The nexus between global disruption due to the covid-19 and performance of the construction project

In the current COVID-19 pandemic, this paper attempts to empirically find out the increasing workplace bullying effect on project performance with employee deviant behaviour as a mediator, internal, and external locus of control as moderators. The random sampling technique was used to gather data fr...

Full description

Bibliographic Details
Main Authors: Jabeen, S., Sheraz, F., Haider, S. A., Iqbald, S., Jahan, S., Tehseen, Shehnaz *, Hussaini, T.
Format: Article
Language:English
Published: Growing Science 2021
Subjects:
Online Access:http://eprints.sunway.edu.my/1700/
http://eprints.sunway.edu.my/1700/1/Shehnaz%20The%20nexus%20between.pdf
_version_ 1848802115147792384
author Jabeen, S.
Sheraz, F.
Haider, S. A.
Iqbald, S.
Jahan, S.
Tehseen, Shehnaz *
Hussaini, T.
author_facet Jabeen, S.
Sheraz, F.
Haider, S. A.
Iqbald, S.
Jahan, S.
Tehseen, Shehnaz *
Hussaini, T.
author_sort Jabeen, S.
building SU Institutional Repository
collection Online Access
description In the current COVID-19 pandemic, this paper attempts to empirically find out the increasing workplace bullying effect on project performance with employee deviant behaviour as a mediator, internal, and external locus of control as moderators. The random sampling technique was used to gather data from 777 employees, working in construction companies in Pakistan. The examination was established using WarpPLS software version 7.0. The results revealed that workplace bullying is positively associated with employee deviant behaviour which in return negatively affects the project performance. It can be inferred from the results that the “moderating role” of internal “locus of control” is insignificant; whereas the external “locus of control” significantly moderates the relationship between workplace bullying & employee deviant behaviour. The proposed research and hypotheses support social exchange theory and social behaviour exchanges. This study has clarified some unique points that are equally important for the managers, employees, and project-based construction organization as a whole. It is also recommended that once the pandemic COVID-19 passes, it would be the dire need of that time to re-evaluate that, what has been changed in terms of professional thinking, working & behaving as for as their project work and communication between the team members is concerned.
first_indexed 2025-11-14T21:18:13Z
format Article
id sunway-1700
institution Sunway University
institution_category Local University
language English
last_indexed 2025-11-14T21:18:13Z
publishDate 2021
publisher Growing Science
recordtype eprints
repository_type Digital Repository
spelling sunway-17002021-04-05T02:13:16Z http://eprints.sunway.edu.my/1700/ The nexus between global disruption due to the covid-19 and performance of the construction project Jabeen, S. Sheraz, F. Haider, S. A. Iqbald, S. Jahan, S. Tehseen, Shehnaz * Hussaini, T. HD28 Management. Industrial Management In the current COVID-19 pandemic, this paper attempts to empirically find out the increasing workplace bullying effect on project performance with employee deviant behaviour as a mediator, internal, and external locus of control as moderators. The random sampling technique was used to gather data from 777 employees, working in construction companies in Pakistan. The examination was established using WarpPLS software version 7.0. The results revealed that workplace bullying is positively associated with employee deviant behaviour which in return negatively affects the project performance. It can be inferred from the results that the “moderating role” of internal “locus of control” is insignificant; whereas the external “locus of control” significantly moderates the relationship between workplace bullying & employee deviant behaviour. The proposed research and hypotheses support social exchange theory and social behaviour exchanges. This study has clarified some unique points that are equally important for the managers, employees, and project-based construction organization as a whole. It is also recommended that once the pandemic COVID-19 passes, it would be the dire need of that time to re-evaluate that, what has been changed in terms of professional thinking, working & behaving as for as their project work and communication between the team members is concerned. Growing Science 2021 Article PeerReviewed text en cc_by_nc_4 http://eprints.sunway.edu.my/1700/1/Shehnaz%20The%20nexus%20between.pdf Jabeen, S. and Sheraz, F. and Haider, S. A. and Iqbald, S. and Jahan, S. and Tehseen, Shehnaz * and Hussaini, T. (2021) The nexus between global disruption due to the covid-19 and performance of the construction project. Management Science Letters, 11 (6). pp. 1871-1880. ISSN 1923-9335 http://growingscience.com/msl/msl.html
spellingShingle HD28 Management. Industrial Management
Jabeen, S.
Sheraz, F.
Haider, S. A.
Iqbald, S.
Jahan, S.
Tehseen, Shehnaz *
Hussaini, T.
The nexus between global disruption due to the covid-19 and performance of the construction project
title The nexus between global disruption due to the covid-19 and performance of the construction project
title_full The nexus between global disruption due to the covid-19 and performance of the construction project
title_fullStr The nexus between global disruption due to the covid-19 and performance of the construction project
title_full_unstemmed The nexus between global disruption due to the covid-19 and performance of the construction project
title_short The nexus between global disruption due to the covid-19 and performance of the construction project
title_sort nexus between global disruption due to the covid-19 and performance of the construction project
topic HD28 Management. Industrial Management
url http://eprints.sunway.edu.my/1700/
http://eprints.sunway.edu.my/1700/
http://eprints.sunway.edu.my/1700/1/Shehnaz%20The%20nexus%20between.pdf