Development of project cost contingency estimation model using risk analysis and fuzzy expert system

Contractors traditionally estimate cost contingency based on subjective judgment, such as 5–10% from the cost estimated by considering past similar project. However, such method does not have a sound basis and is difficult to justify or defend. Therefore, more objective methods for estimating proj...

Full description

Bibliographic Details
Main Authors: Idrus, Arazi, Nuruddin, F, Rohman, M.Arif
Format: Article
Language:English
Published: Elsevier 2010
Subjects:
Online Access:http://scholars.utp.edu.my/id/eprint/3281/
http://scholars.utp.edu.my/id/eprint/3281/1/ESWA4955.pdf
_version_ 1848659378614304768
author Idrus, Arazi
Nuruddin, F
Rohman, M.Arif
author_facet Idrus, Arazi
Nuruddin, F
Rohman, M.Arif
author_sort Idrus, Arazi
building UTP Institutional Repository
collection Online Access
description Contractors traditionally estimate cost contingency based on subjective judgment, such as 5–10% from the cost estimated by considering past similar project. However, such method does not have a sound basis and is difficult to justify or defend. Therefore, more objective methods for estimating project cost contingency have been presented. However, most of the methods still rely on formal modeling techniques, which is not easy to be applied in construction industry. This research proposes a method to estimate cost contingency using a flexible and rational approach that could accommodate contractors’subjective judgment based on risk analysis and fuzzy expert system concept. In this research, the proposed method involved the development of cost contingency model for building and infrastructure projects in Malaysia. According to the validation result, it was found that the predictions given by the system were within 20% accuracy compared to actual cost contingencies.
first_indexed 2025-11-13T07:29:29Z
format Article
id oai:scholars.utp.edu.my:3281
institution Universiti Teknologi Petronas
institution_category Local University
language English
last_indexed 2025-11-13T07:29:29Z
publishDate 2010
publisher Elsevier
recordtype eprints
repository_type Digital Repository
spelling oai:scholars.utp.edu.my:32812017-03-20T07:48:16Z http://scholars.utp.edu.my/id/eprint/3281/ Development of project cost contingency estimation model using risk analysis and fuzzy expert system Idrus, Arazi Nuruddin, F Rohman, M.Arif TH Building construction Contractors traditionally estimate cost contingency based on subjective judgment, such as 5–10% from the cost estimated by considering past similar project. However, such method does not have a sound basis and is difficult to justify or defend. Therefore, more objective methods for estimating project cost contingency have been presented. However, most of the methods still rely on formal modeling techniques, which is not easy to be applied in construction industry. This research proposes a method to estimate cost contingency using a flexible and rational approach that could accommodate contractors’subjective judgment based on risk analysis and fuzzy expert system concept. In this research, the proposed method involved the development of cost contingency model for building and infrastructure projects in Malaysia. According to the validation result, it was found that the predictions given by the system were within 20% accuracy compared to actual cost contingencies. Elsevier 2010 Article PeerReviewed application/pdf en http://scholars.utp.edu.my/id/eprint/3281/1/ESWA4955.pdf Idrus, Arazi and Nuruddin, F and Rohman, M.Arif (2010) Development of project cost contingency estimation model using risk analysis and fuzzy expert system. Expert Systems with Applications, Volume (Issue ). pp. 1501-1508.
spellingShingle TH Building construction
Idrus, Arazi
Nuruddin, F
Rohman, M.Arif
Development of project cost contingency estimation model using risk analysis and fuzzy expert system
title Development of project cost contingency estimation model using risk analysis and fuzzy expert system
title_full Development of project cost contingency estimation model using risk analysis and fuzzy expert system
title_fullStr Development of project cost contingency estimation model using risk analysis and fuzzy expert system
title_full_unstemmed Development of project cost contingency estimation model using risk analysis and fuzzy expert system
title_short Development of project cost contingency estimation model using risk analysis and fuzzy expert system
title_sort development of project cost contingency estimation model using risk analysis and fuzzy expert system
topic TH Building construction
url http://scholars.utp.edu.my/id/eprint/3281/
http://scholars.utp.edu.my/id/eprint/3281/1/ESWA4955.pdf