Stakeholder in conservation projects in Malaysia / Nur Fatin Nabilah Salehuddin

Conservation activities basically involve certain professionals, organizations, bodies, contractors and consultants and etc (stakeholder). Before practising building conservation, one including an architect, building contractor, planner or anyone who has the interest in saving an historic building m...

Full description

Bibliographic Details
Main Author: Salehuddin, Nur Fatin Nabilah
Format: Student Project
Language:English
Published: Faculty of Architecture, Planning and Surveying 2013
Online Access:https://ir.uitm.edu.my/id/eprint/16600/
_version_ 1848804050444746752
author Salehuddin, Nur Fatin Nabilah
author_facet Salehuddin, Nur Fatin Nabilah
author_sort Salehuddin, Nur Fatin Nabilah
building UiTM Institutional Repository
collection Online Access
description Conservation activities basically involve certain professionals, organizations, bodies, contractors and consultants and etc (stakeholder). Before practising building conservation, one including an architect, building contractor, planner or anyone who has the interest in saving an historic building must have a broad understanding of the field itself. This is of course to ensure that any action carried out during the conservation work is properly performed and is in accord not only with the building requirements but is within the scope of contemporary knowledge of the subject. (Dr. A. Ghafar Ahmad, 1994) In this research, it will generally focus on the investigation on identifying the true stakeholder in conservation projects. Basically, the research will be mainly reviewing the requirement and criteria that a true stakeholder should encompassed. In order to find the true stakeholder, investigation will be done through the processes which are elaborated in this research. In order to achieve the goals of the academic research, three (3) objectives are outlined as follow. To identify the stakeholders involved in conservation projects. To investigate the requirements and criteria should be encompass by the stakeholder in order to be appointed in conservation projects.To evaluate the significance of appointing only true stakeholder in conservation projects. Overall, the findings show that the stakeholders in conservation projects are involved contractors, conservator, workmen/craftsmen, local authority and etc. it is also proven that all this listed professional or workers are encompassed the criteria and requirements which needed within in themselves.
first_indexed 2025-11-14T21:48:58Z
format Student Project
id uitm-16600
institution Universiti Teknologi MARA
institution_category Local University
language English
last_indexed 2025-11-14T21:48:58Z
publishDate 2013
publisher Faculty of Architecture, Planning and Surveying
recordtype eprints
repository_type Digital Repository
spelling uitm-166002019-09-10T03:12:53Z https://ir.uitm.edu.my/id/eprint/16600/ Stakeholder in conservation projects in Malaysia / Nur Fatin Nabilah Salehuddin Salehuddin, Nur Fatin Nabilah Conservation activities basically involve certain professionals, organizations, bodies, contractors and consultants and etc (stakeholder). Before practising building conservation, one including an architect, building contractor, planner or anyone who has the interest in saving an historic building must have a broad understanding of the field itself. This is of course to ensure that any action carried out during the conservation work is properly performed and is in accord not only with the building requirements but is within the scope of contemporary knowledge of the subject. (Dr. A. Ghafar Ahmad, 1994) In this research, it will generally focus on the investigation on identifying the true stakeholder in conservation projects. Basically, the research will be mainly reviewing the requirement and criteria that a true stakeholder should encompassed. In order to find the true stakeholder, investigation will be done through the processes which are elaborated in this research. In order to achieve the goals of the academic research, three (3) objectives are outlined as follow. To identify the stakeholders involved in conservation projects. To investigate the requirements and criteria should be encompass by the stakeholder in order to be appointed in conservation projects.To evaluate the significance of appointing only true stakeholder in conservation projects. Overall, the findings show that the stakeholders in conservation projects are involved contractors, conservator, workmen/craftsmen, local authority and etc. it is also proven that all this listed professional or workers are encompassed the criteria and requirements which needed within in themselves. Faculty of Architecture, Planning and Surveying 2013 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/16600/2/PPb_NUR%20FATIN%20NABILAH%20SALEHUDDIN%20AP%2013_5.pdf Salehuddin, Nur Fatin Nabilah (2013) Stakeholder in conservation projects in Malaysia / Nur Fatin Nabilah Salehuddin. (2013) [Student Project] <http://terminalib.uitm.edu.my/16600.pdf> (Unpublished)
spellingShingle Salehuddin, Nur Fatin Nabilah
Stakeholder in conservation projects in Malaysia / Nur Fatin Nabilah Salehuddin
title Stakeholder in conservation projects in Malaysia / Nur Fatin Nabilah Salehuddin
title_full Stakeholder in conservation projects in Malaysia / Nur Fatin Nabilah Salehuddin
title_fullStr Stakeholder in conservation projects in Malaysia / Nur Fatin Nabilah Salehuddin
title_full_unstemmed Stakeholder in conservation projects in Malaysia / Nur Fatin Nabilah Salehuddin
title_short Stakeholder in conservation projects in Malaysia / Nur Fatin Nabilah Salehuddin
title_sort stakeholder in conservation projects in malaysia / nur fatin nabilah salehuddin
url https://ir.uitm.edu.my/id/eprint/16600/