A quality approach on pile installation method / Faried Mohd Noor

In Malaysia, the application of the pile is very broaden. However, there is a limited study on the quality requirement of the piling industry. Quality requirement of pile installation method are very important in order to provide a safety of the structure in future and to provide the effectivenes...

Full description

Bibliographic Details
Main Author: Mohd Noor, Faried
Format: Student Project
Language:English
Published: Faculty of Civil Engineering 2007
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/20971/
_version_ 1848805133142458368
author Mohd Noor, Faried
author_facet Mohd Noor, Faried
author_sort Mohd Noor, Faried
building UiTM Institutional Repository
collection Online Access
description In Malaysia, the application of the pile is very broaden. However, there is a limited study on the quality requirement of the piling industry. Quality requirement of pile installation method are very important in order to provide a safety of the structure in future and to provide the effectiveness performance of the pile. Toward the problem, this research will study on the type specifications of pile based on the type of the installation method such as driven piles, bored piles and jack-in piles. Further the study, the pile testing procedures also has been studied. Interviewing, site observation study, questionnaires and observation was selected as the methodologies method for this study. The site study will be planned to the site construction that involved with piling installation and pile testing performance in order to see the real work in construction industry. A set of questionnaire was distributed among the professional team such as contractor and consultant team. The results of the questionnaire and site observation have been identified in order to see the compliance activities based on the JKR specification. From the observation, the results of compliance are driven pile 87.41 %, maintained load test 97.64 % and pile driving analyzer 90.91 %. From the questionnaire, the results of compliance are driven pile 94.41 %, bored pile 63.63 %, jack-in pile 73.33 %, maintained load test 100.00 % and pile driving analyzer 52.74 %.
first_indexed 2025-11-14T22:06:11Z
format Student Project
id uitm-20971
institution Universiti Teknologi MARA
institution_category Local University
language English
last_indexed 2025-11-14T22:06:11Z
publishDate 2007
publisher Faculty of Civil Engineering
recordtype eprints
repository_type Digital Repository
spelling uitm-209712018-10-08T03:34:43Z https://ir.uitm.edu.my/id/eprint/20971/ A quality approach on pile installation method / Faried Mohd Noor Mohd Noor, Faried Structural engineering Earthwork. Foundations In Malaysia, the application of the pile is very broaden. However, there is a limited study on the quality requirement of the piling industry. Quality requirement of pile installation method are very important in order to provide a safety of the structure in future and to provide the effectiveness performance of the pile. Toward the problem, this research will study on the type specifications of pile based on the type of the installation method such as driven piles, bored piles and jack-in piles. Further the study, the pile testing procedures also has been studied. Interviewing, site observation study, questionnaires and observation was selected as the methodologies method for this study. The site study will be planned to the site construction that involved with piling installation and pile testing performance in order to see the real work in construction industry. A set of questionnaire was distributed among the professional team such as contractor and consultant team. The results of the questionnaire and site observation have been identified in order to see the compliance activities based on the JKR specification. From the observation, the results of compliance are driven pile 87.41 %, maintained load test 97.64 % and pile driving analyzer 90.91 %. From the questionnaire, the results of compliance are driven pile 94.41 %, bored pile 63.63 %, jack-in pile 73.33 %, maintained load test 100.00 % and pile driving analyzer 52.74 %. Faculty of Civil Engineering 2007-05-16 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/20971/1/PPb_FARIED%20MOHD%20NOOR%20EC%20P%2007_5.pdf Mohd Noor, Faried (2007) A quality approach on pile installation method / Faried Mohd Noor. (2007) [Student Project] (Submitted)
spellingShingle Structural engineering
Earthwork. Foundations
Mohd Noor, Faried
A quality approach on pile installation method / Faried Mohd Noor
title A quality approach on pile installation method / Faried Mohd Noor
title_full A quality approach on pile installation method / Faried Mohd Noor
title_fullStr A quality approach on pile installation method / Faried Mohd Noor
title_full_unstemmed A quality approach on pile installation method / Faried Mohd Noor
title_short A quality approach on pile installation method / Faried Mohd Noor
title_sort quality approach on pile installation method / faried mohd noor
topic Structural engineering
Earthwork. Foundations
url https://ir.uitm.edu.my/id/eprint/20971/