An investigation on the type of refurbishment works in UiTM Shah Alam / Mohd Hanif Awang

The transformation ITM becomes to be UITM there are many thing are to be transform especially transform on that building. The refurbishments are carried out in transformation of ITM become UITM but at the same time there are problem occur from the refurbishment work. The study has a specific objecti...

Full description

Bibliographic Details
Main Author: Awang, Mohd Hanif
Format: Student Project
Language:English
Published: Faculty of Architecture, Planning and Surveying 2010
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/25786/
_version_ 1848806353912463360
author Awang, Mohd Hanif
author_facet Awang, Mohd Hanif
author_sort Awang, Mohd Hanif
building UiTM Institutional Repository
collection Online Access
description The transformation ITM becomes to be UITM there are many thing are to be transform especially transform on that building. The refurbishments are carried out in transformation of ITM become UITM but at the same time there are problem occur from the refurbishment work. The study has a specific objective to achieve in the end. The primary of objective is to identify the type of refurbishment work carried out in UITM Shah Alam from years 2001 to 2009. Second objective to categorize type of refurbishment carried out in UITM Shah Alam from years 2001 to 2009 and the third objectives is to evaluate the performance of refurbishment work to meet the user needs. This dissertation include the outline of introduction and to the subject each topic, this dissertation also include the statistic type of refurbishment carried out in UITM Shah Alam and also the category type of refurbishment divided by two which is classification by uses and classification by work. Research methodology which had been applied in the six case studies is through observation, and interview involved person in refurbishment work. The analyses of questionnaire are to define in this dissertation to ensure the level of safety and quality of refurbishment work are carried out in UITM Shah Alam. Finally, conclusion from the research finding and the recommendation are be made in the last chapter to improve the performance of refurbishment work to meet the user need.
first_indexed 2025-11-14T22:25:35Z
format Student Project
id uitm-25786
institution Universiti Teknologi MARA
institution_category Local University
language English
last_indexed 2025-11-14T22:25:35Z
publishDate 2010
publisher Faculty of Architecture, Planning and Surveying
recordtype eprints
repository_type Digital Repository
spelling uitm-257862019-09-25T07:43:11Z https://ir.uitm.edu.my/id/eprint/25786/ An investigation on the type of refurbishment works in UiTM Shah Alam / Mohd Hanif Awang Awang, Mohd Hanif Systems of building construction. Industrialized building Maintenance and repair The transformation ITM becomes to be UITM there are many thing are to be transform especially transform on that building. The refurbishments are carried out in transformation of ITM become UITM but at the same time there are problem occur from the refurbishment work. The study has a specific objective to achieve in the end. The primary of objective is to identify the type of refurbishment work carried out in UITM Shah Alam from years 2001 to 2009. Second objective to categorize type of refurbishment carried out in UITM Shah Alam from years 2001 to 2009 and the third objectives is to evaluate the performance of refurbishment work to meet the user needs. This dissertation include the outline of introduction and to the subject each topic, this dissertation also include the statistic type of refurbishment carried out in UITM Shah Alam and also the category type of refurbishment divided by two which is classification by uses and classification by work. Research methodology which had been applied in the six case studies is through observation, and interview involved person in refurbishment work. The analyses of questionnaire are to define in this dissertation to ensure the level of safety and quality of refurbishment work are carried out in UITM Shah Alam. Finally, conclusion from the research finding and the recommendation are be made in the last chapter to improve the performance of refurbishment work to meet the user need. Faculty of Architecture, Planning and Surveying 2010 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/25786/1/PPb_MOHD%20HANIF%20AWANG%20AP%2010_5.pdf Awang, Mohd Hanif (2010) An investigation on the type of refurbishment works in UiTM Shah Alam / Mohd Hanif Awang. (2010) [Student Project] <http://terminalib.uitm.edu.my/25786.pdf> (Unpublished)
spellingShingle Systems of building construction. Industrialized building
Maintenance and repair
Awang, Mohd Hanif
An investigation on the type of refurbishment works in UiTM Shah Alam / Mohd Hanif Awang
title An investigation on the type of refurbishment works in UiTM Shah Alam / Mohd Hanif Awang
title_full An investigation on the type of refurbishment works in UiTM Shah Alam / Mohd Hanif Awang
title_fullStr An investigation on the type of refurbishment works in UiTM Shah Alam / Mohd Hanif Awang
title_full_unstemmed An investigation on the type of refurbishment works in UiTM Shah Alam / Mohd Hanif Awang
title_short An investigation on the type of refurbishment works in UiTM Shah Alam / Mohd Hanif Awang
title_sort investigation on the type of refurbishment works in uitm shah alam / mohd hanif awang
topic Systems of building construction. Industrialized building
Maintenance and repair
url https://ir.uitm.edu.my/id/eprint/25786/