Target costing in a stage-gate design system / Jan Alpenberg…[et al.]

The importance of new product development is observed in recent research on dynamic capabilities and target costing (TC). With established concepts from literature on dynamic capabilities and TC, we examine possible path dependent conflicts in introducing TC to an organization using a traditional we...

Full description

Bibliographic Details
Main Authors: Alpenberg, Jan, Alku, Jeton, Rashiti, Judita, Scarbrough, Paul
Format: Article
Language:English
Published: Faculty of Accountancy 2016
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/16076/
_version_ 1848803914425565184
author Alpenberg, Jan
Alku, Jeton
Rashiti, Judita
Scarbrough, Paul
author_facet Alpenberg, Jan
Alku, Jeton
Rashiti, Judita
Scarbrough, Paul
author_sort Alpenberg, Jan
building UiTM Institutional Repository
collection Online Access
description The importance of new product development is observed in recent research on dynamic capabilities and target costing (TC). With established concepts from literature on dynamic capabilities and TC, we examine possible path dependent conflicts in introducing TC to an organization using a traditional western product design approach. This study describes the attempt to add TC to a traditional stage-gate (SG) product development process. Implementing TC as a separate tool in an SG model raises the possibility that the sequential and rigorously "gated" design process would be in conflict with the iterative and multifunctional nature of TC. We find that conflict exists between the SG method and TC. This finding is consistent with criticisms on SG raised in literature. These criticisms include limitations on learning because of the truncation of sub-projects without iterations in TC. Moreover, we support the finding of a previous study that extremely rigorous gate evaluations reduce flexibility in the development system. We connect this previous study's observations with the concept of dynamic capabilities to make our analysis highly granular and to highlight the aspects of TC that are in conflict with SG-type design processes.
first_indexed 2025-11-14T21:46:49Z
format Article
id uitm-16076
institution Universiti Teknologi MARA
institution_category Local University
language English
last_indexed 2025-11-14T21:46:49Z
publishDate 2016
publisher Faculty of Accountancy
recordtype eprints
repository_type Digital Repository
spelling uitm-160762022-07-05T06:06:49Z https://ir.uitm.edu.my/id/eprint/16076/ Target costing in a stage-gate design system / Jan Alpenberg…[et al.] apmaj Alpenberg, Jan Alku, Jeton Rashiti, Judita Scarbrough, Paul Builders. Contractors. Construction industry Cost accounting. Activity-based costing The importance of new product development is observed in recent research on dynamic capabilities and target costing (TC). With established concepts from literature on dynamic capabilities and TC, we examine possible path dependent conflicts in introducing TC to an organization using a traditional western product design approach. This study describes the attempt to add TC to a traditional stage-gate (SG) product development process. Implementing TC as a separate tool in an SG model raises the possibility that the sequential and rigorously "gated" design process would be in conflict with the iterative and multifunctional nature of TC. We find that conflict exists between the SG method and TC. This finding is consistent with criticisms on SG raised in literature. These criticisms include limitations on learning because of the truncation of sub-projects without iterations in TC. Moreover, we support the finding of a previous study that extremely rigorous gate evaluations reduce flexibility in the development system. We connect this previous study's observations with the concept of dynamic capabilities to make our analysis highly granular and to highlight the aspects of TC that are in conflict with SG-type design processes. Faculty of Accountancy 2016-06 Article PeerReviewed text en https://ir.uitm.edu.my/id/eprint/16076/1/AJ_JAN%20ALPENBERG%20APMAA%2016.pdf Alpenberg, Jan and Alku, Jeton and Rashiti, Judita and Scarbrough, Paul (2016) Target costing in a stage-gate design system / Jan Alpenberg…[et al.]. (2016) Asia-Pacific Management Accounting Journal (APMAJ) <https://ir.uitm.edu.my/view/publication/Asia-Pacific_Management_Accounting_Journal_=28APMAJ=29.html>, 11 (1). pp. 24-58. ISSN 1675-3194 https://apmaj.uitm.edu.my/
spellingShingle Builders. Contractors. Construction industry
Cost accounting. Activity-based costing
Alpenberg, Jan
Alku, Jeton
Rashiti, Judita
Scarbrough, Paul
Target costing in a stage-gate design system / Jan Alpenberg…[et al.]
title Target costing in a stage-gate design system / Jan Alpenberg…[et al.]
title_full Target costing in a stage-gate design system / Jan Alpenberg…[et al.]
title_fullStr Target costing in a stage-gate design system / Jan Alpenberg…[et al.]
title_full_unstemmed Target costing in a stage-gate design system / Jan Alpenberg…[et al.]
title_short Target costing in a stage-gate design system / Jan Alpenberg…[et al.]
title_sort target costing in a stage-gate design system / jan alpenberg…[et al.]
topic Builders. Contractors. Construction industry
Cost accounting. Activity-based costing
url https://ir.uitm.edu.my/id/eprint/16076/
https://ir.uitm.edu.my/id/eprint/16076/