Modelling & simulation of an offshore platform (SUMANDAK phase 2 - SUPG-B development project)
A power system analysis determines whether the proposed system upgrades, future upgrades and present distribution equipment will meet the present and future system requirements. This project involves two major parts, namely modelling and simulation for the purpose of load flow and short circuit stud...
| Main Authors: | , |
|---|---|
| Format: | Conference or Workshop Item |
| Language: | English |
| Published: |
2007
|
| Subjects: | |
| Online Access: | http://scholars.utp.edu.my/id/eprint/315/ http://scholars.utp.edu.my/id/eprint/315/1/paper.pdf |
| _version_ | 1848658957633060864 |
|---|---|
| author | P., Nallagownden A.A., Fauzi |
| author_facet | P., Nallagownden A.A., Fauzi |
| author_sort | P., Nallagownden |
| building | UTP Institutional Repository |
| collection | Online Access |
| description | A power system analysis determines whether the proposed system upgrades, future upgrades and present distribution equipment will meet the present and future system requirements. This project involves two major parts, namely modelling and simulation for the purpose of load flow and short circuit studies. Modelling here refers to the mathematical representation of various components of a power system such as generating units, transmission lines, buses, transformers, loads, machines, etc. While simulation is required to establish the actual situation on the platform and how it will run based on different scenarios. ERACS has been extensively used in this project as it helps to improve the simulation process by increasing the speed of simulation and has a powerful graphical user interface. SUMANDAK Phase 2 (SUPG-B) Platform is chosen as a case study for sample analysis. The main objective of the project is to determine the performance of an electrical power system for an offshore platform and to validate its precision, based on the system stability and equipment selection of an actual project. ©2007 IEEE.
|
| first_indexed | 2025-11-13T07:22:47Z |
| format | Conference or Workshop Item |
| id | oai:scholars.utp.edu.my:315 |
| institution | Universiti Teknologi Petronas |
| institution_category | Local University |
| language | English |
| last_indexed | 2025-11-13T07:22:47Z |
| publishDate | 2007 |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | oai:scholars.utp.edu.my:3152017-01-19T08:27:11Z http://scholars.utp.edu.my/id/eprint/315/ Modelling & simulation of an offshore platform (SUMANDAK phase 2 - SUPG-B development project) P., Nallagownden A.A., Fauzi TK Electrical engineering. Electronics Nuclear engineering A power system analysis determines whether the proposed system upgrades, future upgrades and present distribution equipment will meet the present and future system requirements. This project involves two major parts, namely modelling and simulation for the purpose of load flow and short circuit studies. Modelling here refers to the mathematical representation of various components of a power system such as generating units, transmission lines, buses, transformers, loads, machines, etc. While simulation is required to establish the actual situation on the platform and how it will run based on different scenarios. ERACS has been extensively used in this project as it helps to improve the simulation process by increasing the speed of simulation and has a powerful graphical user interface. SUMANDAK Phase 2 (SUPG-B) Platform is chosen as a case study for sample analysis. The main objective of the project is to determine the performance of an electrical power system for an offshore platform and to validate its precision, based on the system stability and equipment selection of an actual project. ©2007 IEEE. 2007 Conference or Workshop Item NonPeerReviewed application/pdf en http://scholars.utp.edu.my/id/eprint/315/1/paper.pdf P., Nallagownden and A.A., Fauzi (2007) Modelling & simulation of an offshore platform (SUMANDAK phase 2 - SUPG-B development project). In: 2007 International Conference on Intelligent and Advanced Systems, ICIAS 2007, 25 November 2007 through 28 November 2007, Kuala Lumpur. http://www.scopus.com/inward/record.url?eid=2-s2.0-57949098354&partnerID=40&md5=3cb2d054dc0aff2651413ca3b5efd370 |
| spellingShingle | TK Electrical engineering. Electronics Nuclear engineering P., Nallagownden A.A., Fauzi Modelling & simulation of an offshore platform (SUMANDAK phase 2 - SUPG-B development project) |
| title | Modelling & simulation of an offshore platform (SUMANDAK phase 2 - SUPG-B development project)
|
| title_full | Modelling & simulation of an offshore platform (SUMANDAK phase 2 - SUPG-B development project)
|
| title_fullStr | Modelling & simulation of an offshore platform (SUMANDAK phase 2 - SUPG-B development project)
|
| title_full_unstemmed | Modelling & simulation of an offshore platform (SUMANDAK phase 2 - SUPG-B development project)
|
| title_short | Modelling & simulation of an offshore platform (SUMANDAK phase 2 - SUPG-B development project)
|
| title_sort | modelling & simulation of an offshore platform (sumandak phase 2 - supg-b development project) |
| topic | TK Electrical engineering. Electronics Nuclear engineering |
| url | http://scholars.utp.edu.my/id/eprint/315/ http://scholars.utp.edu.my/id/eprint/315/ http://scholars.utp.edu.my/id/eprint/315/1/paper.pdf |