The appropriate collection and presentation on building surveying data / Muhammad Husnir Rahman Mohd Hapiz

This study determines the appropriate collection and presentation on building surveying data. The researcher had narrow research area on company at Selangor state only. Company that the researcher approaches are SGS (Malaysia) Sdn. Bhd. and JKR Selangor. The researcher make interview with building s...

Full description

Bibliographic Details
Main Author: Mohd Hapiz, Muhammad Husnir Rahman
Format: Student Project
Language:English
Published: Faculty of Architecture, Planning and Surveying 2015
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/15596/
_version_ 1848803785412968448
author Mohd Hapiz, Muhammad Husnir Rahman
author_facet Mohd Hapiz, Muhammad Husnir Rahman
author_sort Mohd Hapiz, Muhammad Husnir Rahman
building UiTM Institutional Repository
collection Online Access
description This study determines the appropriate collection and presentation on building surveying data. The researcher had narrow research area on company at Selangor state only. Company that the researcher approaches are SGS (Malaysia) Sdn. Bhd. and JKR Selangor. The researcher make interview with building surveyor at the company and distribute questionnaire to the specific individual. The researcher wants to know the prior basic details of the property before surveying work. The researcher concluded that all the respondent agree with scope of instruction, client name, address/location, date, description/type, type, accommodation, size, current use, road and access, tenure, fire certificate and certificate of lease. Also, the researcher wants to investigate the method to gather data and information by building surveyor. The researcher concluded that all the respondents agree with visit to site, initial researcher, property owner, solicitor, local authority and other parties. Also, the researchers concluded that all respondents agree that the present tense should be used for all matters of description in reports and the past tense should be used for all comments on condition; direct on-site dictation method; about to be included approximate building costs in reports; about to be included disclaimer of liability or exclusion clauses and the professional indemnity insurers in a report; important to set out clearly in the report what the client should to do; about it is common for surveyor subsequent dealings (discuss the report) with clients after the report been submitted; about it is prior to have a complaints handling procedure in place with the report; about it is particular to have a good report with excellent grammar and spelling; necessary to report on the design and construction, condition, cause of defects and remedial work required From the questionnaire, there are several recommendations stated from the respondents. The recommendations are to suggest the appropriate collection and presentation on building surveying data.
first_indexed 2025-11-14T21:44:46Z
format Student Project
id uitm-15596
institution Universiti Teknologi MARA
institution_category Local University
language English
last_indexed 2025-11-14T21:44:46Z
publishDate 2015
publisher Faculty of Architecture, Planning and Surveying
recordtype eprints
repository_type Digital Repository
spelling uitm-155962017-01-24T02:18:00Z https://ir.uitm.edu.my/id/eprint/15596/ The appropriate collection and presentation on building surveying data / Muhammad Husnir Rahman Mohd Hapiz Mohd Hapiz, Muhammad Husnir Rahman Surveying Estimates. Measurements. Quantities and cost This study determines the appropriate collection and presentation on building surveying data. The researcher had narrow research area on company at Selangor state only. Company that the researcher approaches are SGS (Malaysia) Sdn. Bhd. and JKR Selangor. The researcher make interview with building surveyor at the company and distribute questionnaire to the specific individual. The researcher wants to know the prior basic details of the property before surveying work. The researcher concluded that all the respondent agree with scope of instruction, client name, address/location, date, description/type, type, accommodation, size, current use, road and access, tenure, fire certificate and certificate of lease. Also, the researcher wants to investigate the method to gather data and information by building surveyor. The researcher concluded that all the respondents agree with visit to site, initial researcher, property owner, solicitor, local authority and other parties. Also, the researchers concluded that all respondents agree that the present tense should be used for all matters of description in reports and the past tense should be used for all comments on condition; direct on-site dictation method; about to be included approximate building costs in reports; about to be included disclaimer of liability or exclusion clauses and the professional indemnity insurers in a report; important to set out clearly in the report what the client should to do; about it is common for surveyor subsequent dealings (discuss the report) with clients after the report been submitted; about it is prior to have a complaints handling procedure in place with the report; about it is particular to have a good report with excellent grammar and spelling; necessary to report on the design and construction, condition, cause of defects and remedial work required From the questionnaire, there are several recommendations stated from the respondents. The recommendations are to suggest the appropriate collection and presentation on building surveying data. Faculty of Architecture, Planning and Surveying 2015 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/15596/1/PPb_MUHAMMAD%20HUSNIR%20RAHMAN%20MOHD%20HAPIZ%20AP%2015_5.pdf Mohd Hapiz, Muhammad Husnir Rahman (2015) The appropriate collection and presentation on building surveying data / Muhammad Husnir Rahman Mohd Hapiz. (2015) [Student Project] <http://terminalib.uitm.edu.my/15596.pdf> (Unpublished)
spellingShingle Surveying
Estimates. Measurements. Quantities and cost
Mohd Hapiz, Muhammad Husnir Rahman
The appropriate collection and presentation on building surveying data / Muhammad Husnir Rahman Mohd Hapiz
title The appropriate collection and presentation on building surveying data / Muhammad Husnir Rahman Mohd Hapiz
title_full The appropriate collection and presentation on building surveying data / Muhammad Husnir Rahman Mohd Hapiz
title_fullStr The appropriate collection and presentation on building surveying data / Muhammad Husnir Rahman Mohd Hapiz
title_full_unstemmed The appropriate collection and presentation on building surveying data / Muhammad Husnir Rahman Mohd Hapiz
title_short The appropriate collection and presentation on building surveying data / Muhammad Husnir Rahman Mohd Hapiz
title_sort appropriate collection and presentation on building surveying data / muhammad husnir rahman mohd hapiz
topic Surveying
Estimates. Measurements. Quantities and cost
url https://ir.uitm.edu.my/id/eprint/15596/