AN EARNED VALUE MANAGEMENT (EVM) FRAMEWORK FOR THE PERFORMANCE MEASUREMENT OF PFI CONSTRUCTION PROJECTS IN MALAYSIA
Earned Value Management (EVM) is a project performance measurement method which integrates the cost, schedule and technical performance. It establishes the earn value of a completed work and compares it with the actual cost and planned cost to determine the project performance and to forecast its f...
| Main Authors: | Ali Khan, M Waris, Khamidi, M. Faris, Idrus, Arazi |
|---|---|
| Format: | Conference or Workshop Item |
| Language: | English |
| Published: |
2010
|
| Subjects: | |
| Online Access: | http://scholars.utp.edu.my/id/eprint/2963/ http://scholars.utp.edu.my/id/eprint/2963/1/2nd_ICTOM_2010__Waris.pdf |
Similar Items
An earned value management (EVM) framework for the performance measurement of PFI construction projects in Malaysia
by: Khan, M. Waris Ali, et al.
Published: (2010)
by: Khan, M. Waris Ali, et al.
Published: (2010)
THE IMPORTANCE OF PRE-OPERATIONAL PHASE OF PRIVATE FINANCE INITIATIVE (PFI) PROJECT IN MALAYSIA
by: Ali Khan, M Waris, et al.
Published: (2009)
by: Ali Khan, M Waris, et al.
Published: (2009)
The Application of Earned Value Management (EVM) in Construction Project Management
by: Tan, Chin Keng, et al.
Published: (2015)
by: Tan, Chin Keng, et al.
Published: (2015)
Review of Earned Value Management (EVM) tool for project management
by: Al-Affendi, Andy, et al.
Published: (2018)
by: Al-Affendi, Andy, et al.
Published: (2018)
An Investigation on the Application of Earned Value Management (EVM) in Managing Cost Performance
by: Lum, Seon
Published: (2015)
by: Lum, Seon
Published: (2015)
Analysing the Potential Application of the Earned Value Management (EVM) in the Spanish Construction Industry – An Initial Review of the Dataset
by: Sutrisna, Monty, et al.
Published: (2013)
by: Sutrisna, Monty, et al.
Published: (2013)
Maintenance Management Framework for Conservation of Heritage Buildings in Malaysia
by: Idrus, Arazi, et al.
Published: (2010)
by: Idrus, Arazi, et al.
Published: (2010)
Measuring Quality Performance in Construction
by: Sodangi, Mahmoud, et al.
Published: (2010)
by: Sodangi, Mahmoud, et al.
Published: (2010)
Development of a value maintenance management model for Malaysian university campuses
by: Khamidi, M. Faris, et al.
Published: (2010)
by: Khamidi, M. Faris, et al.
Published: (2010)
Power Amplifier Modeling and EVM Measurement Technique
by: Ben, Ooi Zee Min
Published: (2010)
by: Ben, Ooi Zee Min
Published: (2010)
Value-based Maintenance Management Model for University Buildings in Malaysia - A Critical Review
by: Idrus, Arazi, et al.
Published: (2009)
by: Idrus, Arazi, et al.
Published: (2009)
Engineers in Society
by: Idrus, Arazi, et al.
Published: (2010)
by: Idrus, Arazi, et al.
Published: (2010)
Private finance initiative (PFI): concept and method of procurement for construction projects
by: Abdul Rashid, Khairuddin
Published: (2007)
by: Abdul Rashid, Khairuddin
Published: (2007)
Aggregation and Coalition Formation on Value Based Decision
by: Utomo, Christiono, et al.
Published: (2009)
by: Utomo, Christiono, et al.
Published: (2009)
Quantitative analysis of defects in Malaysian university buildings: Providers’ perspective
by: Olanrewaju, Abdul Lateef, et al.
Published: (2010)
by: Olanrewaju, Abdul Lateef, et al.
Published: (2010)
Sustainability in the Context of Maintenance:
Building Defects in the Malaysian University
Campuses
by: Olanrewaju, Abdul Lateef, et al.
Published: (2010)
by: Olanrewaju, Abdul Lateef, et al.
Published: (2010)
Exploring the Perception of Earned Value Analysis for the Malaysian Construction Industry
by: Nur Syamimi, Zulkefli, et al.
Published: (2018)
by: Nur Syamimi, Zulkefli, et al.
Published: (2018)
Determination of risk identification process employed by NHS for a PFI hospital project in the UK
by: Mohamed Ghazali, F. E., et al.
Published: (2009)
by: Mohamed Ghazali, F. E., et al.
Published: (2009)
The contribution of earned value analysis for cost controlling of construction projects
by: Shi Cia, Ng
Published: (2014)
by: Shi Cia, Ng
Published: (2014)
PFI: is Malaysia ready?
by: Abdul Rashid, Khairuddin
Published: (2009)
by: Abdul Rashid, Khairuddin
Published: (2009)
Universiti Teknologi PETRONAS Energy Retrofitting:
Turning Challenges into Opportunities
by: Khamidi, M. Faris, et al.
Published: (2010)
by: Khamidi, M. Faris, et al.
Published: (2010)
The Level of Importance of Criteria and Sub Criteria in Green Building Index Malaysia
by: Rahardjati, Retno, et al.
Published: (2010)
by: Rahardjati, Retno, et al.
Published: (2010)
The Human Factor In Structural Failures: Errors During Design and Construction
by: Idrus, Ir. Arazi
Published: (1995)
by: Idrus, Ir. Arazi
Published: (1995)
Pros and cons of incomplete contract in Private Finance Initiative (PFI) Project
by: Mansor, Syaimasyaza, et al.
Published: (2019)
by: Mansor, Syaimasyaza, et al.
Published: (2019)
CFD Prediction of Heat and Fluid Flow through U-Bends using High Reynolds-number EVM and DSM Models
by: M. F., Ghazali, et al.
Published: (2013)
by: M. F., Ghazali, et al.
Published: (2013)
Functionality of Negotiation Agent on Value-based Design Decision
by: Idrus, Arazi, et al.
Published: (2009)
by: Idrus, Arazi, et al.
Published: (2009)
Enabling Implementation of Earned Value Management in the Spanish Construction Industry
by: Sutrisna, Monty, et al.
Published: (2012)
by: Sutrisna, Monty, et al.
Published: (2012)
MANAGEMENT OF CRITICAL SPECIALIST WORKS IN MULTIPLE BRIDGE PROJECTS: A CASE STUDY
by: Sambu Potty, Narayanan, et al.
Published: (2009)
by: Sambu Potty, Narayanan, et al.
Published: (2009)
SUSTAINABLE MANAGEMENT OF
MULTIPLE D&B INFRASTRUCTURE
PROJECTS IN RURAL AREAS OF SABAH
by: Sambu Potty, Narayanan, et al.
Published: (2010)
by: Sambu Potty, Narayanan, et al.
Published: (2010)
The application of earned value management in event project management industry
by: Xin Hao, Yeoh
Published: (2014)
by: Xin Hao, Yeoh
Published: (2014)
Development of visualized earned value management tool for project management
by: Abdullah, Andy-Al-Affendi
Published: (2018)
by: Abdullah, Andy-Al-Affendi
Published: (2018)
PPP/PFI - Konsep, Pelaksaan & Cabaran (Concept, Implementation & Challenges)
by: Abdul Rashid, Khairuddin
Published: (2015)
by: Abdul Rashid, Khairuddin
Published: (2015)
Agreement Options on Multi Criteria Group Decision and Negotiation
by: Utomo, Christiono, et al.
Published: (2009)
by: Utomo, Christiono, et al.
Published: (2009)
Agreement Options in Multi-person Decision Optimizing High-rise Buildings Columns
by: Utomo, Christiono, et al.
Published: (2009)
by: Utomo, Christiono, et al.
Published: (2009)
Quantity surveyors and their competencies in the provision of PFI services
by: Khairuddin, Samer Shahedza, et al.
Published: (2016)
by: Khairuddin, Samer Shahedza, et al.
Published: (2016)
Time Performance Analysis Using Earned Value on the Construction of the Aranaway Kiram Bridge in Banjar Baru City
by: Tezar Aulia, Rachman
Published: (2024)
by: Tezar Aulia, Rachman
Published: (2024)
Case Study of Concurrent Engineering in Stadium
Construction
by: Kuna Segaran, Vrejenan, et al.
Published: (2010)
by: Kuna Segaran, Vrejenan, et al.
Published: (2010)
Application of modified delphi in identifying the presence of Incomplete Contract (IC) in Private Finance Initiative (PFI) Projects
by: Mansor, Syaimasyaza, et al.
Published: (2017)
by: Mansor, Syaimasyaza, et al.
Published: (2017)
Component Optimisation of Multiple D&B Bridge projects: A Case Study in Sabah, Malaysia
by: C.T., Ramanathan, et al.
Published: (2009)
by: C.T., Ramanathan, et al.
Published: (2009)
The Private Finance Initiative(PFI)in schools: the experiences of users
by: Ismail, Suhaiza, et al.
Published: (2006)
by: Ismail, Suhaiza, et al.
Published: (2006)
Similar Items
-
An earned value management (EVM) framework for the performance measurement of PFI construction projects in Malaysia
by: Khan, M. Waris Ali, et al.
Published: (2010) -
THE IMPORTANCE OF PRE-OPERATIONAL PHASE OF PRIVATE FINANCE INITIATIVE (PFI) PROJECT IN MALAYSIA
by: Ali Khan, M Waris, et al.
Published: (2009) -
The Application of Earned Value Management (EVM) in Construction Project Management
by: Tan, Chin Keng, et al.
Published: (2015) -
Review of Earned Value Management (EVM) tool for project management
by: Al-Affendi, Andy, et al.
Published: (2018) -
An Investigation on the Application of Earned Value Management (EVM) in Managing Cost Performance
by: Lum, Seon
Published: (2015)