AN EARNED VALUE MANAGEMENT (EVM) FRAMEWORK FOR THE PERFORMANCE MEASUREMENT OF PFI CONSTRUCTION PROJECTS IN MALAYSIA
Earned Value Management (EVM) is a project performance measurement method which integrates the cost, schedule and technical performance. It establishes the earn value of a completed work and compares it with the actual cost and planned cost to determine the project performance and to forecast its f...
| Main Authors: | , , |
|---|---|
| Format: | Conference or Workshop Item |
| Language: | English |
| Published: |
2010
|
| Subjects: | |
| Online Access: | http://scholars.utp.edu.my/id/eprint/2963/ http://scholars.utp.edu.my/id/eprint/2963/1/2nd_ICTOM_2010__Waris.pdf |
| _version_ | 1848659333397610496 |
|---|---|
| author | Ali Khan, M Waris Khamidi, M. Faris Idrus, Arazi |
| author_facet | Ali Khan, M Waris Khamidi, M. Faris Idrus, Arazi |
| author_sort | Ali Khan, M Waris |
| building | UTP Institutional Repository |
| collection | Online Access |
| description | Earned Value Management (EVM) is a project performance measurement method which integrates the cost, schedule and technical performance. It establishes the earn value of a
completed work and compares it with the actual cost and planned cost to determine the project performance and to forecast its future trends. This technique encourages public
and private organizations to monitor the performance of their mega projects effectively. The present study examines the EVM process in order to derive a framework for monitoring and controlling of PFI construction projects in Malaysia. The proposed framework is comprised of five fundamental elements i.e. organizational policy; planning; implementation; measurement, analysis and reporting; and management performance review. These elements interact with each other to form an integrated EVM performance measurement system. The aim of this framework is to provide the construction organizations an understandable view about the implementation of an EVM System. |
| first_indexed | 2025-11-13T07:28:45Z |
| format | Conference or Workshop Item |
| id | oai:scholars.utp.edu.my:2963 |
| institution | Universiti Teknologi Petronas |
| institution_category | Local University |
| language | English |
| last_indexed | 2025-11-13T07:28:45Z |
| publishDate | 2010 |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | oai:scholars.utp.edu.my:29632017-01-19T08:23:54Z http://scholars.utp.edu.my/id/eprint/2963/ AN EARNED VALUE MANAGEMENT (EVM) FRAMEWORK FOR THE PERFORMANCE MEASUREMENT OF PFI CONSTRUCTION PROJECTS IN MALAYSIA Ali Khan, M Waris Khamidi, M. Faris Idrus, Arazi TA Engineering (General). Civil engineering (General) Earned Value Management (EVM) is a project performance measurement method which integrates the cost, schedule and technical performance. It establishes the earn value of a completed work and compares it with the actual cost and planned cost to determine the project performance and to forecast its future trends. This technique encourages public and private organizations to monitor the performance of their mega projects effectively. The present study examines the EVM process in order to derive a framework for monitoring and controlling of PFI construction projects in Malaysia. The proposed framework is comprised of five fundamental elements i.e. organizational policy; planning; implementation; measurement, analysis and reporting; and management performance review. These elements interact with each other to form an integrated EVM performance measurement system. The aim of this framework is to provide the construction organizations an understandable view about the implementation of an EVM System. 2010-07 Conference or Workshop Item PeerReviewed application/pdf en http://scholars.utp.edu.my/id/eprint/2963/1/2nd_ICTOM_2010__Waris.pdf Ali Khan, M Waris and Khamidi, M. Faris and Idrus, Arazi (2010) AN EARNED VALUE MANAGEMENT (EVM) FRAMEWORK FOR THE PERFORMANCE MEASUREMENT OF PFI CONSTRUCTION PROJECTS IN MALAYSIA. In: 2nd International Conference on Technology and Operations Management, 5th to 6th July 2010, Langkawi, Kedah, Malaysia. |
| spellingShingle | TA Engineering (General). Civil engineering (General) Ali Khan, M Waris Khamidi, M. Faris Idrus, Arazi AN EARNED VALUE MANAGEMENT (EVM) FRAMEWORK FOR THE PERFORMANCE MEASUREMENT OF PFI CONSTRUCTION PROJECTS IN MALAYSIA |
| title | AN EARNED VALUE MANAGEMENT (EVM) FRAMEWORK FOR THE
PERFORMANCE MEASUREMENT OF PFI CONSTRUCTION PROJECTS
IN MALAYSIA |
| title_full | AN EARNED VALUE MANAGEMENT (EVM) FRAMEWORK FOR THE
PERFORMANCE MEASUREMENT OF PFI CONSTRUCTION PROJECTS
IN MALAYSIA |
| title_fullStr | AN EARNED VALUE MANAGEMENT (EVM) FRAMEWORK FOR THE
PERFORMANCE MEASUREMENT OF PFI CONSTRUCTION PROJECTS
IN MALAYSIA |
| title_full_unstemmed | AN EARNED VALUE MANAGEMENT (EVM) FRAMEWORK FOR THE
PERFORMANCE MEASUREMENT OF PFI CONSTRUCTION PROJECTS
IN MALAYSIA |
| title_short | AN EARNED VALUE MANAGEMENT (EVM) FRAMEWORK FOR THE
PERFORMANCE MEASUREMENT OF PFI CONSTRUCTION PROJECTS
IN MALAYSIA |
| title_sort | earned value management (evm) framework for the
performance measurement of pfi construction projects
in malaysia |
| topic | TA Engineering (General). Civil engineering (General) |
| url | http://scholars.utp.edu.my/id/eprint/2963/ http://scholars.utp.edu.my/id/eprint/2963/1/2nd_ICTOM_2010__Waris.pdf |