Modelling time performance for construction of public building projects in peninsular Malaysia / Hasli Ibrahim
Completing project on time is symbolic of an efficient construction project. However, project delay is a common issue in construction industry today. The failure in estimating reasonable construction duration will jeopardize the successful completion of the projects. There are needs to establish a t...
| Main Author: | Ibrahim, Hasli |
|---|---|
| Format: | Book Section |
| Language: | English |
| Published: |
Institute of Graduate Studies, UiTM
2012
|
| Subjects: | |
| Online Access: | https://ir.uitm.edu.my/id/eprint/19141/ |
Similar Items
Determinants of FDI inflow in Asia / Anita Hasli, Catherine S F Ho and Nurhani Aba Ibrahim.
by: Hasli, Anita, et al.
Published: (2015)
by: Hasli, Anita, et al.
Published: (2015)
Rents and rent-seeking in the Malaysian economy / Mohd Hasli Bin Hasan
by: Hasan, Mohd Hasli
Published: (2004)
by: Hasan, Mohd Hasli
Published: (2004)
Antenna optimization using slot techniques for wideband application / Mohamad Amir Imran Mohd Hasli
by: Mohd Hasli, Mohamad Amir Imran
Published: (2017)
by: Mohd Hasli, Mohamad Amir Imran
Published: (2017)
Ownership concentration and firm's performance evidence from the Malaysian exchange / Anita Hasli , Mohd. Mokhtar Mohd. Ghani , Hamri Tuah
by: Hasli, Anita, et al.
Published: (2004)
by: Hasli, Anita, et al.
Published: (2004)
An overview of time and cost in arbitration for construction projects / Azira Ibrahim ... [et al.]
by: Azira, Ibrahim, et al.
Published: (2015)
by: Azira, Ibrahim, et al.
Published: (2015)
The poor involvement of local youth in the construction workforce in Malaysia / Norizzati Ibrahim
by: Ibrahim, Norizzati
Published: (2014)
by: Ibrahim, Norizzati
Published: (2014)
Time-cost relationships in Australian building construction projects
by: Love, Peter, et al.
Published: (2005)
by: Love, Peter, et al.
Published: (2005)
Exploring international construction projects: Views from Malaysian construction firms / Che Khairil Izam Che Ibrahim … [et al.]
by: Che Ibrahim, Che Khairil Izam, et al.
Published: (2009)
by: Che Ibrahim, Che Khairil Izam, et al.
Published: (2009)
Project manager’s competency framework in managing Industrialised Building System (IBS) construction project. / Izatul Laili Jabar
by: Jabar, Izatul Laili
Published: (2017)
by: Jabar, Izatul Laili
Published: (2017)
Time and cost performance of design-build projects
by: Chen, Q., et al.
Published: (2016)
by: Chen, Q., et al.
Published: (2016)
Project meeting and guidelines: the impact on time performance of construction projects in Malaysia
by: Zulkiflee Abdul-Samad,, et al.
Published: (2023)
by: Zulkiflee Abdul-Samad,, et al.
Published: (2023)
Improving cost and time control in Malaysian construction industry using building information modelling
by: Muhammad, Muhammad Tahir
Published: (2017)
by: Muhammad, Muhammad Tahir
Published: (2017)
Cost performance for building construction projects in Klang Valley
by: A.S. Ali,, et al.
Published: (2010)
by: A.S. Ali,, et al.
Published: (2010)
Benefits of Building Information Modelling in the Project Lifecycle: Construction Projects in Asia
by: Li, J., et al.
Published: (2014)
by: Li, J., et al.
Published: (2014)
Knowledge sharing framework for Sustainable Value Planning in Malaysian public construction projects / Faudzi Muhammad
by: Muhammad, Faudzi
Published: (2017)
by: Muhammad, Faudzi
Published: (2017)
Development Of Supply Chain Management Framework For Building Information Modelling Implementation In Public Sector Construction Projects
by: Ahmad, Nur Hidayah
Published: (2022)
by: Ahmad, Nur Hidayah
Published: (2022)
Development Of Supply Chain Management Framework For Building Information Modelling Implementation In Public Sector Construction Projects
by: Ahmad, Nur Hidayah
Published: (2022)
by: Ahmad, Nur Hidayah
Published: (2022)
A framework of transparency initiative (TI) to fight corruption for public construction projects / Ruzaimah Mohd Nordin
by: Mohd Nordin, Ruzaimah
Published: (2015)
by: Mohd Nordin, Ruzaimah
Published: (2015)
Key drivers for adopting design-build in public construction projects: Malaysian perspective
by: Zheng, Ping Lee, et al.
Published: (2021)
by: Zheng, Ping Lee, et al.
Published: (2021)
Benefits from Adoption of Building Information Modelling (BIM) in Building Construction Projects in Sarawak
by: Albert Nelson Robert,
Published: (2021)
by: Albert Nelson Robert,
Published: (2021)
A survey of Malaysian consultants on construction claim problems / Nor Azmi Bakhary, Hamimah Adnan and Azmi Ibrahim
by: Bakhary, Nor Azmi, et al.
Published: (2014)
by: Bakhary, Nor Azmi, et al.
Published: (2014)
The influence of intangible resources on the performance of Waqf project collaboration: mediating effect of sustainability and moderating role of collaborative effort / Siti Sara Ibrahim
by: Ibrahim, Siti Sara
Published: (2020)
by: Ibrahim, Siti Sara
Published: (2020)
Management factors affecting time and cost performance of construction projects
by: Chin Foo, Lee
Published: (2021)
by: Chin Foo, Lee
Published: (2021)
Tokoh kraf negara: Haji Tengku Ibrahim Bin Tengku Wook (satu kajian biografi) / Tengku Saripah Haji Tengku Ibrahim
by: Tengku Ibrahim, Tengku Saripah
Published: (2000)
by: Tengku Ibrahim, Tengku Saripah
Published: (2000)
Obstacle in implementing green building project in Malaysia / Farah Amira Hamzah
by: Hamzah, Farah Amira
Published: (2015)
by: Hamzah, Farah Amira
Published: (2015)
An overview of contract documents for building information modelling (BIM) construction projects
by: Ahmad Huzaimi, Abd Jamil, et al.
Published: (2017)
by: Ahmad Huzaimi, Abd Jamil, et al.
Published: (2017)
Integration of building information modelling (BIM) with materials management in construction project
by: Fayed Mogalli, Ali Hussein
Published: (2017)
by: Fayed Mogalli, Ali Hussein
Published: (2017)
The Key Critical Factors Towards Time Delay During The Construction Of Building And Infrastructure Projects In Sarawak
by: Johnny, Wong Hing Kiong
Published: (2021)
by: Johnny, Wong Hing Kiong
Published: (2021)
Investigation on the factors influencing construction time and cost overrun for high-rise building projects in Penang
by: Nor Haslinda, A., et al.
Published: (2018)
by: Nor Haslinda, A., et al.
Published: (2018)
An exploration of cost overrun in building construction projects
by: Tan, Chin Keng, et al.
Published: (2018)
by: Tan, Chin Keng, et al.
Published: (2018)
Constructs influencing disputes in building information modelling construction projects: a thematic literature review
by: Ahmad, Nur Hidayah, et al.
Published: (2020)
by: Ahmad, Nur Hidayah, et al.
Published: (2020)
Risk Analysis of Housing Projects in Malaysia Using an Industrialised Building System
by: Abu Hasan Sazalli, Saiful Azri
Published: (2008)
by: Abu Hasan Sazalli, Saiful Azri
Published: (2008)
Project cost prediction model using principal component regression for public building projects in Nigeria
by: B.O. Ganiyu,, et al.
Published: (2010)
by: B.O. Ganiyu,, et al.
Published: (2010)
Interior design and construction project management: performance and productivity in Malaysian building industry
by: Jasmani, Ismail
Published: (2016)
by: Jasmani, Ismail
Published: (2016)
The Extent Of Architect's Integration Into The
Design & Build Construction Process
In Peninsular Malaysia.
by: Tan , Seong Yeow
Published: (2002)
by: Tan , Seong Yeow
Published: (2002)
Challenges And Benefits Of Implementing Green Building Technology In Building Construction Projects
by: Lim, Zen Yang
Published: (2019)
by: Lim, Zen Yang
Published: (2019)
Development of Collaborative Contractual Framework for Building Information Modelling Enabled Construction Projects
by: Alwash, Adam
Published: (2020)
by: Alwash, Adam
Published: (2020)
Examine the perception on the integration of building information modelling and artificial intelligence in construction projects
by: Lee, Jie Anne
Published: (2021)
by: Lee, Jie Anne
Published: (2021)
The significant factors causing delay of building construction projects in Malaysia.
by: Alaghbari, Wa'el, et al.
Published: (2007)
by: Alaghbari, Wa'el, et al.
Published: (2007)
Analysis on law issues toward abandoned building housing and project in peninsular, Malaysia
by: Nor Zuraiha, Mohd Zaki
Published: (2019)
by: Nor Zuraiha, Mohd Zaki
Published: (2019)
Similar Items
-
Determinants of FDI inflow in Asia / Anita Hasli, Catherine S F Ho and Nurhani Aba Ibrahim.
by: Hasli, Anita, et al.
Published: (2015) -
Rents and rent-seeking in the Malaysian economy / Mohd Hasli Bin Hasan
by: Hasan, Mohd Hasli
Published: (2004) -
Antenna optimization using slot techniques for wideband application / Mohamad Amir Imran Mohd Hasli
by: Mohd Hasli, Mohamad Amir Imran
Published: (2017) -
Ownership concentration and firm's performance evidence from the Malaysian exchange / Anita Hasli , Mohd. Mokhtar Mohd. Ghani , Hamri Tuah
by: Hasli, Anita, et al.
Published: (2004) -
An overview of time and cost in arbitration for construction projects / Azira Ibrahim ... [et al.]
by: Azira, Ibrahim, et al.
Published: (2015)