recordtype eprints
repository_type Digital Repository
spelling uitm-263522020-03-28T05:20:23Z https://ir.uitm.edu.my/id/eprint/26352/ Factors that contributes to the on-time delivery performance of Hicom Diecasting Sdn Bhd, Shah Alam / Nursyahida Rosli Rosli, Nursyahida Theory. Method. Relation to other subjects. Performance Time management. Scheduling According to the topic chosen, on time delivery (OTD) is one of the key performance indicators (KPI) of the Hicom Diecasting, Shah Alam. Research objectives for this study undertaken are to identify the most frequent evaluations of dependent variables, to identify the ranking evaluation on the independent variables, identify the major contributors for of non-on time delivery and to recommend improvement or solutions in this research. The scope of the study is mainly focusing on the evaluation of implementation to reduce non-on the time delivery of production department, Hicom, Shah Alam. A set of questionnaires was distributed to the respective respondents. Several factors that being discussed in this research are demographic, 4M elements that contribute to the performance of on time delivery which are Manpower, Material, Machine and Method. The data is analyzed using descriptive analysis, frequency, and coefficients of Statistical Package for Social Sciences (SPSS). Faculty of Business and Management 2010 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/26352/1/PPb_NURSYAHIDA%20ROSLI%20BM%20M%2010_5.pdf Rosli, Nursyahida (2010) Factors that contributes to the on-time delivery performance of Hicom Diecasting Sdn Bhd, Shah Alam / Nursyahida Rosli. (2010) [Student Project] <http://terminalib.uitm.edu.my/26352.pdf> (Unpublished)
spellingShingle Theory. Method. Relation to other subjects. Performance
Time management. Scheduling
Rosli, Nursyahida
Factors that contributes to the on-time delivery performance of Hicom Diecasting Sdn Bhd, Shah Alam / Nursyahida Rosli
title Factors that contributes to the on-time delivery performance of Hicom Diecasting Sdn Bhd, Shah Alam / Nursyahida Rosli
title_full Factors that contributes to the on-time delivery performance of Hicom Diecasting Sdn Bhd, Shah Alam / Nursyahida Rosli
title_fullStr Factors that contributes to the on-time delivery performance of Hicom Diecasting Sdn Bhd, Shah Alam / Nursyahida Rosli
title_full_unstemmed Factors that contributes to the on-time delivery performance of Hicom Diecasting Sdn Bhd, Shah Alam / Nursyahida Rosli
title_short Factors that contributes to the on-time delivery performance of Hicom Diecasting Sdn Bhd, Shah Alam / Nursyahida Rosli
title_sort factors that contributes to the on-time delivery performance of hicom diecasting sdn bhd, shah alam / nursyahida rosli
topic Theory. Method. Relation to other subjects. Performance
Time management. Scheduling
url https://ir.uitm.edu.my/id/eprint/26352/