Work study in factory (cable slack making operation) / Mohd Nazlizan Ibrahim, Norhissham Abdul Hamid and Wan Nazrul Faizal Wan Mohamad
Work study is the systematic analysis of all facets of a job with the objective of arranging it so that maximum efficiency is obtained from labor, plant, equipment, materials and supervision. It achieves this by detailed examination and recording of all the various aspects of the job so that all rel...
| Main Authors: | , , |
|---|---|
| Format: | Student Project |
| Language: | English |
| Published: |
Faculty of Mechanical Engineering
2002
|
| Subjects: | |
| Online Access: | https://ir.uitm.edu.my/id/eprint/26052/ |
| _version_ | 1848806426581925888 |
|---|---|
| author | Ibrahim, Mohd Nazlizan Abdul Hamid, Norhissham Wan Mohamad, Wan Nazrul Faizal |
| author_facet | Ibrahim, Mohd Nazlizan Abdul Hamid, Norhissham Wan Mohamad, Wan Nazrul Faizal |
| author_sort | Ibrahim, Mohd Nazlizan |
| building | UiTM Institutional Repository |
| collection | Online Access |
| description | Work study is the systematic analysis of all facets of a job with the objective of arranging it so that maximum efficiency is obtained from labor, plant, equipment, materials and supervision. It achieves this by detailed examination and recording of all the various aspects of the job so that all relevant information will be brought to light and presented to management to enable them to make the right decisions instead of using intuitive guess work. The human aspect is the most important part of work-study, both on site and at higher management level and the subject consist just as much of human relations as it does of techniques. |
| first_indexed | 2025-11-14T22:26:44Z |
| format | Student Project |
| id | uitm-26052 |
| institution | Universiti Teknologi MARA |
| institution_category | Local University |
| language | English |
| last_indexed | 2025-11-14T22:26:44Z |
| publishDate | 2002 |
| publisher | Faculty of Mechanical Engineering |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | uitm-260522019-10-09T00:54:51Z https://ir.uitm.edu.my/id/eprint/26052/ Work study in factory (cable slack making operation) / Mohd Nazlizan Ibrahim, Norhissham Abdul Hamid and Wan Nazrul Faizal Wan Mohamad Ibrahim, Mohd Nazlizan Abdul Hamid, Norhissham Wan Mohamad, Wan Nazrul Faizal Mechanical devices and figures. Automata. Ingenious mechanisms.Robots (General) Work study is the systematic analysis of all facets of a job with the objective of arranging it so that maximum efficiency is obtained from labor, plant, equipment, materials and supervision. It achieves this by detailed examination and recording of all the various aspects of the job so that all relevant information will be brought to light and presented to management to enable them to make the right decisions instead of using intuitive guess work. The human aspect is the most important part of work-study, both on site and at higher management level and the subject consist just as much of human relations as it does of techniques. Faculty of Mechanical Engineering 2002 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/26052/1/PPd_MOHD%20NAZLIZAN%20IBRAHIM%20EM%2002_5.pdf Ibrahim, Mohd Nazlizan and Abdul Hamid, Norhissham and Wan Mohamad, Wan Nazrul Faizal (2002) Work study in factory (cable slack making operation) / Mohd Nazlizan Ibrahim, Norhissham Abdul Hamid and Wan Nazrul Faizal Wan Mohamad. (2002) [Student Project] <http://terminalib.uitm.edu.my/26052.pdf> (Unpublished) |
| spellingShingle | Mechanical devices and figures. Automata. Ingenious mechanisms.Robots (General) Ibrahim, Mohd Nazlizan Abdul Hamid, Norhissham Wan Mohamad, Wan Nazrul Faizal Work study in factory (cable slack making operation) / Mohd Nazlizan Ibrahim, Norhissham Abdul Hamid and Wan Nazrul Faizal Wan Mohamad |
| title | Work study in factory (cable slack making operation) / Mohd Nazlizan Ibrahim, Norhissham Abdul Hamid and Wan Nazrul Faizal Wan Mohamad |
| title_full | Work study in factory (cable slack making operation) / Mohd Nazlizan Ibrahim, Norhissham Abdul Hamid and Wan Nazrul Faizal Wan Mohamad |
| title_fullStr | Work study in factory (cable slack making operation) / Mohd Nazlizan Ibrahim, Norhissham Abdul Hamid and Wan Nazrul Faizal Wan Mohamad |
| title_full_unstemmed | Work study in factory (cable slack making operation) / Mohd Nazlizan Ibrahim, Norhissham Abdul Hamid and Wan Nazrul Faizal Wan Mohamad |
| title_short | Work study in factory (cable slack making operation) / Mohd Nazlizan Ibrahim, Norhissham Abdul Hamid and Wan Nazrul Faizal Wan Mohamad |
| title_sort | work study in factory (cable slack making operation) / mohd nazlizan ibrahim, norhissham abdul hamid and wan nazrul faizal wan mohamad |
| topic | Mechanical devices and figures. Automata. Ingenious mechanisms.Robots (General) |
| url | https://ir.uitm.edu.my/id/eprint/26052/ |