Short term load forecast using burg autoregressive technique
Short-term load forecasting plays an important role in planning and operation of power system. The accuracy of this forecasted value is necessary for economically efficient operation and also for effective control. This paper describes a method of autoregressive Burg in solving one week ahead of sho...
| Main Authors: | , |
|---|---|
| Format: | Conference or Workshop Item |
| Language: | English |
| Published: |
2007
|
| Subjects: | |
| Online Access: | http://scholars.utp.edu.my/id/eprint/467/ http://scholars.utp.edu.my/id/eprint/467/1/paper.pdf |
| _version_ | 1848658994410815488 |
|---|---|
| author | Z., Baharudin N.S., Kamel |
| author_facet | Z., Baharudin N.S., Kamel |
| author_sort | Z., Baharudin |
| building | UTP Institutional Repository |
| collection | Online Access |
| description | Short-term load forecasting plays an important role in planning and operation of power system. The accuracy of this forecasted value is necessary for economically efficient operation and also for effective control. This paper describes a method of autoregressive Burg in solving one week ahead of short term load forecasting. The proposed method is tested based from historical load data of Malaysia Grid system. The accuracy of proposed method, i.e., the forecast error, which is the difference between the forecast value and actual value of the load, is obtained and reported. ©2007 IEEE.
|
| first_indexed | 2025-11-13T07:23:22Z |
| format | Conference or Workshop Item |
| id | oai:scholars.utp.edu.my:467 |
| institution | Universiti Teknologi Petronas |
| institution_category | Local University |
| language | English |
| last_indexed | 2025-11-13T07:23:22Z |
| publishDate | 2007 |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | oai:scholars.utp.edu.my:4672017-01-19T08:27:16Z http://scholars.utp.edu.my/id/eprint/467/ Short term load forecast using burg autoregressive technique Z., Baharudin N.S., Kamel TK Electrical engineering. Electronics Nuclear engineering Short-term load forecasting plays an important role in planning and operation of power system. The accuracy of this forecasted value is necessary for economically efficient operation and also for effective control. This paper describes a method of autoregressive Burg in solving one week ahead of short term load forecasting. The proposed method is tested based from historical load data of Malaysia Grid system. The accuracy of proposed method, i.e., the forecast error, which is the difference between the forecast value and actual value of the load, is obtained and reported. ©2007 IEEE. 2007 Conference or Workshop Item NonPeerReviewed application/pdf en http://scholars.utp.edu.my/id/eprint/467/1/paper.pdf Z., Baharudin and N.S., Kamel (2007) Short term load forecast using burg autoregressive technique. In: 2007 International Conference on Intelligent and Advanced Systems, ICIAS 2007, 25 November 2007 through 28 November 2007, Kuala Lumpur. http://www.scopus.com/inward/record.url?eid=2-s2.0-58049108070&partnerID=40&md5=36e2647eca72974ea53c4580ae5adb61 |
| spellingShingle | TK Electrical engineering. Electronics Nuclear engineering Z., Baharudin N.S., Kamel Short term load forecast using burg autoregressive technique |
| title | Short term load forecast using burg autoregressive technique
|
| title_full | Short term load forecast using burg autoregressive technique
|
| title_fullStr | Short term load forecast using burg autoregressive technique
|
| title_full_unstemmed | Short term load forecast using burg autoregressive technique
|
| title_short | Short term load forecast using burg autoregressive technique
|
| title_sort | short term load forecast using burg autoregressive technique |
| topic | TK Electrical engineering. Electronics Nuclear engineering |
| url | http://scholars.utp.edu.my/id/eprint/467/ http://scholars.utp.edu.my/id/eprint/467/ http://scholars.utp.edu.my/id/eprint/467/1/paper.pdf |