Component Optimisation of Multiple D&B Bridge projects: A Case Study in Sabah, Malaysia
The construction process and success in management of multiple bridge projects directly relies on the selection and optimization of their components. A systematic optimization process is adopted during the conceptual design stage to overcome the resource constraints during the construction phase....
| Main Authors: | C.T., Ramanathan, Sambu Potty, Narayanan, B. Idrus, Arazi |
|---|---|
| Format: | Citation Index Journal |
| Language: | English |
| Published: |
World Academy of Science Engineering and Technology
2009
|
| Subjects: | |
| Online Access: | http://scholars.utp.edu.my/id/eprint/948/ http://scholars.utp.edu.my/id/eprint/948/1/eprintscopy.doc |
Similar Items
SUSTAINABLE MANAGEMENT OF
MULTIPLE D&B INFRASTRUCTURE
PROJECTS IN RURAL AREAS OF SABAH
by: Sambu Potty, Narayanan, et al.
Published: (2010)
by: Sambu Potty, Narayanan, et al.
Published: (2010)
MANAGEMENT OF CRITICAL SPECIALIST WORKS IN MULTIPLE BRIDGE PROJECTS: A CASE STUDY
by: Sambu Potty, Narayanan, et al.
Published: (2009)
by: Sambu Potty, Narayanan, et al.
Published: (2009)
ELEMENT OPTIMISATION TECHNIQUES TO MANAGE MULTIPLE DB BRIDGE PROJECTS IN EAST MALAYSIA
by: C.T, Ramanathan, et al.
Published: (2008)
by: C.T, Ramanathan, et al.
Published: (2008)
Multiple Infrastructure D&B Project Management in
Rural Areas in Malaysia
by: C.T, Ramanathan, et al.
Published: (2007)
by: C.T, Ramanathan, et al.
Published: (2007)
Management Of Multiple Projects In Pre-Design And Pre-Construction Phase
by: C.T, Ramanathan, et al.
Published: (2009)
by: C.T, Ramanathan, et al.
Published: (2009)
TEAM BUILDING AND COORDINATION FOR DESIGN -BUILD MULTIPLE PROJECTS
by: C.T, Ramanathan, et al.
Published: (2007)
by: C.T, Ramanathan, et al.
Published: (2007)
LOAD AND RESISTANCE FACTOR CALIBRATION METHODOLOGY FOR OFFSHORE JACKET PLATFORMS IN MALAYSIA
by: Sambu Potty, Narayanan, et al.
Published: (2010)
by: Sambu Potty, Narayanan, et al.
Published: (2010)
OFFSHORE JACKET PLATFORMS – LRFD
CODE CALIBRATION
by: Sambu Potty, Narayanan, et al.
Published: (2010)
by: Sambu Potty, Narayanan, et al.
Published: (2010)
Pile-Sleeve Strength Modelling in API RP2A WSD,
LRFD and ISO 19902
by: Sambu Potty, Narayanan, et al.
Published: (2010)
by: Sambu Potty, Narayanan, et al.
Published: (2010)
Seismic Retrofit of Elevated Steel Water Tanks
by: Sambu Potty, Narayanan, et al.
Published: (2008)
by: Sambu Potty, Narayanan, et al.
Published: (2008)
Structural Integrity Management For
Fixed Offshore Platforms in Malaysia
by: Sambu Potty , Narayanan, et al.
Published: (2009)
by: Sambu Potty , Narayanan, et al.
Published: (2009)
Risks and Mitigation Measures in Build-
Operate-Transfer Projects
by: Syed Ahmad Bokharey, Syed Kamarul Bakri, et al.
Published: (2010)
by: Syed Ahmad Bokharey, Syed Kamarul Bakri, et al.
Published: (2010)
SUSTAINABLE INFRASTRUCTURE THROUGH
RATIONAL CODES USING RELIABILITY AND
CODE CALIBRATION
by: Sambu Potty , Narayanan, et al.
Published: (2010)
by: Sambu Potty , Narayanan, et al.
Published: (2010)
Optimised reinforcement patterns for short span bridges
by: Teo, Wee, et al.
Published: (2000)
by: Teo, Wee, et al.
Published: (2000)
Responses of Square and Triangular TLPs
Subjected to Random Waves
by: M.A, Gasim, et al.
Published: (2008)
by: M.A, Gasim, et al.
Published: (2008)
Parametric Study of TLPs Subjected to
Random Waves
by: Kurian, V.J., et al.
Published: (2008)
by: Kurian, V.J., et al.
Published: (2008)
Dynamic Response of Spar Platforms Subjected to
Waves and Current
by: O. A. A., Montasir, et al.
Published: (2008)
by: O. A. A., Montasir, et al.
Published: (2008)
AN EARNED VALUE MANAGEMENT (EVM) FRAMEWORK FOR THE
PERFORMANCE MEASUREMENT OF PFI CONSTRUCTION PROJECTS
IN MALAYSIA
by: Ali Khan, M Waris, et al.
Published: (2010)
by: Ali Khan, M Waris, et al.
Published: (2010)
THE IMPORTANCE OF PRE-OPERATIONAL PHASE OF PRIVATE FINANCE INITIATIVE (PFI) PROJECT IN MALAYSIA
by: Ali Khan, M Waris, et al.
Published: (2009)
by: Ali Khan, M Waris, et al.
Published: (2009)
PRACTICAL MODELLING ASPECTS FOR FINITE ELEMENT ANALYSIS OF SHEAR WALLS
by: Sambu Potty, Narayanan, et al.
Published: (2008)
by: Sambu Potty, Narayanan, et al.
Published: (2008)
The Human Factor In Structural Failures: Errors During Design and Construction
by: Idrus, Ir. Arazi
Published: (1995)
by: Idrus, Ir. Arazi
Published: (1995)
Improving Vector Evaluated Particle Swarm Optimisation using Multiple Nondominated Leaders
by: Faradila, Naim, et al.
Published: (2014)
by: Faradila, Naim, et al.
Published: (2014)
Functionality of Negotiation Agent on Value-based Design Decision
by: Idrus, Arazi, et al.
Published: (2009)
by: Idrus, Arazi, et al.
Published: (2009)
Study on factors that lead to the abandoned building project in Borneo (Sabah & Sarawak)
by: Izyana Jannati, Sabri
Published: (2019)
by: Izyana Jannati, Sabri
Published: (2019)
Engineers in Society
by: Idrus, Arazi, et al.
Published: (2010)
by: Idrus, Arazi, et al.
Published: (2010)
Maintenance Management Framework for Conservation of Heritage Buildings in Malaysia
by: Idrus, Arazi, et al.
Published: (2010)
by: Idrus, Arazi, et al.
Published: (2010)
Optimisation and Fabrication of Raw Material Component For
Polymer Wall
by: Cho, Winston H
Published: (2011)
by: Cho, Winston H
Published: (2011)
Implementation of multiple fan beam projection technique in optical fibre process tomography
by: Leong, Lai Chen
Published: (2005)
by: Leong, Lai Chen
Published: (2005)
Sediment transport modelling around bridge at Sungai Tuiusing 1D quasi unsteady flow HEC-RAS
by: Amaran, Krishnamuthi
Published: (2015)
by: Amaran, Krishnamuthi
Published: (2015)
Development of project cost contingency estimation model using risk analysis and fuzzy expert system
by: Idrus, Arazi, et al.
Published: (2010)
by: Idrus, Arazi, et al.
Published: (2010)
Analysis of under-deck cable stayed bridge and combined cable stayed bridge
by: Ahmad Zakwan, Zulkefly
Published: (2015)
by: Ahmad Zakwan, Zulkefly
Published: (2015)
Source Apportionment and Quality Assessment of Surface Water Using Principal Component Analysis and Multiple Linear Regression statistics
by: Nasly, Mohamed Ali, et al.
Published: (2013)
by: Nasly, Mohamed Ali, et al.
Published: (2013)
3D Object Recognition Using Multiple Views And Neural Networks.
by: Mashor, M Y, et al.
Published: (2006)
by: Mashor, M Y, et al.
Published: (2006)
A collaborative multiplicative Holt-Winters forecasting approach with dynamic fuzzy-level component
by: Kays, H. M.Emrul, et al.
Published: (2018)
by: Kays, H. M.Emrul, et al.
Published: (2018)
Development of stack component for thermoacoustic refrigerator using 3d printer
by: Nor Atiqah, Zolpakar, et al.
Published: (2021)
by: Nor Atiqah, Zolpakar, et al.
Published: (2021)
Isopleths for Rainfall Data in Sabah
by: Kurian, V.J., et al.
Published: (2006)
by: Kurian, V.J., et al.
Published: (2006)
Chapter 10: Steel Bridges
by: Parke, G. A. R ., et al.
Published: (2022)
by: Parke, G. A. R ., et al.
Published: (2022)
Quantitative analysis of defects in Malaysian university buildings: Providers’ perspective
by: Olanrewaju, Abdul Lateef, et al.
Published: (2010)
by: Olanrewaju, Abdul Lateef, et al.
Published: (2010)
Sustainability in the Context of Maintenance:
Building Defects in the Malaysian University
Campuses
by: Olanrewaju, Abdul Lateef, et al.
Published: (2010)
by: Olanrewaju, Abdul Lateef, et al.
Published: (2010)
Development of a value maintenance management model for Malaysian university campuses
by: Khamidi, M. Faris, et al.
Published: (2010)
by: Khamidi, M. Faris, et al.
Published: (2010)
Similar Items
-
SUSTAINABLE MANAGEMENT OF
MULTIPLE D&B INFRASTRUCTURE
PROJECTS IN RURAL AREAS OF SABAH
by: Sambu Potty, Narayanan, et al.
Published: (2010) -
MANAGEMENT OF CRITICAL SPECIALIST WORKS IN MULTIPLE BRIDGE PROJECTS: A CASE STUDY
by: Sambu Potty, Narayanan, et al.
Published: (2009) -
ELEMENT OPTIMISATION TECHNIQUES TO MANAGE MULTIPLE DB BRIDGE PROJECTS IN EAST MALAYSIA
by: C.T, Ramanathan, et al.
Published: (2008) -
Multiple Infrastructure D&B Project Management in
Rural Areas in Malaysia
by: C.T, Ramanathan, et al.
Published: (2007) -
Management Of Multiple Projects In Pre-Design And Pre-Construction Phase
by: C.T, Ramanathan, et al.
Published: (2009)