Management Of Multiple Projects In Pre-Design And Pre-Construction Phase
Construction Project Management is continuously getting the attention of the experts and day by day the field is getting new dimensions, views and perspectives. This knowledge has increased the competition among construction companies to procure many projects which have to be managed simultaneously...
| Main Authors: | C.T, Ramanathan, Sambu Potty, Narayanan |
|---|---|
| Format: | Conference or Workshop Item |
| Language: | English |
| Published: |
2009
|
| Subjects: | |
| Online Access: | http://scholars.utp.edu.my/id/eprint/2055/ http://scholars.utp.edu.my/id/eprint/2055/1/ciriac2009_%28Rama%29_final_paper.pdf |
Similar Items
TEAM BUILDING AND COORDINATION FOR DESIGN -BUILD MULTIPLE PROJECTS
by: C.T, Ramanathan, et al.
Published: (2007)
by: C.T, Ramanathan, et al.
Published: (2007)
MANAGEMENT OF CRITICAL SPECIALIST WORKS IN MULTIPLE BRIDGE PROJECTS: A CASE STUDY
by: Sambu Potty, Narayanan, et al.
Published: (2009)
by: Sambu Potty, Narayanan, et al.
Published: (2009)
SUSTAINABLE MANAGEMENT OF
MULTIPLE D&B INFRASTRUCTURE
PROJECTS IN RURAL AREAS OF SABAH
by: Sambu Potty, Narayanan, et al.
Published: (2010)
by: Sambu Potty, Narayanan, et al.
Published: (2010)
Multiple Infrastructure D&B Project Management in
Rural Areas in Malaysia
by: C.T, Ramanathan, et al.
Published: (2007)
by: C.T, Ramanathan, et al.
Published: (2007)
ELEMENT OPTIMISATION TECHNIQUES TO MANAGE MULTIPLE DB BRIDGE PROJECTS IN EAST MALAYSIA
by: C.T, Ramanathan, et al.
Published: (2008)
by: C.T, Ramanathan, et al.
Published: (2008)
Component Optimisation of Multiple D&B Bridge projects: A Case Study in Sabah, Malaysia
by: C.T., Ramanathan, et al.
Published: (2009)
by: C.T., Ramanathan, et al.
Published: (2009)
Pre-talent management for construction industry
by: Syed Ali, Sharifah Rahimatul-Hana
Published: (2005)
by: Syed Ali, Sharifah Rahimatul-Hana
Published: (2005)
Seismic Retrofit of Elevated Steel Water Tanks
by: Sambu Potty, Narayanan, et al.
Published: (2008)
by: Sambu Potty, Narayanan, et al.
Published: (2008)
Structural Integrity Management For
Fixed Offshore Platforms in Malaysia
by: Sambu Potty , Narayanan, et al.
Published: (2009)
by: Sambu Potty , Narayanan, et al.
Published: (2009)
Safety in pre-cast construction
by: Abdullah Thawaba, Bakeel Hassan
Published: (2007)
by: Abdullah Thawaba, Bakeel Hassan
Published: (2007)
LOAD AND RESISTANCE FACTOR CALIBRATION METHODOLOGY FOR OFFSHORE JACKET PLATFORMS IN MALAYSIA
by: Sambu Potty, Narayanan, et al.
Published: (2010)
by: Sambu Potty, Narayanan, et al.
Published: (2010)
OFFSHORE JACKET PLATFORMS – LRFD
CODE CALIBRATION
by: Sambu Potty, Narayanan, et al.
Published: (2010)
by: Sambu Potty, Narayanan, et al.
Published: (2010)
Pile-Sleeve Strength Modelling in API RP2A WSD,
LRFD and ISO 19902
by: Sambu Potty, Narayanan, et al.
Published: (2010)
by: Sambu Potty, Narayanan, et al.
Published: (2010)
Risks and Mitigation Measures in Build-
Operate-Transfer Projects
by: Syed Ahmad Bokharey, Syed Kamarul Bakri, et al.
Published: (2010)
by: Syed Ahmad Bokharey, Syed Kamarul Bakri, et al.
Published: (2010)
THE IMPORTANCE OF PRE-OPERATIONAL PHASE OF PRIVATE FINANCE INITIATIVE (PFI) PROJECT IN MALAYSIA
by: Ali Khan, M Waris, et al.
Published: (2009)
by: Ali Khan, M Waris, et al.
Published: (2009)
SUSTAINABLE INFRASTRUCTURE THROUGH
RATIONAL CODES USING RELIABILITY AND
CODE CALIBRATION
by: Sambu Potty , Narayanan, et al.
Published: (2010)
by: Sambu Potty , Narayanan, et al.
Published: (2010)
Strategic identification of flash flood risks in malaysian construction: Integrating stakeholder perspectives for enhanced resilience in pre-construction and construction phases
by: Mohammad Syamsyul Hairi, Saad, et al.
Published: (2025)
by: Mohammad Syamsyul Hairi, Saad, et al.
Published: (2025)
Integration of Environmental Sustainability Strategies Within Pre-Construction Processes
by: Mohammad Affendy, Omardin, et al.
Published: (2017)
by: Mohammad Affendy, Omardin, et al.
Published: (2017)
Responses of Square and Triangular TLPs
Subjected to Random Waves
by: M.A, Gasim, et al.
Published: (2008)
by: M.A, Gasim, et al.
Published: (2008)
Parametric Study of TLPs Subjected to
Random Waves
by: Kurian, V.J., et al.
Published: (2008)
by: Kurian, V.J., et al.
Published: (2008)
EAS458 – Pre-Stressed Concrete Design
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2022)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2022)
Design phase constructability assessment model
by: Mohamad Zin, Rosli
Published: (2004)
by: Mohamad Zin, Rosli
Published: (2004)
The delay at pre-tendering stage of projects in Accommodation and Works Directorate Ministry of Defense Kuala Lumpur
by: Gurmukh Singh, Lakhbir Singh
Published: (2007)
by: Gurmukh Singh, Lakhbir Singh
Published: (2007)
Mitigating construction waste in Nigeria: The role of Building Information Modeling (BIM) at design and pre-contract stages
by: Omer, Mazen M., et al.
Published: (2025)
by: Omer, Mazen M., et al.
Published: (2025)
A review on purposes of project manager’s leadership skills in pre-construction phase of sustainable construction projects
by: Noorul Adharina Zulkiffli,, et al.
Published: (2019)
by: Noorul Adharina Zulkiffli,, et al.
Published: (2019)
EAS453 – PRE-STRESSED CONCRETE DESIGN JUNE 2014
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2014)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2014)
EAS458 – Pre-Stressed Concrete Design
Duration : 1 hour
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2021)
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2021)
Determination of civil engineering construction time duration
by: Chong, C.T
Published: (2006)
by: Chong, C.T
Published: (2006)
Impacts of poor management on construction project in Malaysia
by: Nurul Ain Syafiqah, Sabri
Published: (2018)
by: Nurul Ain Syafiqah, Sabri
Published: (2018)
Factors effecting the cost management in construction projects
by: Albtoush, Faten Ahmad, et al.
Published: (2020)
by: Albtoush, Faten Ahmad, et al.
Published: (2020)
To review the effectiveness of project management in construction process
by: Noor Hafizatul Ashikin, Rozali
Published: (2015)
by: Noor Hafizatul Ashikin, Rozali
Published: (2015)
EAS453-2 - PRE-STRESSED CONCRETE DESIGN JUNE 2012
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2012)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2012)
EAS 452-3 - PRE-STRESSED CONCRETE DESIGN APRIL 08.
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2008)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2008)
Dynamic Response of Spar Platforms Subjected to
Waves and Current
by: O. A. A., Montasir, et al.
Published: (2008)
by: O. A. A., Montasir, et al.
Published: (2008)
PRACTICAL MODELLING ASPECTS FOR FINITE ELEMENT ANALYSIS OF SHEAR WALLS
by: Sambu Potty, Narayanan, et al.
Published: (2008)
by: Sambu Potty, Narayanan, et al.
Published: (2008)
Mega-project engineering-management processes: pre-planning phase evaluation for construction and mining
by: Albishri, Abdulaziz Ali M
Published: (2015)
by: Albishri, Abdulaziz Ali M
Published: (2015)
Improvement of a pre fabricate biogas digester tank
by: Mohd Abu Zar, Bahri
Published: (2012)
by: Mohd Abu Zar, Bahri
Published: (2012)
A Comprehensive Study On The Pre-Fabricated Modular House
by: Wee, Farrah Yee Zhen
Published: (2022)
by: Wee, Farrah Yee Zhen
Published: (2022)
EAS 452/3 - PRE-STRESSED CONCRETE DESIGN APR-MEI 09.
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2009)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2009)
EAS 452-3 – Pre-Stressed Concrete Design April May 2009
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2009)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2009)
Similar Items
-
TEAM BUILDING AND COORDINATION FOR DESIGN -BUILD MULTIPLE PROJECTS
by: C.T, Ramanathan, et al.
Published: (2007) -
MANAGEMENT OF CRITICAL SPECIALIST WORKS IN MULTIPLE BRIDGE PROJECTS: A CASE STUDY
by: Sambu Potty, Narayanan, et al.
Published: (2009) -
SUSTAINABLE MANAGEMENT OF
MULTIPLE D&B INFRASTRUCTURE
PROJECTS IN RURAL AREAS OF SABAH
by: Sambu Potty, Narayanan, et al.
Published: (2010) -
Multiple Infrastructure D&B Project Management in
Rural Areas in Malaysia
by: C.T, Ramanathan, et al.
Published: (2007) -
ELEMENT OPTIMISATION TECHNIQUES TO MANAGE MULTIPLE DB BRIDGE PROJECTS IN EAST MALAYSIA
by: C.T, Ramanathan, et al.
Published: (2008)