A study on the defect liability on low cost housing / Mohammad Azlin Hamat

According to a statement issued by the Ministry of Finance Malaysia, the period of defective liability is a period which the contractor must repair any defects identified by supervisors after completion of the work certified. All defect repair expenses shall be borne by the contractor and no additio...

Full description

Bibliographic Details
Main Author: Hamat, Mohammad Azlin
Format: Student Project
Language:English
Published: Faculty of Architecture, Planning and Surveying 2013
Online Access:https://ir.uitm.edu.my/id/eprint/16545/
_version_ 1848804035618930688
author Hamat, Mohammad Azlin
author_facet Hamat, Mohammad Azlin
author_sort Hamat, Mohammad Azlin
building UiTM Institutional Repository
collection Online Access
description According to a statement issued by the Ministry of Finance Malaysia, the period of defective liability is a period which the contractor must repair any defects identified by supervisors after completion of the work certified. All defect repair expenses shall be borne by the contractor and no additional cost to the Government. Therefore, the aim of this study is to overcome the problems faced by home buyers. This study will make a study of the defects liability period and the reason often given by the contractor in overcoming defects in a building.
first_indexed 2025-11-14T21:48:44Z
format Student Project
id uitm-16545
institution Universiti Teknologi MARA
institution_category Local University
language English
last_indexed 2025-11-14T21:48:44Z
publishDate 2013
publisher Faculty of Architecture, Planning and Surveying
recordtype eprints
repository_type Digital Repository
spelling uitm-165452019-10-08T06:55:59Z https://ir.uitm.edu.my/id/eprint/16545/ A study on the defect liability on low cost housing / Mohammad Azlin Hamat Hamat, Mohammad Azlin According to a statement issued by the Ministry of Finance Malaysia, the period of defective liability is a period which the contractor must repair any defects identified by supervisors after completion of the work certified. All defect repair expenses shall be borne by the contractor and no additional cost to the Government. Therefore, the aim of this study is to overcome the problems faced by home buyers. This study will make a study of the defects liability period and the reason often given by the contractor in overcoming defects in a building. Faculty of Architecture, Planning and Surveying 2013 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/16545/1/PPb_MOHAMMAD%20AZLIN%20HAMAT%20AP%2013_5.pdf Hamat, Mohammad Azlin (2013) A study on the defect liability on low cost housing / Mohammad Azlin Hamat. (2013) [Student Project] <http://terminalib.uitm.edu.my/16545.pdf> (Unpublished)
spellingShingle Hamat, Mohammad Azlin
A study on the defect liability on low cost housing / Mohammad Azlin Hamat
title A study on the defect liability on low cost housing / Mohammad Azlin Hamat
title_full A study on the defect liability on low cost housing / Mohammad Azlin Hamat
title_fullStr A study on the defect liability on low cost housing / Mohammad Azlin Hamat
title_full_unstemmed A study on the defect liability on low cost housing / Mohammad Azlin Hamat
title_short A study on the defect liability on low cost housing / Mohammad Azlin Hamat
title_sort study on the defect liability on low cost housing / mohammad azlin hamat
url https://ir.uitm.edu.my/id/eprint/16545/