A procedural framework for extension of time (EoT) claim settlement in the Malaysian construction industry / Norazian Mohamad Yusuwan
The construction industry is often burdened by various problems associated with contractual claims that affect not only the administration and management of projects but also disrupt the smooth running of construction activities as well as contribute to the occurrence of disputes between the parties...
| Main Author: | Mohamad Yusuwan, Norazian |
|---|---|
| Format: | Book Section |
| Language: | English |
| Published: |
Institute of Graduate Studies, UiTM
2017
|
| Subjects: | |
| Online Access: | https://ir.uitm.edu.my/id/eprint/19792/ |
Similar Items
A procedural framework for extension of time (EoT) claim settlement in the Malaysian construction industry / Norazian Mohamad Yusuwan
by: Mohamad Yusuwan, Norazian
Published: (2016)
by: Mohamad Yusuwan, Norazian
Published: (2016)
Extension of time claim assessment in Malaysian construction industry: views from professionals / Norazian Mohamad Yusuwan and Hamimah Adnan.
by: Mohamad Yusuwan, Norazian, et al.
Published: (2018)
by: Mohamad Yusuwan, Norazian, et al.
Published: (2018)
Success factors for initial works of industralised building system process of projects implementation / Faridah Ismail, Norazian Mohamad Yusuwan and Har Einur Azrin Baharuddin.
by: Ismail, Faridah Hanim, et al.
Published: (2018)
by: Ismail, Faridah Hanim, et al.
Published: (2018)
Designers approach in managing legal design risks in Malaysia / Zul Zakiyuddin Ahmad Rashid, Hamimah Adnan and Norazian Mohd Yusuwan
by: Ahmad Rashid, Zul Zakiyuddin, et al.
Published: (2015)
by: Ahmad Rashid, Zul Zakiyuddin, et al.
Published: (2015)
Evaluation of lumbosacral orthosis in flexion and extension movements of lumbar spine / Norazian Abd Razak
by: Norazian, Abd Razak
Published: (2010)
by: Norazian, Abd Razak
Published: (2010)
Extension of time and acceleration claims
by: Oon, Dennis Soon Lee
Published: (2006)
by: Oon, Dennis Soon Lee
Published: (2006)
5ive Charm Center / Norazian Subari ... [et.al]
by: Subari, Norazian, et al.
Published: (2004)
by: Subari, Norazian, et al.
Published: (2004)
Settlement of 11 claims marks historic milestone
by: Hamdam, Ismail
Published: (2024)
by: Hamdam, Ismail
Published: (2024)
Misy Sunshine Specialist Centre / Norazian Ahmad... [et al.]
by: Ahmad, Norazian, et al.
Published: (2000)
by: Ahmad, Norazian, et al.
Published: (2000)
Small claims court's procedure for small claims business dispute
by: Kamarudin, Abdul Rani
Published: (2006)
by: Kamarudin, Abdul Rani
Published: (2006)
Factors contributing the delay in claim settlement towards motor insurance claim / Mustaizah Mohd Ghazi
by: Mohd Ghazi, Mustaizah
Published: (2011)
by: Mohd Ghazi, Mustaizah
Published: (2011)
Procedure for unfair dismissal claims in Malaysia
by: Ali Mohamed, Ashgar Ali, et al.
Published: (2009)
by: Ali Mohamed, Ashgar Ali, et al.
Published: (2009)
Factors in job characteristics influence employees' motivation in Lembaga Pertubuhan Peladang Negeri Melaka (LPPNM) / Norazian Nordin
by: Nordin, Norazian
Published: (2013)
by: Nordin, Norazian
Published: (2013)
Jeruk Ikan Masin Moyang-moyang / Fatin Sabrina Norazian...[et al.]
by: Norazian, Fatin Sabrina, et al.
Published: (2019)
by: Norazian, Fatin Sabrina, et al.
Published: (2019)
Claims handling procedures: a case study of Marsh Insurance Brokers Sdn Bhd / Haynee Mohamad
by: Mohamad, Haynee
Published: (2010)
by: Mohamad, Haynee
Published: (2010)
MA63: Settlement of 11 claims marks a historic milestone
by: Daily Express, -
Published: (2024)
by: Daily Express, -
Published: (2024)
The EoR sensitivity of the Murchison Widefield Array
by: Arcus, Wayne, et al.
Published: (2013)
by: Arcus, Wayne, et al.
Published: (2013)
Key variables for successful relationship marketing in business-to-business market. Case study: Telekom Malaysia Berhad (TM), Kota Bharu Kelantan / Norazian Mat Rifen
by: Mat Rifen, Norazian
Published: (2011)
by: Mat Rifen, Norazian
Published: (2011)
A high resolution foreground model for the MWA EoR1 field: model and implications for EoR power spectrum analysis
by: Procopio, P., et al.
Published: (2017)
by: Procopio, P., et al.
Published: (2017)
A Clustered Extragalactic Foreground Model for the EoR
by: Murray, Steven, et al.
Published: (2018)
by: Murray, Steven, et al.
Published: (2018)
The Australian legal framework for stress claims
by: Guthrie, Rob
Published: (2007)
by: Guthrie, Rob
Published: (2007)
Procedural control and the proper balance between public and private interests in defamation claims
by: Hyde, Richard
Published: (2014)
by: Hyde, Richard
Published: (2014)
Extension Of Time in Construction Industry
by: Tan, Ying Xuan
Published: (2013)
by: Tan, Ying Xuan
Published: (2013)
Scheduling claim analysis: a comprehensive schedule related claims of contract administration for construction industry
by: Zahidah, Jahidi
Published: (2014)
by: Zahidah, Jahidi
Published: (2014)
Impact of station far sidelobes on EoR/CD power spectra
by: Trott, Cathryn
Published: (2022)
by: Trott, Cathryn
Published: (2022)
Prediction of settlement of road construction on peat
by: Sutejo, Yulindasari, et al.
Published: (2008)
by: Sutejo, Yulindasari, et al.
Published: (2008)
Clients’ Perspectives of Risk Management Practice in Malaysian Construction Industry
by: Mohd Yusuwan, Norazian, et al.
Published: (2008)
by: Mohd Yusuwan, Norazian, et al.
Published: (2008)
First season MWA EoR power spectrum results at redshift 7
by: Beardsley, A., et al.
Published: (2016)
by: Beardsley, A., et al.
Published: (2016)
Analysing the sovereignty claim by Philippine over Sabah / Mohamad Muaawiz Abu Bakar Mohamad Zul and Firdaus Misti
by: Mohamad Zul, Mohamad Muaawiz Abu Bakar, et al.
Published: (2013)
by: Mohamad Zul, Mohamad Muaawiz Abu Bakar, et al.
Published: (2013)
A comparative analysis of landslide mapping techniques using earth observation (EO) data
by: Akanazu, Lilian Akudo
Published: (2025)
by: Akanazu, Lilian Akudo
Published: (2025)
Calibration and data analysis strategies for enhanced 21-cm EoR limits with the MWA
by: Chege, James Kariuki
Published: (2022)
by: Chege, James Kariuki
Published: (2022)
Impact on EoR Power Spectrum of Calibration of Ionospheric Parameters for SKA1-LOW
by: Trott, Cathryn
Published: (2015)
by: Trott, Cathryn
Published: (2015)
Shariah compliance assessment of construction takaful claims for loss and damage
by: Mohd Fauzi, Puteri Nur Farah Naadia, et al.
Published: (2015)
by: Mohd Fauzi, Puteri Nur Farah Naadia, et al.
Published: (2015)
Transparency in the assessment of Takaful claims for construction works loss & damage
by: Mohd Fauzi, Puteri Nur Farah Naadia, et al.
Published: (2016)
by: Mohd Fauzi, Puteri Nur Farah Naadia, et al.
Published: (2016)
Construction claims in the fast track mega infrastructure projects of Saudi Arabian Construction Industry
by: Shaikh, Haseeb Halim
Published: (2021)
by: Shaikh, Haseeb Halim
Published: (2021)
A brief history of mathematical ship-squat prediction, focussing on the contributions of E.O. Tuck.
by: Gourlay, Tim
Published: (2011)
by: Gourlay, Tim
Published: (2011)
Relationship of economies of scale (EOS) factors for Malaysian Industrialised building system (IBS) precast manufacturer
by: Tajul Ariffin, Syazwana
Published: (2019)
by: Tajul Ariffin, Syazwana
Published: (2019)
The Development of a More Efficient
Internal Tender Procedure Framework for Australian Construction Contractors
by: Urquhart, Stephen, et al.
Published: (2017)
by: Urquhart, Stephen, et al.
Published: (2017)
Removal of extensive maxillary dentigerous cyst via a Caldwell-Luc procedure
by: Asha'ari, Zamzil Amin, et al.
Published: (2008)
by: Asha'ari, Zamzil Amin, et al.
Published: (2008)
Slavery in refugee status determination procedures in Europe: a comparative socio-legal study of approaches to Eritrean protection claims
by: Palacios Arapiles, Sara
Published: (2023)
by: Palacios Arapiles, Sara
Published: (2023)
Similar Items
-
A procedural framework for extension of time (EoT) claim settlement in the Malaysian construction industry / Norazian Mohamad Yusuwan
by: Mohamad Yusuwan, Norazian
Published: (2016) -
Extension of time claim assessment in Malaysian construction industry: views from professionals / Norazian Mohamad Yusuwan and Hamimah Adnan.
by: Mohamad Yusuwan, Norazian, et al.
Published: (2018) -
Success factors for initial works of industralised building system process of projects implementation / Faridah Ismail, Norazian Mohamad Yusuwan and Har Einur Azrin Baharuddin.
by: Ismail, Faridah Hanim, et al.
Published: (2018) -
Designers approach in managing legal design risks in Malaysia / Zul Zakiyuddin Ahmad Rashid, Hamimah Adnan and Norazian Mohd Yusuwan
by: Ahmad Rashid, Zul Zakiyuddin, et al.
Published: (2015) -
Evaluation of lumbosacral orthosis in flexion and extension movements of lumbar spine / Norazian Abd Razak
by: Norazian, Abd Razak
Published: (2010)