Development of project cost contingency estimation model using risk analysis and fuzzy expert system
Contractors traditionally estimate cost contingency based on subjective judgment, such as 5–10% from the cost estimated by considering past similar project. However, such method does not have a sound basis and is difficult to justify or defend. Therefore, more objective methods for estimating proj...
| Main Authors: | Idrus, Arazi, Nuruddin, F, Rohman, M.Arif |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Elsevier
2010
|
| Subjects: | |
| Online Access: | http://scholars.utp.edu.my/id/eprint/3281/ http://scholars.utp.edu.my/id/eprint/3281/1/ESWA4955.pdf |
Similar Items
The Influence Of Uncertainty Variables On
Project Cost Estimation
by: Rauzana, Anita
Published: (2015)
by: Rauzana, Anita
Published: (2015)
Computerised building cost estimating system
by: Marjuki, Mofti
Published: (2006)
by: Marjuki, Mofti
Published: (2006)
Cost control in construction project of the site
by: Mohd Iskandar Zulkarnain, Talib
Published: (2010)
by: Mohd Iskandar Zulkarnain, Talib
Published: (2010)
Project cost performance forecasting system
by: Mohd. Nasira, Siti Rashidah, et al.
Published: (2006)
by: Mohd. Nasira, Siti Rashidah, et al.
Published: (2006)
Tendering and estimating for civil engineering project
by: Zaidi, Alwui
Published: (1998)
by: Zaidi, Alwui
Published: (1998)
Impact of unplanned schedule compression on project cost
by: Mansur, Shaiful Amri, et al.
Published: (2006)
by: Mansur, Shaiful Amri, et al.
Published: (2006)
An earned value management (EVM) framework for the performance measurement of PFI construction projects in Malaysia
by: Khan, M. Waris Ali, et al.
Published: (2010)
by: Khan, M. Waris Ali, et al.
Published: (2010)
Identification of cost data input in life cycle cost (LCC) for building projects
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
Impact of the cost overrun factors on the project delays in construction industry
by: Noor Elinah, Sailin
Published: (2018)
by: Noor Elinah, Sailin
Published: (2018)
Measuring Quality Performance in Construction
by: Sodangi, Mahmoud, et al.
Published: (2010)
by: Sodangi, Mahmoud, et al.
Published: (2010)
The Level of Importance of Criteria and Sub Criteria in Green Building Index Malaysia
by: Rahardjati, Retno, et al.
Published: (2010)
by: Rahardjati, Retno, et al.
Published: (2010)
The Significant Risks In Small Scale Construction Projects
by: Nur Sharkila, Muhammad Shukri, et al.
Published: (2016)
by: Nur Sharkila, Muhammad Shukri, et al.
Published: (2016)
Impact of cost overrun factors on the project delay in construction industry, Pahang, Malaysia
by: Zhi Jia, Ling
Published: (2014)
by: Zhi Jia, Ling
Published: (2014)
Mitigation measures for critical factors causing cost overrun in Malaysian building projects
by: Ullah, Kaleem
Published: (2018)
by: Ullah, Kaleem
Published: (2018)
Agreement Options in Multi-person Decision Optimizing High-rise Buildings Columns
by: Utomo, Christiono, et al.
Published: (2009)
by: Utomo, Christiono, et al.
Published: (2009)
Planning & scheduling for construction project: a case study of duration estimation & influence factors
by: Nor Hashimah, Mohd Fuzi
Published: (2014)
by: Nor Hashimah, Mohd Fuzi
Published: (2014)
Assessment of Environmental Risks in Construction Projects: A Case of Malaysia
by: Ansah, Richard Hannis, et al.
Published: (2016)
by: Ansah, Richard Hannis, et al.
Published: (2016)
Estimating Project Cost Contingency - Beyond the 10% syndrome
by: Baccarini, David
Published: (2005)
by: Baccarini, David
Published: (2005)
Investigation on the factors influencing construction time and cost overrun for high-rise building projects in Penang
by: Nor Haslinda, A., et al.
Published: (2018)
by: Nor Haslinda, A., et al.
Published: (2018)
Incorporation of Risk Index for Risk Response and Risk Mitigation Strategies of Public-Private Partnership (PPP) Housing Construction Project in Malaysia
by: Putri Zulaiha, Razi, et al.
Published: (2020)
by: Putri Zulaiha, Razi, et al.
Published: (2020)
The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman
by: Mohd Azrai, Azman
Published: (2012)
by: Mohd Azrai, Azman
Published: (2012)
Identification Of Factors Influencing Costs In Green Projects
by: Zainul Abidin, Nazirah, et al.
Published: (2016)
by: Zainul Abidin, Nazirah, et al.
Published: (2016)
New Procurement Method for Housing Projects Implementing IBS Modular System
by: Abd Jalil, Ahmad, et al.
Published: (2015)
by: Abd Jalil, Ahmad, et al.
Published: (2015)
Computers tools in construction
by: Idrus, Arazi, et al.
Published: (2008)
by: Idrus, Arazi, et al.
Published: (2008)
Cost implication for a residential high-rise project to achieve certified level Green Building Index (GBI) rating.
by: Lai, Wei Chian
Published: (2013)
by: Lai, Wei Chian
Published: (2013)
Identification of Critical Variables in Cost Estimating for Building Conservation Works.
by: Lim , Yoke Mui
by: Lim , Yoke Mui
Fuzzy risk analysis for construction projects
by: Chaher, Zid, et al.
Published: (2016)
by: Chaher, Zid, et al.
Published: (2016)
Significant Factors Causing Cost Overruns In
Telecommunication Projects In Nigeria
by: Ameh, Oko John, et al.
Published: (2010)
by: Ameh, Oko John, et al.
Published: (2010)
Modelling capability-based risk assessment for international construction project ventures / Loo Siaw Chuing
by: Loo, Siaw Chuing
Published: (2015)
by: Loo, Siaw Chuing
Published: (2015)
The maturing concept of estimating project cost contingency: A review
by: Baccarini, David
Published: (2006)
by: Baccarini, David
Published: (2006)
Factors Affecting The Accuracy Of Pre-tender Cost Estimates In The
Gaza Strip
by: Enshassi, Adnan, et al.
Published: (2013)
by: Enshassi, Adnan, et al.
Published: (2013)
THE IMPORTANCE OF PRE-OPERATIONAL PHASE OF PRIVATE FINANCE INITIATIVE (PFI) PROJECT IN MALAYSIA
by: Ali Khan, M Waris, et al.
Published: (2009)
by: Ali Khan, M Waris, et al.
Published: (2009)
Reviewing and identifying the green criteria in relation to the building cost: project management
by: Naamandadin, Nurul Akmam, et al.
Published: (2019)
by: Naamandadin, Nurul Akmam, et al.
Published: (2019)
Studying the Reasons for Delay and Cost Overrun in Construction
Projects: The Case of Iran
by: Samarghandi, Hamed, et al.
Published: (2016)
by: Samarghandi, Hamed, et al.
Published: (2016)
Impact of Variation Orders on Time and Cost in Mega Hydropower
Projects of Pakistan
by: Hanif, Hashim, et al.
Published: (2016)
by: Hanif, Hashim, et al.
Published: (2016)
Stakeholders’ perception on critical cost variation factors in Malaysian building projects
by: Sohu, Samiullah, et al.
Published: (2018)
by: Sohu, Samiullah, et al.
Published: (2018)
A contingency theory approach for construction companies in Malaysia during the period of economic crisis: survival strategies
by: Bakar, Abu Hassan Abu, et al.
Published: (2008)
by: Bakar, Abu Hassan Abu, et al.
Published: (2008)
Investigation Into The Causes Of Delays And Cost Overruns In
Uganda's Public Sector Construction Projects
by: Alinaitwe, Henry, et al.
Published: (2013)
by: Alinaitwe, Henry, et al.
Published: (2013)
Developing A Preventive Cost Control Model By Utilising
Early Warnings And Risks
by: Bahaudin, Ahmad Yusni
Published: (2011)
by: Bahaudin, Ahmad Yusni
Published: (2011)
The Human Factor In Structural Failures: Errors During Design and Construction
by: Idrus, Ir. Arazi
Published: (1995)
by: Idrus, Ir. Arazi
Published: (1995)
Similar Items
-
The Influence Of Uncertainty Variables On
Project Cost Estimation
by: Rauzana, Anita
Published: (2015) -
Computerised building cost estimating system
by: Marjuki, Mofti
Published: (2006) -
Cost control in construction project of the site
by: Mohd Iskandar Zulkarnain, Talib
Published: (2010) -
Project cost performance forecasting system
by: Mohd. Nasira, Siti Rashidah, et al.
Published: (2006) -
Tendering and estimating for civil engineering project
by: Zaidi, Alwui
Published: (1998)